• BS 5192-6:1993

    Current The latest, up-to-date edition.

    Guide to production control Computer aided production control

    Available format(s):  Hardcopy, PDF

    Language(s):  English

    Published date:  15-05-1993

    Publisher:  British Standards Institution

    Add To Cart

    Table of Contents - (Show below) - (Hide below)

    Committees responsible
    Foreword
    Guide
    Introduction
    1. Scope
    2. References
    3. Definitions
    4. Specification of requirements
    5. Option selection of standard packages
    6. Bespoke systems
    7. System selection and justification
    8. Implementation
    9. Ongoing operation of computer aided production
        management (CAPM)
    10. Future trends
    Annexes
    A. (informative) Development of the use of computers
        in production control
    B. (informative) Production and inventory control
        software
    Table
    B.1 Standard modules and functions
    Figure
    1. Stages of production control
    List of references

    Abstract - (Show below) - (Hide below)

    Gives advice on the use of computers in production control. Does not describe the use of computers in other areas of business such as engineering management, computer aided design, purchasing, finance, maintenance, payroll, and sales order processing. Coverage includes definitions, bespoke systems, and future trends. Also gives detailed annexes.

    Scope - (Show below) - (Hide below)

    This Part of BS 5192 gives guidance on the use of computers in production control. It does not describe the use of computers in other areas of the business such as computer aided design, engineering management, finance, purchasing, payroll, maintenance and sales order processing. However, the techniques and requirements identified and recommended in this Part of BS 5192 for the establishment of a formal specification of requirement, selection and justification of a computerized production control system (either bespoke or a commercial package), installation and implementation of the system, together with the guidance on ongoing operational requirements and future trends, may be applicable not only to production control systems but equally to the professional evaluation, selection, implementation and operation of any business system in the manufacturing company.

    General Product Information - (Show below) - (Hide below)

    Committee W/-
    Development Note Supersedes 90/97592 DC. (07/2005) Reviewed and confirmed by BSI, November 2012. (10/2012)
    Document Type Standard
    Publisher British Standards Institution
    Status Current
    Supersedes

    Standards Referenced By This Book - (Show below) - (Hide below)

    BS 5192-1:1993 Guide to production control Introduction
    BS 5192-2:1993 Guide to production control Production programming
    BS 5192-4:1993 Guide to production control Dispatching (shop-floor control)

    Standards Referencing This Book - (Show below) - (Hide below)

    BS 5191:1975 Glossary of production planning and control terms
    BS 5192-3:1993 Guide to production control Ordering methods
    BS 5192-1:1993 Guide to production control Introduction
    • Access your standards online with a subscription

      Features

      • Simple online access to standards, technical information and regulations
      • Critical updates of standards and customisable alerts and notifications
      • Multi - user online standards collection: secure, flexibile and cost effective