• BS CECC 200000:1993

    Withdrawn A Withdrawn Standard is one, which is removed from sale, and its unique number can no longer be used. The Standard can be withdrawn and not replaced, or it can be withdrawn and replaced by a Standard with a different number.

    Harmonized system of quality assessment for electronic components. Requirements for process assessment schedules for process approval

    Available format(s):  Hardcopy, PDF

    Withdrawn date:  04-11-2009

    Language(s):  English

    Published date:  15-08-1993

    Publisher:  British Standards Institution

    Add To Cart

    Table of Contents - (Show below) - (Hide below)

    Contents
    Foreword
    Preface
    Introduction
    Section 1: General Introduction
    1. General
    1.1 CECC 00 114 Part V (RP 14/V)
    1.2 Process Assessment Schedules (PASs)
    1.3 Audit Check Lists
    Section 2: Preparation of Process Assessment Schedules
                                                  (PASs)
    1. General
    2. Requirements for Individual Clauses
    2.1 Introductory Information
    (a) Front Page
    (b) Organizations responsible for preparing a PAS
    (c) Foreword
    (d) Preface
    (e) Contents
    (f) Introduction
    2.2 General Requirements
    (a) Scope
    (b) Definitions
    (c) Related Documents
    (d) Units, Symbols and Terminology
    (e) Standard and Preferred Values
    2.3 Quality Requirements of the Process/Service
    (a) Process Description
    (b) Quality Factors
    (c) Process Specifications
    (d) Process Approval Programmes
    (e) Maintenance Programmes
    (f) Test Methods
    (g) Release to Customer
    (h) Modifications to Approval
    2.4 Specialist Contractor Documentation Requirement
    (a) Process Manual
    (b) Process Approval Reports
    (c) Abstract of Description of Process Approval
    (d) Specialist contractors Audit Preparation Plans
          - Internal Audit Preparation Plan
          - External Audit Preparation Plan
    2.5 Audits
    (a) Audit Check Lists
    (b) Internal Audits
    (c) External Audits
    2.6 Corrective Actions and Failure Analysis
    (a) Corrective Actions
    (b) Failure Analysis
    2.7 Contractor to Customer Interface
    2.8 Training
    2.9 Post Supply Liaison
    Annexes
    A. Structure of process approval documents
    B. Summary of introductory information, sections and
         clauses
    C. Style form and content of a PAS front page
    D. Form and content of process specifications
    E. Formulation of process approval programmes
    F. Guidelines for guidance to customer documents (GCDs)
    G. Guidelines for the generation of customer detail
         specifications (CDSs)
    H. Notification of drafting a PAS

    Abstract - (Show below) - (Hide below)

    Prepared for countries (taking part in a harmonized system for electronic components of assessed quality) who want to issue national harmonised specifications for specialist processes and services related to the manufacture of electronic components of assessed quality.

    General Product Information - (Show below) - (Hide below)

    Committee W/-
    Development Note Supersedes 92/32870 DC. (01/2006)
    Document Type Standard
    Publisher British Standards Institution
    Status Withdrawn
    Supersedes

    Standards Referenced By This Book - (Show below) - (Hide below)

    BS CECC 00111-0:1994 Rule of Procedure 11. Specifications An introduction to the types of specifications applicable within the CECC system
    BS CECC 00806:1997 Harmonized system of quality assessment for electronic components. Guide to total quality management (TQM) for CECC approved organizations
    BS CECC 00114-0:1994 Rule of procedure 14. Quality assessment procedures An introduction to the types of approval available under the CECC system
    BS CECC 00114-5:1993 Rule of procedure 14. Quality assessment procedures Process approval of specialist contractors within the electronic components industry
    CECC 00111-0 : 1993 RULE OF PROCEDURE 11 - SPECIFICATIONS - AN INTRODUCTION TO THE TYPES OF SPECIFICATIONS APPLICABLE WITHIN THE CECC SYSTEM

    Standards Referencing This Book - (Show below) - (Hide below)

    BS CECC 00114-5:1993 Rule of procedure 14. Quality assessment procedures Process approval of specialist contractors within the electronic components industry
    BS CECC 00114-1:1991 Rule of procedure 14. Quality assessment procedures Approval of manufacturers and other organizations
    BS 9000-2(1996) : 1996 GENERAL REQUIREMENTS FOR A SYSTEM FOR ELECTRONIC COMPONENTS OF ASSESSED QUALITY - SPECIFICATION FOR THE NATIONAL IMPLEMENTATION OF THE CECC SYSTEM
    BS 5750-0.1(1987) : 1987 QUALITY SYSTEMS - PRINCIPAL CONCEPTS AND APPLICATIONS - GUIDE TO SELECTION AND USE
    BS 4727(1971) : LATEST
    BS CECC 00114-0:1992 Rule of Procedure 14. Quality assessment procedures An introduction to the types of approval available under the CECC System
    BS 5555:1976 Specification for SI units and recommendations for the use of their multiples and of certain other units
    BS 2011-1:1967 The enviromental testing of electronic components and electronic equipment. General
    CECC 00401 : 91 AMD 1 GLOSSARY OF ABBREVIATIONS, TERMS AND DEFINITIONS OF THE CECC SYSTEM
    CECC 00400 : 86 ERRATUM 92 HANDBOOK FOR THE PRODUCTION OF CECC DOCUMENTS
    • Access your standards online with a subscription

      Features

      • Simple online access to standards, technical information and regulations
      • Critical updates of standards and customisable alerts and notifications
      • Multi - user online standards collection: secure, flexibile and cost effective