• BS EN 60255-22-4:2008

    Superseded A superseded Standard is one, which is fully replaced by another Standard, which is a new edition of the same Standard.

    Measuring relays and protection equipment Electrical disturbance tests. Electrical fast transient/burst immunity test

    Available format(s):  Hardcopy, PDF

    Superseded date:  31-07-2014

    Language(s):  English

    Published date:  31-07-2008

    Publisher:  British Standards Institution

    Add To Cart

    Table of Contents - (Show below) - (Hide below)

    1 Scope and object
    2 Normative references
    3 Terms and definitions
    4 Test severity level
    5 Test equipment
    6 Test set-up
      6.1 Test set-up using CDNs
      6.2 Test set-up using the capacitive coupling clamp
    7 Test procedure
    8 Criteria for acceptance
    9 Test report
    Annex A (informative) - Background information for fast
                            transient/burst immunity test
    Annex B (informative) - Examples of environments for Class A
                            and Class B test levels
    Annex ZA (normative) - Normative references to international
                           publications with their corresponding
                           European publications

    Abstract - (Show below) - (Hide below)

    Describes the general requirements for electrical fast transient immunity tests for measuring relays and protection equipment for power system protection, including the control, monitoring and process interface equipment used with these systems.

    Scope - (Show below) - (Hide below)

    IEC 60255-22-4:2008 specifies the general requirements for electrical fast transient immunity tests for measuring relays and protection equipment for power system protection, including the control, monitoring and process interface equipment used with these systems. Is based on IEC 61000-4-4. The objective of the tests is to confirm that the equipment under test will operate correctly when energized and subjected to repetitive fast transients (bursts) such as those originating from interrupting of inductive loads, relay contact bounce, etc. The main change with respect to the previous edition is the improvement of the test severity level regarding the repetition rate.

    General Product Information - (Show below) - (Hide below)

    Committee PEL/95
    Development Note Supersedes 99/205305 DC (10/2002) Supersedes 07/30165226 DC. (09/2008)
    Document Type Standard
    Publisher British Standards Institution
    Status Superseded
    Superseded By
    Supersedes

    Standards Referencing This Book - (Show below) - (Hide below)

    IEC 61000-4-4 : 3.0EN+(REDLINE+VERSION) ELECTROMAGNETIC COMPATIBILITY (EMC) - PART 4-4: TESTING AND MEASUREMENT TECHNIQUES - ELECTRICAL FAST TRANSIENT/BURST IMMUNITY TEST
    IEC 61000-4-4:2012 RLV Electromagnetic compatibility (EMC) - Part 4-4: Testing and measurement techniques - Electrical fast transient/burst immunity test
    EN 60255-6 : 94 AC 95 ELECTRICAL RELAYS - MEASURING RELAYS AND PROTECTION EQUIPMENT
    IEC 60255-6:1988 Electrical relays - Part 6: Measuring relays and protection equipment
    EN 61000-4-4:2012 ELECTROMAGNETIC COMPATIBILITY (EMC) - PART 4-4: TESTING AND MEASUREMENT TECHNIQUES - ELECTRICAL FAST TRANSIENT/BURST IMMUNITY TEST (IEC 61000-4-4:2012)
    • Access your standards online with a subscription

      Features

      • Simple online access to standards, technical information and regulations
      • Critical updates of standards and customisable alerts and notifications
      • Multi - user online standards collection: secure, flexibile and cost effective