• BS ISO 27914:2017

    Current The latest, up-to-date edition.

    Carbon dioxide capture, transportation and geological storage. Geological storage

    Available format(s):  Hardcopy, PDF

    Language(s):  English

    Published date:  25-10-2017

    Publisher:  British Standards Institution

    Add To Cart

    Scope - (Show below) - (Hide below)

    This document establishes requirements and recommendations for the geological storage of CO2 streams, the purpose of which is to promote commercial, safe, long-term containment of carbon dioxide in a way that minimizes risk to the environment, natural resources, and human health, is applicable for both onshore and offshore geological storage within permeable and porous geological strata including hydrocarbon reservoirs where a CO2 stream is not being injected for the purpose of hydrocarbon production or for storage in association with CO2-EOR, includes activities associated with site screening and selection, characterization, design and development, operation of storage sites, and preparation for site closure, recognizes that site selection and management are unique for each project and that intrinsic technical risk and uncertainty will be dealt with on a site-specific basis, acknowledges that permitting and approval by regulatory authorities will be required throughout the project life cycle, including the closure period, although the permitting process is not included in this document, provides requirements and recommendations for the development of management systems, community and other stakeholder engagement, risk assessment, risk management and risk communication, does not apply to, modify, interpret, or supersede any national or international regulations, treaties, protocols or instruments otherwise applicable to the activities addressed in this document, and does not apply to or modify any property rights or interests in the surface or the subsurface (including mineral rights), or any pre-existing commercial contract or arrangement relating to such property. The life cycle of a CO2 geological storage project covers all aspects, periods, and stages of the project, from those that lead to the start of the project (including site screening, selection, characterization, assessment, engineering, permitting, and construction), through the start of injection and proceeding through subsequent operations until cessation of injection and culminating in the post-injection period, which includes a closure period. Figure1 illustrates the limits of this document. NOTE1 This document does not address any post-closure period or specify post-closure period requirements. This document does not apply to the post-closure period, injection of CO2 for enhancing production of hydrocarbons or for storage associated with CO2-EOR, disposal of other acid gases except as considered part of the CO2 stream, disposal of waste and other matter added for purpose of disposal, CO2 injection and storage in coal, basalt, shale and salt caverns, or underground storage using any form of buried container. NOTE2 This document may not be suitable for research projects, for example, those with a primary objective to test technologies or methods of monitoring. NOTE3 The closure period in this document does overlap with the post-closure phase of the EU regulatory definition. This document, however, is not concerned with transfer of liability. Figure1 Entities involved in the storage project life cycle

    General Product Information - (Show below) - (Hide below)

    Committee PSE/265
    Development Note Supersedes 16/30292328 DC. (11/2017)
    Document Type Standard
    Publisher British Standards Institution
    Status Current
    Supersedes

    Standards Referencing This Book - (Show below) - (Hide below)

    API 10B-2 : 2013 RECOMMENDED PRACTICE FOR TESTING WELL CEMENTS
    API TR 10TR1 : 2008 CEMENT SHEATH EVALUATION
    ISO 10427-2:2004 Petroleum and natural gas industries Equipment for well cementing Part 2: Centralizer placement and stop-collar testing
    API 5CT : 2012 CASING AND TUBING
    ISO 10426-5:2004 Petroleum and natural gas industries — Cements and materials for well cementing — Part 5: Determination of shrinkage and expansion of well cement formulations at atmospheric pressure
    API 6A : 2010 SPECIFICATION FOR WELLHEAD AND CHRISTMAS TREE EQUIPMENT
    ISO 31000:2009 Risk management Principles and guidelines
    ISO 14313:2007 Petroleum and natural gas industries — Pipeline transportation systems — Pipeline valves
    API SPEC 15HR : 2016 HIGH-PRESSURE FIBERGLASS LINE PIPE
    NACE TM 01 77 : 2016 LABORATORY TESTING OF METALS FOR RESISTANCE TO SULFIDE STRESS CRACKING AND STRESS CORROSION CRACKING IN H[2]S ENVIRONMENTS
    CAN/CSA-Z662-15 Oil and gas pipeline systems
    API 10A : 2011 SPECIFICATION FOR CEMENTS AND MATERIALS FOR WELL CEMENTING
    ISO 10427-1:2001 Petroleum and natural gas industries — Equipment for well cementing — Part 1: Casing bow-spring centralizers
    ISO 10426-1:2009 Petroleum and natural gas industries Cements and materials for well cementing Part 1: Specification
    ISO 10426-2:2003 Petroleum and natural gas industries — Cements and materials for well cementing — Part 2: Testing of well cements
    ISO 10426-4:2004 Petroleum and natural gas industries Cements and materials for well cementing Part 4: Preparation and testing of foamed cement slurries at atmospheric pressure
    NACE MR 01 75 : 2003 METALS FOR SULFIDE STRESS CRACKING AND STRESS CORROSION CRACKING RESISTANCE IN SOUR OILFIELD ENVIRONMENTS
    API 65 : 2002 CEMENTING SHALLOW WATER FLOW ZONES IN DEEPWATER WELLS
    ISO 13678:2010 Petroleum and natural gas industries Evaluation and testing of thread compounds for use with casing, tubing, line pipe and drill stem elements
    API 15LR : 2001 SPECIFICATION FOR LOW PRESSURE FIBERGLASS LINE PIPE
    API 6J : 1992 BULLETIN ON TESTING OF OILFIELD ELASTOMERS - A TUTORIAL
    ISO 10427-3:2003 Petroleum and natural gas industries — Equipment for well cementing — Part 3: Performance testing of cementing float equipment
    ISO 14310:2008 Petroleum and natural gas industries — Downhole equipment — Packers and bridge plugs
    ISO 14001:2015 Environmental management systems — Requirements with guidance for use
    API 5C2 : 1999 BULLETIN ON PERFORMANCE PROPERTIES OF CASING, TUBING AND DRILL PIPE
    ISO/TR 27915:2017 Carbon dioxide capture, transportation and geological storage Quantification and verification
    API 5A3 : 2011 RECOMMENDED PRACTICE ON THREAD COMPOUNDS FOR CASING, TUBING, LINE PIPE, AND DRILL STEM ELEMENTS
    ISO 9001:2015 Quality management systems — Requirements
    API 6D :2015 SPECIFICATION FOR PIPELINE AND PIPING VALVES
    API SPEC 11D1 : 2015 PACKERS AND BRIDGE PLUGS
    API E3 : 1993 WELLBORE PLUGGING AND ABANDONMENT PRACTICES
    NORSOK D 010 : 2013 WELL INTEGRITY IN DRILLING AND WELL OPERATIONS
    • Access your standards online with a subscription

      Features

      • Simple online access to standards, technical information and regulations
      • Critical updates of standards and customisable alerts and notifications
      • Multi - user online standards collection: secure, flexibile and cost effective