• PD CLC/TR 50555:2010

    Current The latest, up-to-date edition.

    Interruption indexes

    Available format(s):  Hardcopy, PDF

    Language(s):  English

    Published date:  31-07-2011

    Publisher:  British Standards Institution

    Add To Cart

    Table of Contents - (Show below) - (Hide below)

    1 Introduction and scope
    2 Terms and definitions
    3 Continuity of supply - Interruptions
    4 Explanation of continuity
    5 Recommended continuity indices
    6 Recommended data collection and aggregation
    7 Information helpful when comparing continuity indices
    8 Trends, new and future developments
    Bibliography

    Abstract - (Show below) - (Hide below)

    Specifies guidance on how to calculate continuity of supply indices. These recommended indices are more particularly given for European benchmarking of distribution network performance.

    Scope - (Show below) - (Hide below)

    This Technical Report provides guidance on how to calculate continuity of supply indices. These recommended indices are more particularly given for European benchmarking of distribution network performance. For transmission network performance, more representative indices 2) may be used. It presents

    • an overview of practices in Europe on long and short interruptions,

    • definition of physical interruptions in a harmonized way,

    • philosophy and criteria for recommending indices,

    • a suggested common approach to continuity indices.

    The fact that the networks in different parts of any particular country will be subject to different conditions (e.g. weather and customer density) mean that it is not viable to apply common performance standards to all networks within any one country or any group of countries without making these targets so weak that there is a good prospect of them being achieved in all areas. The present situation where national regulators set performance targets within their own countries is widely regarded as being the most effective mechanism for achieving optimal socio-economic performance. For these reasons this Technical Report does not provide common targets for the number and duration of interruptions that should not be exceeded.

    This Technical Report is designed to be a first step towards benchmarking the interruption performance of European countries. Rules on the aggregation of interruptions, in particular short interruptions, have not been considered in this Technical Report, however it is recognised that it might be necessary to describe aggregation rules in a second version of the Technical Report.

    General Product Information - (Show below) - (Hide below)

    Committee GEL/8
    Document Type Standard
    Publisher British Standards Institution
    Status Current

    Standards Referencing This Book - (Show below) - (Hide below)

    IEEE 1366-2012 IEEE Guide for Electric Power Distribution Reliability Indices
    EN 50160 : 2010 AMD 1 2015 VOLTAGE CHARACTERISTICS OF ELECTRICITY SUPPLIED BY PUBLIC ELECTRICITY NETWORKS
    IEC 61000-4-30 : 3.0EN+(REDLINE+VERSION) ELECTROMAGNETIC COMPATIBILITY (EMC) - PART 4-30: TESTING AND MEASUREMENT TECHNIQUES - POWER QUALITY MEASUREMENT METHODS
    EN 61000-4-30:2015/AC:2017-01 ELECTROMAGNETIC COMPATIBILITY (EMC) - PART 4-30: TESTING AND MEASUREMENT TECHNIQUES - POWER QUALITY MEASUREMENT METHODS (IEC 61000-4-30:2015/COR1:2016)
    • Access your standards online with a subscription

      Features

      • Simple online access to standards, technical information and regulations
      • Critical updates of standards and customisable alerts and notifications
      • Multi - user online standards collection: secure, flexibile and cost effective