Foreword
Preface
Abbreviations
Introduction
1 Procedure for qualification approval
1.1 Eligibility for qualification approval
1.2 Use of specialist contractors and subcontracting
1.3 Application for qualification approval
1.4 Qualification approval testing
1.5 Granting of qualification approval
1.6 Qualification approval certificate
1.7 Maintenance of qualification approval
1.8 Procedure in the event of failure in a periodic test
1.9 Modifications likely to affect qualification approval
1.10 Withdrawal of qualification approval
1.11 Reinstatement of qualification approval
1.12 Suspension of qualification approval
2 Release for delivery and validity of release
2.1 Genera
2.2 Validity of release
2.3 Quality conformance inspection
2.4 Non conforming components in lot-by-lot tests
2.5 Defects in periodic tests
2.6 Release or rejection of lots
2.7 Identification of released lots
2.8 Enhanced assessment of quality
2.9 Switching rules for reduced inspection in Group C
3 Inspection lots
3.1 Formation of inspection lots
3.2 Structurally similar components
4 Specifications
4.1 Generic and sectional specifications
4.2 Detail specifications for components
5 CECC 00 200: Register of firms, products, and
services approved under the CECC System