• IEEE 1775:2010

    Withdrawn A Withdrawn Standard is one, which is removed from sale, and its unique number can no longer be used. The Standard can be withdrawn and not replaced, or it can be withdrawn and replaced by a Standard with a different number.

    POWER LINE COMMUNICATION EQUIPMENT - ELECTROMAGNETIC COMPATIBILITY (EMC) REQUIREMENTS - TESTING AND MEASUREMENT METHODS

    Available format(s): 

    Withdrawn date:  17-10-2023

    Language(s): 

    Published date:  07-01-2011

    Publisher:  Institute of Electrical & Electronics Engineers

    Sorry this product is not available in your region.

    Add To Cart

    Table of Contents - (Show below) - (Hide below)

    1. Overview
    2. Normative references
    3. Definitions, acronyms, and abbreviations
    4. BPL networks typical installations
    5. Environmental conditions during testing
    6. General operational conditions and test configurations
    7. Disturbance emission measurement methods
    8. Immunity test methods and criteria
    Annex A (normative) - Procedure for determining distance
                          correction factor
    Annex B (informative) - Emission and Immunity Test Report
                            content
    Annex C (informative) - Methods for distinguishing BPL
                            signals from ambient signals
    Annex D (informative) - Radiated emissions measurement
                            uncertainty
    Annex E (informative) - Selection of typical installations
    Annex F (informative) - Recommendations for resolving
            harmful interference cases near BPL equipment and
            installations
    Annex G (informative) - Bibliography

    Abstract - (Show below) - (Hide below)

    Specifies electromagnetic compatibility (EMC) criteria and consensus test and measurements procedures for broadband over power line (BPL) communication equipment and installations.

    General Product Information - (Show below) - (Hide below)

    Document Type Standard
    Publisher Institute of Electrical & Electronics Engineers
    Status Withdrawn

    Standards Referenced By This Book - (Show below) - (Hide below)

    IEC TR 62351-13:2016 Power systems management and associated information exchange - Data and communications security - Part 13: Guidelines on security topics to be covered in standards and specifications
    IEEE 1909.1-2014 IEEE Recommended Practice for Smart Grid Communications Equipment -- Test Methods and Installation Requirements

    Standards Referencing This Book - (Show below) - (Hide below)

    IEC 61000-4-8 : 2.0 ELECTROMAGNETIC COMPATIBILITY (EMC) - PART 4-8: TESTING AND MEASUREMENT TECHNIQUES - POWER FREQUENCY MAGNETIC FIELD IMMUNITY TEST
    ISO/IEC 17025:2005 General requirements for the competence of testing and calibration laboratories
    CISPR 16-4-2:2011+AMD1:2014 CSV Specification for radio disturbance and immunity measuring apparatusand methods - Part 4-2: Uncertainties, statistics and limit modelling - Measurement instrumentation uncertainty
    IEC 61000-4-4 : 3.0EN+(REDLINE+VERSION) ELECTROMAGNETIC COMPATIBILITY (EMC) - PART 4-4: TESTING AND MEASUREMENT TECHNIQUES - ELECTRICAL FAST TRANSIENT/BURST IMMUNITY TEST
    CISPR 16-1-4:2010+AMD1:2012+AMD2:2017 CSV Specification for radio disturbance and immunity measuring apparatus and methods - Part 1-4: Radio disturbance and immunity measuring apparatus - Antennas and test sites for radiated disturbance measurements
    CISPR 16-1-1:2015 Specification for radio disturbance and immunity measuring apparatus and methods - Part 1-1: Radio disturbance and immunity measuring apparatus - Measuring apparatus
    IEC 61000-4-11:2004+AMD1:2017 CSV Electromagnetic compatibility (EMC) - Part 4-11: Testing and measurement techniques - Voltage dips, short interruptions and voltage variations immunity tests
    CISPR 16-2-1:2014 Specification for radio disturbance and immunity measuring apparatus and methods - Part 2-1: Methods of measurement of disturbances and immunity - Conducted disturbance measurements
    IEC 61000-4-8:2009 Electromagnetic compatibility (EMC) - Part 4-8: Testing and measurement techniques - Power frequency magnetic field immunity test
    IEC 61000-4-4:2012 RLV Electromagnetic compatibility (EMC) - Part 4-4: Testing and measurement techniques - Electrical fast transient/burst immunity test
    TR 102 258 : 1.1.1 POWERLINE TELECOMMUNICATIONS (PLT); LCL REVIEW AND STATISTICAL ANALYSIS
    IEEE/ANSI C63.6-1996 American National Standard Guide for the Computation of Errors in Open-Area Test Site Measurements
    TR 102 175 : 1.1.1 POWER LINE TELECOMMUNICATIONS (PLT) CHANNEL CHARACTERIZATION AND MEASUREMENT METHODS
    CFR 47(PTS0-19) : OCT 2017 TELECOMMUNICATION - FEDERAL COMMUNICATIONS COMMISSION
    IEC 61000-4-6 : 4.0 ELECTROMAGNETIC COMPATIBILITY (EMC) - PART 4-6: TESTING AND MEASUREMENT TECHNIQUES - IMMUNITY TO CONDUCTED DISTURBANCES, INDUCED BY RADIO-FREQUENCY FIELDS
    IEC 61000-4-6:2013 Electromagnetic compatibility (EMC) - Part 4-6: Testing and measurement techniques - Immunity to conducted disturbances, induced by radio-frequency fields
    CISPR 22:2008 Information technology equipment - Radio disturbance characteristics - Limits and methods of measurement
    TR 102 259 : 1.1.1 POWERLINE TELECOMMUNICATIONS (PLT); EMI REVIEW AND STATISTICAL ANALYSIS
    TR 102 324 : 1.1.1 POWERLINE TELECOMMUNICATIONS (PLT); RADIATED EMISSIONS' CHARACTERISTICS AND MEASUREMENT METHOD OF STATE OF THE ART POWERLINE COMMUNICATION NETWORKS
    IEC 61000-3-8:1997 Electromagnetic compatibility (EMC) - Part 3: Limits - Section 8: Signalling on low-voltage electrical installations - Emission levels, frequency bands and electromagnetic disturbance levels
    TR 102 269 : 1.1.1 POWERLINE TELECOMMUNICATIONS (PLT); HIDDEN NODE REVIEW AND STATISTICAL ANALYSIS
    IEC 61000-4-2:2008 Electromagnetic compatibility (EMC) - Part 4-2: Testing and measurement techniques - Electrostatic discharge immunity test
    IEC 61000-4-3:2006+AMD1:2007+AMD2:2010 CSV Electromagnetic compatibility (EMC) - Part 4-3: Testing and measurement techniques - Radiated, radio-frequency, electromagnetic field immunity test
    CISPR 16-2-3:2016 Specification for radio disturbance and immunity measuring apparatus and methods - Part 2-3: Methods of measurement of disturbances and immunity - Radiated disturbance measurements
    IEC 61000-3-3:2013 RLV Electromagnetic compatibility (EMC) - Part 3-3: Limits - Limitation of voltage changes, voltage fluctuations and flicker in public low-voltage supply systems, for equipment with rated current ≤ 16 A per phase and not subject to conditional connection
    EN 50412-2-1 : 2005 COR 2009 POWER LINE COMMUNICATION APPARATUS AND SYSTEMS USED IN LOW-VOLTAGE INSTALLATIONS IN THE FREQUENCY RANGE 1,6 MHZ TO 30 MHZ - PART 2-1: RESIDENTIAL, COMMERCIAL AND INDUSTRIAL ENVIRONMENT - IMMUNITY REQUIREMENTS
    IEC 61000-3-3 : 3.0EN+(REDLINE+VERSION) ELECTROMAGNETIC COMPATIBILITY (EMC) - PART 3-3: LIMITS - LIMITATION OF VOLTAGE CHANGES, VOLTAGE FLUCTUATIONS AND FLICKER IN PUBLIC LOW-VOLTAGE SUPPLY SYSTEMS, FOR EQUIPMENT WITH RATED CURRENT <= 16 A PER PHASE AND NOT SUBJECT TO CONDITIONAL CONNECTION
    CISPR 11:2015 RLV Industrial, scientific and medical equipment - Radio-frequency disturbance characteristics - Limits and methods of measurement
    TR 102 616 : 1.1.1 POWERLINE TELECOMMUNICATIONS (PLT); REPORT FROM PLUGTESTS[TM] 2007 ON COEXISTENCE BETWEEN PLT AND SHORT WAVE RADIO BROADCAST; TEST CASES AND RESULTS
    CISPR 24:2010+AMD1:2015 CSV Information technology equipment - Immunity characteristics - Limitsand methods of measurement
    TR 102 270 : 1.1.1 POWERLINE TELECOMMUNICATION (PLT); BASIC LOW VOLTAGE DISTRIBUTION NETWORK (LVDN) MEASUREMENT DATA
    IEC 61000-3-2 : 4.0 ELECTROMAGNETIC COMPATIBILITY (EMC) - PART 3-2: LIMITS - LIMITS FOR HARMONIC CURRENT EMISSIONS (EQUIPMENT INPUT CURRENT <= 16 A PER PHASE)
    • Access your standards online with a subscription

      Features

      • Simple online access to standards, technical information and regulations
      • Critical updates of standards and customisable alerts and notifications
      • Multi - user online standards collection: secure, flexibile and cost effective