NORSOK D 001 : REV 3 COR 2013
|
DRILLING FACILITIES |
API 10B-3 : 2016
|
TESTING OF WELL CEMENTS USED IN DEEPWATER WELL CONSTRUCTION |
ISO 13628-1:2005
|
Petroleum and natural gas industries — Design and operation of subsea production systems — Part 1: General requirements and recommendations |
ISO 10405:2000
|
Petroleum and natural gas industries — Care and use of casing and tubing |
API 5CT : 2012
|
CASING AND TUBING |
API 6A : 2010
|
SPECIFICATION FOR WELLHEAD AND CHRISTMAS TREE EQUIPMENT |
ISO 13679:2002
|
Petroleum and natural gas industries Procedures for testing casing and tubing connections |
API 6FC : 2009
|
SPECIFICATION FOR FIRE TEST FOR VALVES WITH AUTOMATIC BACKSEATS |
API 14A : 2015
|
SPECIFICATION FOR SUBSURFACE SAFETY VALVE EQUIPMENT |
ISO 10416:2008
|
Petroleum and natural gas industries — Drilling fluids — Laboratory testing |
API 5DP : 2010(R2015)
|
SPECIFICATION FOR DRILL PIPE |
API 10A : 2011
|
SPECIFICATION FOR CEMENTS AND MATERIALS FOR WELL CEMENTING |
NORSOK D-002 : 2013
|
WELL INTERVENTION EQUIPMENT |
ISO 10417:2004
|
Petroleum and natural gas industries Subsurface safety valve systems Design, installation, operation and redress |
ISO 10414-2:2011
|
Petroleum and natural gas industries Field testing of drilling fluids Part 2: Oil-based fluids |
ISO 10426-1:2009
|
Petroleum and natural gas industries Cements and materials for well cementing Part 1: Specification |
API SPEC 16RCD : 2015
|
SPECIFICATION FOR ROTATING CONTROL DEVICES |
ISO 13628-7:2005
|
Petroleum and natural gas industries — Design and operation of subsea production systems — Part 7: Completion/workover riser systems |
ASTM G 111 : 1997
|
Standard Guide for Corrosion Tests in High Temperature or High Pressure Environment, or Both |
ISO 10427-3:2003
|
Petroleum and natural gas industries — Equipment for well cementing — Part 3: Performance testing of cementing float equipment |
ISO 28781:2010
|
Petroleum and natural gas industries Drilling and production equipment Subsurface barrier valves and related equipment |
ISO 14310:2008
|
Petroleum and natural gas industries — Downhole equipment — Packers and bridge plugs |
API 5C2 : 1999
|
BULLETIN ON PERFORMANCE PROPERTIES OF CASING, TUBING AND DRILL PIPE |
ISO 13533:2001
|
Petroleum and natural gas industries — Drilling and production equipment — Drill-through equipment |
API RP 14B : 2015
|
DESIGN, INSTALLATION, OPERATION, TEST, AND REDRESS OF SUBSURFACE SAFETY VALVE SYSTEMS |
ISO 15156-1:2015
|
Petroleum and natural gas industries Materials for use in H2S-containing environments in oil and gas production Part 1: General principles for selection of cracking-resistant materials |
ISO 13628-4:2010
|
Petroleum and natural gas industries — Design and operation of subsea production systems — Part 4: Subsea wellhead and tree equipment |
ISO 10423:2009
|
Petroleum and natural gas industries Drilling and production equipment Wellhead and christmas tree equipment |
API 5C3 : 1994
|
BULLETIN ON FORMULAS AND CALCULATIONS FOR CASING, TUBING, DRILL PIPE AND LINE PIPE PROPERTIES |
ISO 10432:2004
|
Petroleum and natural gas industries Downhole equipment Subsurface safety valve equipment |
ISO/TR 10400:2007
|
Petroleum and natural gas industries Equations and calculations for the properties of casing, tubing, drill pipe and line pipe used as casing or tubing |
ISO 10497:2010
|
Testing of valves — Fire type-testing requirements |
ISO 10424-1:2004
|
Petroleum and natural gas industries Rotary drilling equipment Part 1: Rotary drill stem elements |
ISO 17078-2:2007
|
Petroleum and natural gas industries — Drilling and production equipment — Part 2: Flow-control devices for side-pocket mandrels |
ASTM D 471 : 2016-02
|
TEST METHOD FOR RUBBER PROPERTY - EFFECT OF LIQUIDS |
API 53 : 2012
|
BLOWOUT PREVENTION EQUIPMENT SYSTEMS FOR DRILLING WELLS |
API 17D : 2011
|
DESIGN AND OPERATION OF SUBSEA PRODUCTION SYSTEMS - SUBSEA WELLHEAD AND TREE EQUIPMENT |
ISO 11960:2014
|
Petroleum and natural gas industries Steel pipes for use as casing or tubing for wells |
ISO 10414-1:2008
|
Petroleum and natural gas industries — Field testing of drilling fluids — Part 1: Water-based fluids |