AAP-48 : 2013
|
NATO SYSTEM LIFE CYCLE STAGES AND PROCESSES |
DEFSTAN 66-31(PT5)/2(2008) : 2008
|
BASIC REQUIREMENTS & TESTS FOR ELECTRONIC & ELECTRICAL TEST & MEASUREMENT EQUIPMENT - PART 5: CONTRACTOR REQUIREMENTS - LAND USE APPLICATION |
DEFSTAN 00-970(PT0)/9(2012) : 2012
|
DESIGN AND AIRWORTHINESS REQUIREMENTS FOR SERVICE AIRCRAFT - PART 0: PROCEDURES FOR USE, CONTENT AND DEFINITIONS |
DEFSTAN 61-23 SUPP001/1(2011) : 2011
|
GENERIC FUEL CELL - SUPPLEMENT 1: METHANOL FUEL CELL SYSTEM |
DEFSTAN 66-31(PT1)/2(2008) : 2008
|
BASIC REQUIREMENTS AND TESTS FOR ELECTRONIC AND ELECTRICAL TEST AND MEASUREMENT EQUIPMENT - PART 1: INTRODUCTION AND GUIDE TO THE SPECIFICATION AND SELECTION OF TEST AND MEASUREMENT EQUIPMENT BY THE PROCURING AUTHORITY |
DEFSTAN 00-970(PT0)/17(2016) : 2016
|
DESIGN AND AIRWORTHINESS REQUIREMENTS FOR SERVICE AIRCRAFT - PART 0: PROCEDURES FOR USE, CONTENT AND DEFINITIONS |
DEFSTAN 00-970(PT0)/14(2014) : 2014
|
DESIGN AND AIRWORTHINESS REQUIREMENTS FOR SERVICE AIRCRAFT - PART 0: PROCEDURES FOR USE, CONTENT AND DEFINITIONS |
DEFSTAN 00-970(PT9)/5(2009) : 2009
|
DESIGN AND AIRWORTHINESS REQUIREMENTS FOR SERVICE AIRCRAFT - PART 9: UAV SYSTEMS |
DEFSTAN 00-970(PT0)/7(2011) : 2011
|
DESIGN AND AIRWORTHINESS REQUIREMENTS FOR SERVICE AIRCRAFT - PART 0: PROCEDURES FOR USE, CONTENT AND DEFINITIONS |
DEFSTAN 00-970(PT0)/13(2014) : 2014
|
DESIGN AND AIRWORTHINESS REQUIREMENTS FOR SERVICE AIRCRAFT - PART 0: PROCEDURES FOR USE, CONTENT AND DEFINITIONS |
DEFSTAN 00-970(PT0)/11(2013) : 2013
|
DESIGN AND AIRWORTHINESS REQUIREMENTS FOR SERVICE AIRCRAFT - PART 0: PROCEDURES FOR USE, CONTENT AND DEFINITIONS |
DEFSTAN 66-31(PT3)/2(2008) : 2008
|
BASIC REQUIREMENTS & TESTS FOR ELECTRONIC & ELECTRICAL TEST & MEASUREMENT EQUIPMENT - PART 3: CONTRACTOR REQUIREMENTS - AIR USE APPLICATION |
DEFSTAN 00-970(PT0)/15(2015) : 2015
|
DESIGN AND AIRWORTHINESS REQUIREMENTS FOR SERVICE AIRCRAFT - PART 0: PROCEDURES FOR USE, CONTENT AND DEFINITIONS |
DEFSTAN 00-970(PT0)/12(2014) : 2014
|
DESIGN AND AIRWORTHINESS REQUIREMENTS FOR SERVICE AIRCRAFT - PART 0: PROCEDURES FOR USE, CONTENT AND DEFINITIONS |
DEFSTAN 66-31(PT3)/1(2007) : 2007
|
BASIC REQUIREMENTS & TESTS FOR ELECTRONIC & ELECTRICAL TEST & MEASUREMENT EQUIPMENT - PART 3: CONTRACTOR REQUIREMENTS - AIR USE APPLICATION |
DEFSTAN 00-970(PT0)/8(2011) : 2011
|
DESIGN AND AIRWORTHINESS REQUIREMENTS FOR SERVICE AIRCRAFT - PART 0: PROCEDURES FOR USE, CONTENT AND DEFINITIONS |
DEFSTAN 66-31(PT1)/1(2007) : 2007
|
BASIC REQUIREMENTS & TESTS FOR ELECTRONIC & ELECTRICAL TEST & MEASUREMENT EQUIPMENT - PART 1: INTRODUCTION AND GUIDE TO THE SPECIFICATION AND SELECTION OF TEST AND MEASUREMENT EQUIPMENT BY THE PROCURING AUTHORITY |
DEFSTAN 00-970(PT0)/10(2013) : 2013
|
DESIGN AND AIRWORTHINESS REQUIREMENTS FOR SERVICE AIRCRAFT - PART 0: PROCEDURES FOR USE, CONTENT AND DEFINITIONS |
DEFSTAN 00-970(PT0)/16(2015) : 2015
|
DESIGN AND AIRWORTHINESS REQUIREMENTS FOR SERVICE AIRCRAFT - PART 0: PROCEDURES FOR USE, CONTENT AND DEFINITIONS |
STANAG 4493 : 2007
|
TANK AMMUNITION, SAFETY AND SUITABILITY FOR SERVICE EVALUATION |
AOP 20 : 2017
|
SAFETY, ARMING AND FUNCTIONING SYSTEMS MANUAL OF TESTS |
DEFSTAN 66-31(PT4)/1(2007) : 2007
|
BASIC REQUIREMENTS & TESTS FOR ELECTRONIC & ELECTRICAL TEST & MEASUREMENT EQUIPMENT - PART 4: CONTRACTOR REQUIREMENTS - NAVAL USE APPLICATION |
AAS3P-1 : 2011
|
ALLIED AMMUNITION SAFETY AND SUITABILITY FOR SERVICE ASSESSMENT TESTING PUBLICATION - GUIDANCE |
AOP 64 : 2017
|
IN-SERVICE SURVEILLANCE OF MUNITIONS CONDITION MONITORING OF ENERGETIC MATERIALS |
AECTP-600 : 2007
|
THE TEN STEP METHOD FOR EVALUATING THE ABILITY OF MATERIEL TO MEET EXTENDED LIFE REQUIREMENTS AND ROLE AND DEPLOYMENT CHANGES |
AECTP-500 : 2016
|
ELECTROMAGNETIC ENVIRONMENTAL EFFECTS TESTS AND VERIFICATION |
STANAG 4416 : 0
|
NUCLEAR ELECTROMAGNETIC PULSE TESTING OF MUNITIONS CONTAINING ELECTRO-EXPLOSIVE DEVICES |
AEP-4495 : 2016
|
GUIDANCE FOR THE PROCUREMENT OF LASER EYE PROTECTION (LEP) FOR THE INDIVIDUAL MILITARY USER |
DEFSTAN 66-31(PT4)/2(2008) : 2008
|
BASIC REQUIREMENTS & TESTS FOR ELECTRONIC & ELECTRICAL TEST & MEASUREMENT EQUIPMENT - PART 4: CONTRACTOR REQUIREMENTS - NAVAL USE APPLICATION |
MIL-STD-810 Revision G:2008
|
ENVIRONMENTAL ENGINEERING CONSIDERATIONS AND LABORATORY TESTS |
STANAG 4519 : 0
|
GAS GENERATORS, DESIGN SAFETY PRINCIPLES AND SAFETY AND SUITABILITY FOR SERVICE EVALUATION |
STANAG 4560 : 2016
|
ELECTRO-EXPLOSIVE DEVICES, ASSESSMENT AND TEST METHODS FOR CHARACTERIZATION - AOP-43 EDITION 3 |
STANAG 4497 : 2016
|
HAND-EMPLACED MUNITIONS (HEM), PRINCIPLES FOR SAFE DESIGN |
AOP 31 : 0
|
DEMOLITION MATERIEL - DESIGN PRINCIPLES |
STANAG 4187 : 2007
|
FUZING SYSTEMS - SAFETY DESIGN REQUIREMENTS |
STANAG 4599 : 2007
|
WEAPON LAUNCHED GRENADE SYSTEMS, DESIGN SAFETY REQUIREMENTS AND SAFETY AND SUITABILITY FOR SERVICE EVALUATION |
STANAG 4516 : 0
|
CANNON (12.7 TO 40MM), DESIGN SAFETY REQUIREMENTS AND SAFETY AND SUITABILITY FOR SERVICE EVALUATION |
DEFSTAN 00-035(PT3)/5(2017) : 2017
|
ENVIRONMENTAL HANDBOOK FOR DEFENCE MATERIEL - PART 3: ENVIRONMENTAL TEST METHODS |
STANAG 4423 : 2003
|
CANNON AMMUNITION (12.7 TO 40 MM), SAFETY AND SUITABILITY FOR SERVICE EVALUATION |
AOP-63 Ed: A Ver. 1:2017
|
IN-SERVICE SURVEILLANCE OF MUNITIONS SAMPLING AND TEST PROCEDURES |
DEFSTAN 66-31(PT5)/1(2007) : 2007
|
BASIC REQUIREMENTS & TESTS FOR ELECTRONIC & ELECTRICAL TEST & MEASUREMENT EQUIPMENT - PART 5: CONTRACTOR REQUIREMENTS - LAND USE APPLICATION |
MIL-STD-2105 Revision D:2011
|
HAZARD ASSESSMENT TESTS FOR NON-NUCLEAR MUNITIONS |
STANAG 4517 : 2007
|
LARGE CALIBRE ORDNANCE/MUNITION COMPATIBILITY DESIGN SAFETY REQUIREMENTS AND SAFETY AND SUITABILITY FOR SERVICE EVALUATION |
AOP 62 : 2017
|
IN-SERVICE SURVEILLANCE OF MUNITIONS GENERAL GUIDANCE |
STANAG 4667 : 2011
|
GUN LAUNCHED GUIDED MUNITIONS, SAFETY AND SUITABILITY FOR SERVICE EVALUATION |
AAS3P-10 : 2011
|
SAFETY AND SUITABILITY FOR SERVICE ASSESSMENT TESTING FOR SHOULDER LAUNCHED MUNITIONS |