• BS 6079-1:2000

    Superseded A superseded Standard is one, which is fully replaced by another Standard, which is a new edition of the same Standard.

    Project management Guide to project management

    Available format(s):  Hardcopy, PDF

    Superseded date:  28-05-2002

    Language(s):  English

    Published date:  15-01-2000

    Publisher:  British Standards Institution

    Add To Cart

    Table of Contents - (Show below) - (Hide below)

    Committees responsible
    1 General
          Introduction
          1.1 Scope
          1.2 References
          1.3 Definitions
    2 The corporate aspects of project management
          2.1 General
          2.2 Nature of projects
          2.3 The work to be done
          2.4 The project life cycle
          2.5 The benefits of project management
    3 Project and company organizational structures
          3.1 General
          3.2 The hierarchical functional organization
          3.3 The matrix organization
          3.4 The project organization
          3.5 Criteria for reorganization
    4 The project management process
          4.1 General
          4.2 The project management process: introduction
          4.3 The project management process: planning
          4.4 The project management process: control
          4.5 The project plan
          4.6 Processes supporting the project management
                 process
          4.7 Project personnel development
    5 Project lifecycle
          5.1 General
          5.2 Types of project
          5.3 Project phasing
          5.4 Project phase sequence
          5.5 Description of phase content
    Annex A (informative) Project management methodology:
                          cost/schedule control system criteria
                          (C/SCSC)
    Figure 1 - Arrangement of project phases, stages and
               milestones
    Figure 2 - Authority relationships in organization structures
    Figure 3 - Project management process flow
    Figure 4 - Model work breakdown structure
    Figure 5 - Model bar chart
    Figure 6 - Typical cumulative cost pattern
    Figure 7 - Format of cash flow forecast
    Figure 8 - Earned value chart
    Figure 9 - Project management life cycle
    Figure 10 - Periodic estimate of project cost and finishing
                date
    Table 1 - Model project plan
    Table 2 - Example of discounted cash flow
    Table 3 - List of typical project phases
    List of references

    Abstract - (Show below) - (Hide below)

    Gives guidance on execution and planning of projects and the application of project management techniques. Relevant to projects in the public sector and many industries, abroad and at home. Procedures and principles are outlined in all sizes of organization, although they may not cover all aspects of every conceivable type and size of project. Note, that by definition, projects will have differing emphases and priorities.

    General Product Information - (Show below) - (Hide below)

    Committee MS/2
    Development Note Supersedes and renumbers BS 6079(1996) (12/1999) Also available as a part of BS KIT 3, BS KIT 13 and BS KIT 19. Supersedes 94/408410 DC, 94/408411 DC, 94/408412 DC, and 97/403015 DC (03/2002)
    Document Type Standard
    Publisher British Standards Institution
    Status Superseded
    Superseded By
    Supersedes

    Standards Referenced By This Book - (Show below) - (Hide below)

    BS 7373-2:2001 Product specifications Guide to identifying criteria for a product specification and to declaring product conformity
    BS HB 10181(2001) : 2001 TRANSITION TO ISO 9001:2000 - GUIDANCE ON ISO 9001:2000, QUALITY MANAGEMENT SYSTEMS - REQUIREMENTS
    BS 6079-2:2000 Project management Vocabulary
    BS 7000-5:2001 Design management systems Design management systems. Guide to managing obsolescence
    PREN 9200 : 200P1 AEROSPACE SERIES - PROGRAMME MANAGEMENT - GUIDELINES FOR PROJECT MANAGEMENT SPECIFICATION
    BS EN 9200:2004 Programme management. Guidelines for project management specification
    EN 9200:2004 Aerospace series - Programme management - Guidelines for project management specification

    Standards Referencing This Book - (Show below) - (Hide below)

    BS 3811:1993 Glossary of terms used in terotechnology
    BS 4335:1987 Glossary of terms used in project network techniques
    BS 7000-10:1995 Design management systems Glossary of terms used in design management
    BS EN ISO 8402:1995 Quality management and quality assurance. Vocabulary
    • Access your standards online with a subscription

      Features

      • Simple online access to standards, technical information and regulations
      • Critical updates of standards and customisable alerts and notifications
      • Multi - user online standards collection: secure, flexibile and cost effective