• CEI UNI EN 45510-5-1 : 2000

    Current The latest, up-to-date edition.

    GUIDE FOR PROCUREMENT OF POWER STATION EQUIPMENT - PART 5-1: STEAM TURBINES

    Available format(s):  Hardcopy, PDF

    Language(s):  English

    Published date:  01-01-2000

    Publisher:  Comitato Elettrotecnico Italiano

    Add To Cart

    Table of Contents - (Show below) - (Hide below)

    Foreword
    1 Scope
    2 Normative references
    3 Definitions
    4 Brief overall project description
    5 Extent of supply
    6 Terminal points
    7 Operational requirements
    8 Life expectancy
    9 Performance requirements
    10 Design and fabrication
    11 Maintenance requirements
    12 Technical documentation requirements
    13 Applicable legislation, regulations, standards
       and further requirements
    14 Evaluation criteria
    15 Quality measures
    16 Site factors
    17 Verification of specified performance
    Annex A (informative) - Bibliography
    Annex B (informative) - Terminal points of supply
    Annex C (informative) - Schedule for performance
            specification
    Annex D (informative) - Design information to be
            provided by the supplier
    Annex E (informative) - Maintenance schedule
    Annex F (informative) - Purpose and extent of documentation

    Abstract - (Show below) - (Hide below)

    Describes the technical specification for procuring steam turbines driving generators, to be used in electricity generating stations (power stations).

    General Product Information - (Show below) - (Hide below)

    Committee CT 4/5
    Development Note Classificazione CEI 5-23 (08/2001) To be used in conjunction with CEI EN 60045-1:1996-03. (07/2005)
    Document Type Standard
    Publisher Comitato Elettrotecnico Italiano
    Status Current

    Standards Referencing This Book - (Show below) - (Hide below)

    IEC 61063:1991 Acoustics - Measurement of airborne noise emitted by steam turbines and driven machinery
    EN 60953-1:1995 Rules for steam turbine thermal acceptance tests - Part 1: Method A - High accuracy for large condensing steam turbines
    EN ISO 9002:1994/AC:1997 QUALITY SYSTEMS - SPECIFICATION FOR PRODUCTION AND INSTALLATION
    ISO 8402:1994 Quality management and quality assurance — Vocabulary
    EN 45510-8-1:1998 GUIDE FOR PROCUREMENT OF POWER STATION EQUIPMENT - PART 8-1: CONTROL AND INSTRUMENTATION
    EN 60953-2:1995 Rules for steam turbine thermal acceptance tests - Part 2: Method B - Wide range of accuracy for various types and sizes of turbines
    IEC 60953-1:1990 Rules for steam turbine thermal acceptance tests. Part 1: Method A - High accuracy for large condensing steam turbines
    EN ISO 9001:2015 Quality management systems - Requirements (ISO 9001:2015)
    ISO 9001:2015 Quality management systems — Requirements
    IEC 60953-2:1990 Rules for steam turbine thermal acceptance tests. Part 2: Method B - Wide range of accuracy for various types and sizes of turbines
    EN ISO 8402 : 1995 QUALITY MANAGEMENT AND QUALITY ASSURANCE - VOCABULARY
    EN 60045-1:1993 Steam turbines - Part 1: Specifications
    ISO 128:1982 Technical drawings — General principles of presentation
    ISO 7200:2004 Technical product documentation — Data fields in title blocks and document headers
    • Access your standards online with a subscription

      Features

      • Simple online access to standards, technical information and regulations
      • Critical updates of standards and customisable alerts and notifications
      • Multi - user online standards collection: secure, flexibile and cost effective