09/30176792 DC : 0
|
BS EN 61513 - NUCLEAR POWER PLANTS - INSTRUMENTATION AND CONTROL IMPORTANT TO SAFETY - GENERAL REQUIREMENTS FOR SYSTEMS |
BS EN 61226:2010
|
Nuclear power plants. Instrumentation and control important to safety. Classification of instrumentation and control functions |
BS IEC 62855:2016
|
Nuclear power plants. Electrical power systems. Electrical power systems analysis |
I.S. EN 60709:2010
|
NUCLEAR POWER PLANTS - INSTRUMENTATION AND CONTROL SYSTEMS IMPORTANT TO SAFETY - SEPARATION |
BS 7517:1995
|
Nuclear power plants. Control rooms. Operator controls |
BS IEC 62118:2000
|
Nuclear reactor instrumentation. Pressurized water reactor (PWR) of VVER design. Monitoring adequate cooling within the core during cold shutdown |
DIN EN ISO 11064-5:2008-10
|
ERGONOMIC DESIGN OF CONTROL CENTRES - PART 5: DISPLAYS AND CONTROLS |
BS IEC 60965 : 2009
|
NUCLEAR POWER PLANTS - CONTROL ROOMS - SUPPLEMENTARY CONTROL POINTS FOR REACTOR SHUTDOWN WITHOUT ACCESS TO THE MAIN CONTROL ROOM |
CEI EN 61772 : 2013
|
NUCLEAR POWER PLANTS - CONTROL ROOMS - APPLICATION OF VISUAL DISPLAY UNITS (VDUS) |
NF EN 60709 : 2010
|
NUCLEAR POWER PLANTS - INSTRUMENTATION AND CONTROL SYSTEMS IMPORTANT TO SAFETY - SEPARATION |
IEC 62646:2016
|
Nuclear power plants - Control rooms - Computer-based procedures |
I.S. EN 61500:2011
|
NUCLEAR POWER PLANTS - INSTRUMENTATION AND CONTROL IMPORTANT TO SAFETY - DATA COMMUNICATION IN SYSTEMS PERFORMING CATEGORY A FUNCTIONS |
I.S. EN 62241:2015
|
NUCLEAR POWER PLANTS - MAIN CONTROL ROOM - ALARM FUNCTIONS AND PRESENTATION |
EN IEC 62933-1:2018
|
Electrical Energy Storage (EES) systems - Part 1: Vocabulary |
NF EN 60965 : 2016
|
NUCLEAR POWER PLANTS - CONTROL ROOMS - SUPPLEMENTARY CONTROL ROOM FOR REACTOR SHUTDOWN WITHOUT ACCESS TO THE MAIN CONTROL ROOM |
IEC TR 62247:2003
|
Nuclear power plants - Main control room design - A review of the application of IEC 60964 (1989) |
BS EN ISO 11064-1:2001
|
Ergonomic design of control centres Principles for the design of control centres |
EN 61227:2016
|
Nuclear power plants - Control rooms - Operator controls |
EN 60965:2016
|
Nuclear power plants - Control rooms - Supplementary control room for reactor shutdown without access to the main control room |
NF EN 61226 : 2010
|
NUCLEAR POWER PLANTS - INSTRUMENTATION AND CONTROL IMPORTANT TO SAFETY - CLASSIFICATION OF INSTRUMENTATION AND CONTROL FUNCTIONS |
BS IEC 61500 : 2009
|
NUCLEAR POWER PLANTS - INSTRUMENTATION AND CONTROL IMPORTANT TO SAFETY - DATA COMMUNICATION IN SYSTEMS PERFORMING CATEGORY A FUNCTIONS |
04/30042162 DC : DRAFT AUG 2004
|
|
IEC 61505:1998
|
Nuclear reactor instrumentation - Boiling water reactors (BWR) - Stability monitoring |
DIN EN ISO 11064-5 E : 2008
|
ERGONOMIC DESIGN OF CONTROL CENTRES - PART 5: DISPLAYS AND CONTROLS |
BS IEC 61513:2011
|
Nuclear power plants. Instrumentation and control important to safety. General requirements for systems |
11/30215545 DC : 0
|
BS IEC 62646 - NUCLEAR POWER PLANTS - CONTROL ROOMS - COMPUTER BASED PROCEDURES |
BS IEC 62117:1999
|
Nuclear reactor instrumentation. Pressurized light water reactors (PWR). Monitoring adequate cooling within the core during cold shutdown. |
IEC TR 62096:2009
|
Nuclear power plants - Instrumentation and control important to safety - Guidance for the decision on modernization |
UNI EN ISO 11064-5 : 2009
|
ERGONOMIC DESIGN OF CONTROL CENTRES - PART 5: DISPLAYS AND CONTROLS |
EN 61226:2010
|
Nuclear power plants - Instrumentation and control important to safety - Classification of instrumentation and control functions |
I.S. EN 61839:2014
|
NUCLEAR POWER PLANTS - DESIGN OF CONTROL ROOMS - FUNCTIONAL ANALYSIS AND ASSIGNMENT |
DIN EN ISO 11064-7 E : 2006
|
ERGONOMIC DESIGN OF CONTROL CENTRES - PART 7: PRINCIPLES FOR THE EVALUATION OF CONTROL CENTRES |
ISO 11064-5:2008
|
Ergonomic design of control centres — Part 5: Displays and controls |
VDE 0491-4 : 2001
|
NUCLEAR POWER PLANTS - PRESSURIZED LIGHT WATER REACTORS - MONITORING ADEQUATE COOLING WITHIN THE CORE DURING COLD SHUTDOWN |
BS EN 61513:2013
|
Nuclear power plants. Instrumentation and control important to safety. General requirements for systems |
15/30300369 DC : 0
|
BS IEC 62646 ED 2.0 - NUCLEAR POWER PLANTS - CONTROL ROOMS - COMPUTER BASED PROCEDURES |
IEC 62933-1:2018
|
Electrical energy storage (EES) systems - Part 1: Vocabulary |
16/30331802 DC : 0
|
BS EN 62887 ED 1.0 - NUCLEAR POWER PLANTS - INSTRUMENTATION SYSTEMS IMPORTANT TO SAFETY - PRESSURE TRANSMITTERS: CHARACTERISTICS AND TEST METHODS |
BS IEC 62646:2016
|
Nuclear power plants. Control rooms. Computer-based procedures |
17/30327241 DC : 0
|
BS EN 61500 ED.2 - NUCLEAR POWER PLANTS - INSTRUMENTATION AND CONTROL IMPORTANT TO SAFETY - DATA COMMUNICATION IN SYSTEMS PERFORMING CATEGORY A FUNCTIONS |
07/30135886 DC : 0
|
BS IEC 61227 - NUCLEAR POWER PLANTS - CONTROL ROOMS - OPERATOR CONTROLS |
BS EN 62241:2015
|
Nuclear power plants. Main control room. Alarm functions and presentation |
15/30298379 DC : 0
|
BS EN 60965 ED 3.0 - NUCLEAR POWER PLANTS - CONTROL ROOMS - SUPPLEMENTARY CONTROL ROOM FOR REACTOR SHUTDOWN WITHOUT ACCESS TO THE MAIN CONTROL ROOM |
BS EN 61772:2013
|
Nuclear power plants. Control rooms. Application of visual display units (VDUs) |
BS IEC/TR 61838:2001
|
Nuclear power plants. Use of probabilistic safety asessment for the classification of instrumentation and control functions |
BS IEC 61839 : 2000
|
NUCLEAR POWER PLANTS - DESIGN OF CONTROL ROOMS - FUNCTIONAL ANALYSIS AND ASSIGNMENT |
PD IEC/TR 61838:2009
|
Nuclear power plants. Instrumentation and control important to safety. Use of probabilistic safety assessment for the classification of functions |
CEI EN 61500 : 2012
|
NUCLEAR POWER PLANTS - INSTRUMENTATION AND CONTROL IMPORTANT TO SAFETY - DATA COMMUNICATION IN SYSTEMS PERFORMING CATEGORY A FUNCTIONS |
BS IEC 61505:1998
|
Nuclear reactor instrumentation. Boiling water reactors (BWR). Stability monitoring |
BS IEC 62241 : 2004
|
NUCLEAR POWER PLANTS - MAIN CONTROL ROOM - ALARM FUNCTIONS AND PRESENTATION |
03/305178 DC : DRAFT MAR 2003
|
|
NF EN 61772 : 2013
|
NUCLEAR POWER PLANTS - CONTROL ROOMS - APPLICATION OF VISUAL DISPLAY UNITS (VDUS) |
03/301759 DC : DRAFT JAN 2003
|
IEC 60709 ED.2 - NUCLEAR POWER PLANTS - SEPARATION OF I&C SYSTEMS IMPORTANT TO SAFETY |
03/311284 DC : DRAFT JULY 2003
|
IEC 62241 - NUCLEAR POWER PLANTS - MAIN CONTROL ROOM - ALARM FUNCTIONS AND PRESENTATION |
04/19979705 DC : DRAFT SEP 2004
|
BS EN ISO 11064-7 - ERGONOMIC DESIGN OF CONTROL CENTRES - PART 7: PRINCIPLES FOR THE EVALUATION OF CONTROL CENTRES |
IEC 62118:2000
|
Nuclear reactor instrumentation - Pressurized water reactor (PWR) of VVER design - Monitoring adequate cooling within the core during shutdown |
IEC 61343:1996
|
Nuclear reactor instrumentation - Boiling light water reactors (BWR) - Measurements in the reactor vessel for monitoring adequate cooling within the core |
CEI EN 60709 : 2011
|
NUCLEAR POWER PLANTS - INSTRUMENTATION AND CONTROL SYSTEMS IMPORTANT TO SAFETY - SEPARATION |
IEC TR 62235:2005
|
Nuclear facilities - Instrumentation and control systems important to safety - Systems of interim storage and final repository of nuclear fuel and waste |
IEC TR 61838:2009
|
Nuclear power plants - Instrumentation and control important to safety - Use of probabilistic safety assessment for the classification of functions |
I.S. EN 61772:2013
|
NUCLEAR POWER PLANTS - CONTROL ROOMS - APPLICATION OF VISUAL DISPLAY UNITS (VDUS) (IEC 61772:2009 (EQV)) |
I.S. EN 61513:2013
|
NUCLEAR POWER PLANTS - INSTRUMENTATION AND CONTROL IMPORTANT TO SAFETY - GENERAL REQUIREMENTS FOR SYSTEMS (IEC 61513:2011 (EQV)) |
CEI EN 60965 : 2012
|
NUCLEAR POWER PLANTS - CONTROL ROOMS - SUPPLEMENTARY CONTROL ROOM FOR REACTOR SHUTDOWN WITHOUT ACCESS TO THE MAIN CONTROL ROOM |
IEC 61771:1995
|
Nuclear power plants - Main control-room - Verification and validation of design |
IEC 61772:2009
|
Nuclear power plants - Control rooms - Application of visual display units (VDUs) |
IEC 61513:2011
|
Nuclear power plants - Instrumentation and control important to safety - General requirements for systems |
I.S. EN ISO 11064-3:1999
|
ERGONOMIC DESIGN OF CONTROL CENTRES - PART 3: CONTROL ROOM LAYOUT |
I.S. EN 60965:2016
|
NUCLEAR POWER PLANTS - CONTROL ROOMS - SUPPLEMENTARY CONTROL ROOM FOR REACTOR SHUTDOWN WITHOUT ACCESS TO THE MAIN CONTROL ROOM |
IEC 60965:2016
|
Nuclear power plants - Control rooms - Supplementary control room for reactor shutdown without access to the main control room |
BS EN 60965:2016
|
Nuclear power plants. Control rooms. Supplementary control room for reactor shutdown without access to the main control room |
16/30331810 DC : 0
|
BS IEC 60709 ED 3.0 - NUCLEAR POWER PLANTS - INSTRUMENTATION, CONTROL AND ELECTRICAL SYSTEMS IMPORTANT TO SAFETY - SEPARATION |
17/30356253 DC : 0
|
BS EN 62933-1 - ELECTRICAL ENERGY STORAGE (EES) SYSTEMS - PART 1: TERMINOLOGY |
BS IEC 61772:2009
|
Nuclear power plants. Control rooms. Application of visual display units (VDUs) |
PD IEC/TR 63084:2017
|
Nuclear power plants. Instrumentation and control important to safety. Platform qualification for systems important to safety |
08/30163333 DC : DRAFT SEP 2008
|
|
BS EN 61839:2014
|
Nuclear power plants. Design of control rooms. Functional analysis and assignment |
CEI EN 61513 : 2013
|
NUCLEAR POWER PLANTS - INSTRUMENTATION AND CONTROL IMPORTANT TO SAFETY - GENERAL REQUIREMENT FOR SYSTEMS |
BS IEC 61226 : 2009
|
NUCLEAR POWER PLANTS - INSTRUMENTATION AND CONTROL IMPORTANT TO SAFETY - CLASSIFICATION OF INSTRUMENTATION AND CONTROL FUNCTIONS |
07/30135889 DC : DRAFT DEC 2007
|
IEC 61772 - NUCLEAR POWER PLANTS - CONTROL ROOMS - APPLICATION OF VISUAL DISPLAY UNIT (VDU) |
BS IEC 61227 : 2008
|
NUCLEAR POWER PLANTS - CONTROL ROOMS - OPERATOR CONTROLS |
BS IEC/IEEE 62646 : 2012
|
NUCLEAR POWER PLANTS - CONTROL ROOMS - COMPUTER BASED PROCEDURES |
I.S. EN IEC 62933-1:2018
|
ELECTRICAL ENERGY STORAGE (EES) SYSTEMS - PART 1: VOCABULARY |
I.S. EN ISO 11064-5:2008
|
ERGONOMIC DESIGN OF CONTROL CENTRES - PART 5: DISPLAYS AND CONTROLS |
I.S. EN 61226:2010
|
NUCLEAR POWER PLANTS - INSTRUMENTATION AND CONTROL IMPORTANT TO SAFETY - CLASSIFICATION OF INSTRUMENTATION AND CONTROL FUNCTIONS |
BS EN 61500:2011
|
Nuclear power plants. Instrumentation and control important to safety. Data communication in systems performing category A functions |
IEC 62117:1999
|
Nuclear reactor instrumentation - Pressurized light water reactors (PWR) - Monitoring adequate cooling within the core during cold shutdown |
IEC 62855:2016
|
Nuclear power plants - Electrical power systems - Electrical power systems analysis |
IEC 61227:2008
|
Nuclear power plants - Control rooms - Operator controls |
ISO 11064-7:2006
|
Ergonomic design of control centres Part 7: Principles for the evaluation of control centres |
ISO 11064-3:1999
|
Ergonomic design of control centres — Part 3: Control room layout |
IEC 61839:2000
|
Nuclear power plants - Design of control rooms - Functional analysis and assignment |
IEC TR 63084:2017
|
Nuclear power plants - Instrumentation and control important to safety - Platform qualification for systems important to safety |
ISO 11064-1:2000
|
Ergonomic design of control centres Part 1: Principles for the design of control centres |
IEC 61226:2009
|
Nuclear power plants - Instrumentation and control important to safety - Classification of instrumentation and control functions |
BS EN ISO 11064-7:2006
|
Ergonomic design of control centres Principles for the evaluation of control centres |
DIN EN ISO 11064-7:2006-08
|
Ergonomic design of control centres - Part 7: Principles for the evaluation of control centres (ISO 11064-7:2006) |
EN 61500:2011
|
Nuclear power plants - Instrumentation and control important to safety - Data communication in systems performing category A functions |
EN ISO 11064-3:1999/AC:2002
|
ERGONOMIC DESIGN OF CONTROL CENTRES - PART 3: CONTROL ROOM LAYOUT (ISO 11064-3:1999/Cor.1:2002) |
EN ISO 11064-7:2006
|
Ergonomic design of control centres - Part 7: Principles for the evaluation of control centres (ISO 11064-7:2006) |
EN ISO 11064-1:2000
|
Ergonomic design of control centres - Part 1: Principles for the design of control centres (ISO 11064-1:2000) |
EN ISO 11064-5:2008
|
Ergonomic design of control centres - Part 5: Displays and controls (ISO 11064-5:2008) |
CEI EN 61227 : 1ED 2017
|
NUCLEAR POWER PLANTS - CONTROL ROOMS - OPERATOR CONTROLS |
BS EN 61227:2016
|
Nuclear power plants. Control rooms. Operator controls |
BS EN 60709:2010
|
Nuclear power plants. Instrumentation and control systems important to safety. Separation |
08/30166255 DC : DRAFT JUNE 2008
|
|
I.S. EN 61227:2016
|
NUCLEAR POWER PLANTS - CONTROL ROOMS - OPERATOR CONTROLS |
BS IEC 60709 : 2004
|
NUCLEAR POWER PLANTS - INSTRUMENTATION AND CONTROL SYSTEMS IMPORTANT TO SAFETY - SEPARATION |
BS EN ISO 11064-5:2008
|
Ergonomic design of control centres Displays and controls |
PD IEC/TR 62096:2009
|
Nuclear power plants. Instrumentation and control important to safety. Guidance for the decision on modernization |
NF EN 61513 : 2013
|
NUCLEAR POWER PLANTS - INSTRUMENTATION AND CONTROL IMPORTANT TO SAFETY - GENERAL REQUIREMENTS FOR SYSTEMS |
IEC 61559-2:2002
|
Radiation in nuclear facilities - Centralized systems for continuous monitoring of radiation and/or levels of radioactivity - Part 2: Requirements for discharge, environmental, accident, or post-accident monitoring functions |
IEC 62241:2004
|
Nuclear power plants - Main control room - Alarm functions and presentation |
EN 61513:2013
|
Nuclear power plants - Instrumentation and control important to safety - General requirements for systems |
EN 61772:2013
|
Nuclear power plants - Control rooms - Application of visual display units (VDUs) |
EN 62241:2015
|
Nuclear power plants - Main control room - Alarm functions and presentation |
EN 61839:2014
|
Nuclear power plants - Design of control rooms - Functional analysis and assignment |
EN 60709:2010
|
Nuclear power plants - Instrumentation and control systems important to safety - Separation |