BS EN 62439-5:2010
|
Industrial communication networks. High availability automation networks Beacon redundancy protocol (BRP) |
PD IEC/PAS 61850-9-3:2015
|
Communication networks and systems for power utility automation Precision time protocol profile for power utility automation |
17/30358185 DC : 0
|
BS EN 61850-8-1+A1 - COMMUNICATION NETWORKS AND SYSTEMS FOR POWER UTILITY AUTOMATION - PART 8-1: SPECIFIC COMMUNICATION SERVICE MAPPING (SCSM) - MAPPINGS TO MMS (ISO 9506-1 AND ISO 9506-2) AND TO ISO/IEC 8802-3 |
BS EN 62439-1 : 2010
|
INDUSTRIAL COMMUNICATION NETWORKS - HIGH AVAILABILITY AUTOMATION NETWORKS - PART 1: GENERAL CONCEPTS AND CALCULATION METHODS |
CEI EN 61850-9-2 : 2012
|
COMMUNICATION NETWORKS AND SYSTEMS FOR POWER UTILITY AUTOMATION - PART 9-2: SPECIFIC COMMUNICATION SERVICE MAPPING (SCSM) - SAMPLED VALUES OVER ISO/IEC 8802-3 |
BS EN 61850-8-1:2011
|
Communication networks and systems for power utility automation Specific communication service mapping (SCSM). Mappings to MMS (ISO 9506-1 and ISO 9506-2) and to ISO/IEC 8802-3 |
IEEE C37.241-2017
|
IEEE Guide for Application of Optical Instrument Transformers for Protective Relaying |
CEI EN 61850-8-1 : 2012
|
COMMUNICATION NETWORKS AND SYSTEMS FOR POWER UTILITY AUTOMATION - PART 8-1: SPECIFIC COMMUNICATION SERVICE MAPPING (SCSM) - MAPPINGS TO MMS (ISO 9506-1 AND ISO 9506-2) AND TO ISO/IEC 8802-3 |
I.S. EN 61850-9-2:2011
|
COMMUNICATION NETWORKS AND SYSTEMS FOR POWER UTILITY AUTOMATION - PART 9-2: SPECIFIC COMMUNICATION SERVICE MAPPING (SCSM) - SAMPLED VALUES OVER ISO/IEC 8802-3 (IEC 61850-9-2:2011 (EQV)) |
IEC 61400-25-4:2016 RLV
|
Wind energy generation systems - Part 25-4: Communications for monitoring and control of wind power plants - Mapping to communication profile |
EN 61400-25-4:2017
|
Wind energy generation systems - Part 25-4: Communications for monitoring and control of wind power plants - Mapping to communication profile |
EN 61850-10:2013
|
Communication networks and systems for power utility automation - Part 10: Conformance testing |
EN 61162-460:2015
|
Maritime navigation and radiocommunication equipment and systems - Digital interfaces - Part 460: Multiple talkers and multiple listeners - Ethernet interconnection - Safety and security |
EN 62439-6:2010
|
Industrial communication networks - High availability automation networks - Part 6: Distributed Redundancy Protocol (DRP) |
I.S. EN 62439-6:2010
|
INDUSTRIAL COMMUNICATION NETWORKS - HIGH AVAILABILITY AUTOMATION NETWORKS - PART 6: DISTRIBUTED REDUNDANCY PROTOCOL (DRP) |
15/30327752 DC : 0
|
BS EN 4660-003 - AEROSPACE SERIES - MODULAR AND OPEN AVIONICS ARCHITECTURES - PART 003: COMMUNICATIONS AND NETWORK |
09/30145360 DC : 0
|
BS EN 61850-9-2 - COMMUNICATION NETWORKS AND SYSTEMS FOR POWER UTILITY AUTOMATION - PART 9-2: SPECIFIC COMMUNICATION SERVICE MAPPING (SCSM)- SAMPLED VALUES OVER ISO/IEC 8802-3 |
BS EN 62439-6:2010
|
Industrial communication networks. High availability automation networks Distributed redundancy protocol (DRP) |
BS EN 61400-25-4:2008
|
Wind turbines Communications for monitoring and control of wind power plants. Mapping to communication profile |
CEI EN 61850-10 : 2013
|
COMMUNICATION NETWORKS AND SYSTEMS FOR POWER UTILITY AUTOMATION - PART 10: CONFORMANCE TESTING |
14/30297254 DC : 0
|
BS EN 62439-X - INDUSTRIAL COMMUNICATION NETWORKS - HIGH AVAILABILITY AUTOMATION NETWORKS |
BS EN 61850-9-2:2011
|
Communication networks and systems for power utility automation Specific communication service mapping (SCSM). Sampled values over ISO/IEC 8802-3 |
IEC TR 61850-90-5:2012
|
Communication networks and systems for power utility automation - Part 90-5: Use of IEC 61850 to transmit synchrophasor information according to IEEE C37.118 |
IEC 62439-4:2010
|
Industrial communication networks - High availability automation networks - Part 4: Cross-network Redundancy Protocol (CRP) |
I.S. EN 62439-5:2010
|
INDUSTRIAL COMMUNICATION NETWORKS - HIGH AVAILABILITY AUTOMATION NETWORKS - PART 5: BEACON REDUNDANCY PROTOCOL (BRP) |
EN 62439-1:2010/A2:2017
|
INDUSTRIAL COMMUNICATION NETWORKS - HIGH AVAILABILITY AUTOMATION NETWORKS - PART 1: GENERAL CONCEPTS AND CALCULATION METHODS (IEC 62439-1:2010/A2:2016) |
16/30346333 DC : 0
|
BS EN 61162-460 - MARITIME NAVIGATION AND RADIOCOMMUNICATION EQUIPMENT AND SYSTEMS -DIGITAL INTERFACES - PART 460: MULTIPLE TALKERS AND MULTIPLE LISTENERS - ETHERNET INTERCONNECTION - SAFETY AND SECURITY |
CEI EN 61400-25-4 : 2009
|
WIND ENERGY GENERATION SYSTEMS - PART 25-4: COMMUNICATIONS FOR MONITORING AND CONTROL OF WIND POWER PLANTS - MAPPING TO COMMUNICATION PROFILE |
BS EN 61850-10:2013
|
Communication networks and systems for power utility automation Conformance testing |
PD IEC/TR 61850-90-4:2013
|
Communication networks and systems for power utility automation Network engineering guidelines |
I.S. EN 61162-460:2015
|
MARITIME NAVIGATION AND RADIOCOMMUNICATION EQUIPMENT AND SYSTEMS - DIGITAL INTERFACES - PART 460: MULTIPLE TALKERS AND MULTIPLE LISTENERS - ETHERNET INTERCONNECTION - SAFETY AND SECURITY |
I.S. EN IEC 62439-5:2018
|
INDUSTRIAL COMMUNICATION NETWORKS - HIGH AVAILABILITY AUTOMATION NETWORKS - PART 5: BEACON REDUNDANCY PROTOCOL (BRP) |
EN IEC 62439-5:2018
|
Industrial communication networks - High availability automation networks - Part 5: Beacon Redundancy Protocol (BRP) |
IEC 62439-1:2010+AMD1:2012+AMD2:2016 CSV
|
Industrial communication networks - High availability automation networks - Part 1: General concepts and calculation methods |
EN 61850-9-2:2011
|
Communication networks and systems for power utility automation - Part 9-2: Specific communication service mapping (SCSM) - Sampled values over ISO/IEC 8802-3 |
BS EN 62439-4 : 2010
|
INDUSTRIAL COMMUNICATION NETWORKS - HIGH AVAILABILITY AUTOMATION NETWORKS - PART 4: CROSS-NETWORK REDUNDANCY PROTOCOL (CRP) |
PD IEC/TR 61850-90-12:2015
|
Communication networks and systems for power utility automation Wide area network engineering guidelines |
GR IP6 009 : 1.1.1
|
IPV6-BASED INDUSTRIAL INTERNET LEVERAGING 6TISCH TECHNOLOGY |
BS EN 61162-460:2015
|
Maritime navigation and radiocommunication equipment and systems. Digital interfaces Multiple talkers and multiple listeners. Ethernet interconnection. Safety and security |
PD IEC/TR 61850-90-5:2012
|
Communication networks and systems for power utility automation Use of IEC 61850 to transmit synchrophasor information according to IEEE C37.118 |
16/30344496 DC : 0
|
BS EN 61850-9-2+A1 - COMMUNICATION NETWORKS AND SYSTEMS FOR POWER UTILITY AUTOMATION - PART 9-2: SPECIFIC COMMUNICATION SERVICE MAPPING (SCSM) - SAMPLED VALUES OVER ISO/IEC 8802-3 |
CEI EN 62439-2 : 2011
|
INDUSTRIAL COMMUNICATION NETWORKS - HIGH AVAILABILITY AUTOMATION NETWORKS - PART 2: MEDIA REDUNDANCY PROTOCOL (MRP) |
I.S. EN 62439-1:2010
|
INDUSTRIAL COMMUNICATION NETWORKS - HIGH AVAILABILITY AUTOMATION NETWORKS - PART 1: GENERAL CONCEPTS AND CALCULATION METHODS |
I.S. EN 61850-8-1:2011
|
COMMUNICATION NETWORKS AND SYSTEMS FOR POWER UTILITY AUTOMATION - PART 8-1: SPECIFIC COMMUNICATION SERVICE MAPPING (SCSM) - MAPPINGS TO MMS (ISO 9506-1 AND ISO 9506-2) AND TO ISO/IEC 8802-3 |
IEC 62439-5:2016
|
Industrial communication networks - High availability automation networks - Part 5: Beacon Redundancy Protocol (BRP) |
IEC 61850-9-2:2011
|
Communication networks and systems for power utility automation - Part 9-2: Specific communication service mapping (SCSM) - Sampled values over ISO/IEC 8802-3 |
I.S. EN 61850-9-2:2011&A1:2020
|
Communication networks and systems for power utility automation - Part 9-2: Specific communication service mapping (SCSM) - Sampled values over ISO/IEC 8802-3 (IEC 61850-9-2:2011/A1:2020)
|
IEC 61400-25-4:2016
|
Wind energy generation systems - Part 25-4: Communications for monitoring and control of wind power plants - Mapping to communication profile |
IEC 62439-6:2010
|
Industrial communication networks - High availability automation networks - Part 6: Distributed Redundancy Protocol (DRP) |
EN 61850-8-1:2011
|
Communication networks and systems for power utility automation - Part 8-1: Specific communication service mapping (SCSM) - Mappings to MMS (ISO 9506-1 and ISO 9506-2) and to ISO/IEC 8802-3 |
I.S. EN 61400-25-4:2017
|
WIND ENERGY GENERATION SYSTEMS - PART 25-4: COMMUNICATIONS FOR MONITORING AND CONTROL OF WIND POWER PLANTS - MAPPING TO COMMUNICATION PROFILE |
IEC 61400-25-4 REDLINE : 2ED 2016
|
WIND ENERGY GENERATION SYSTEMS - PART 25-4: COMMUNICATIONS FOR MONITORING AND CONTROL OF WIND POWER PLANTS - MAPPING TO COMMUNICATION PROFILE |
CEI EN 62439-5 : 2011
|
INDUSTRIAL COMMUNICATION NETWORKS - HIGH AVAILABILITY AUTOMATION NETWORKS - PART 5: BEACON REDUNDANCY PROTOCOL (BRP) |
IEEE 2030.100-2017
|
IEEE Recommended Practice for Implementing an IEC 61850-Based Substation Communications, Protection, Monitoring, and Control System |
I.S. EN 62439-4:2010
|
INDUSTRIAL COMMUNICATION NETWORKS - HIGH AVAILABILITY AUTOMATION NETWORKS - PART 4: CROSS-NETWORK REDUNDANCY PROTOCOL (CRP) (IEC 62439-4:2010 (EQV)) |
I.S. EN 61850-10:2013
|
COMMUNICATION NETWORKS AND SYSTEMS FOR POWER UTILITY AUTOMATION - PART 10: CONFORMANCE TESTING (IEC 61850-10:2012 (EQV)) |
EN 62439-4:2010/A1:2012
|
INDUSTRIAL COMMUNICATION NETWORKS - HIGH AVAILABILITY AUTOMATION NETWORKS - PART 4: CROSS-NETWORK REDUNDANCY PROTOCOL (CRP) (IEC 62439-4:2010/A1:2012) |
IEC 61850-8-1:2011
|
Communication networks and systems for power utility automation - Part 8-1: Specific communication service mapping (SCSM) - Mappings to MMS (ISO 9506-1 and ISO 9506-2) and to ISO/IEC 8802-3 |
IEC 61850-10:2012
|
Communication networks and systems for power utility automation - Part 10: Conformance testing |