• PD CLC/TS 61400-26-2:2017

    Withdrawn A Withdrawn Standard is one, which is removed from sale, and its unique number can no longer be used. The Standard can be withdrawn and not replaced, or it can be withdrawn and replaced by a Standard with a different number.

    Wind turbines Production-based availability for wind turbines

    Available format(s):  Hardcopy, PDF

    Withdrawn date:  15-11-2019

    Language(s):  English

    Published date:  26-10-2017

    Publisher:  British Standards Institution

    Add To Cart

    Table of Contents - (Show below) - (Hide below)

    FOREWORD
    INTRODUCTION
    1 Scope
    2 Normative references
    3 Terms, definitions and abbreviations
    4 Information model
    Annex A (informative) - Possible methods for the
            determination of potential energy production
    Annex B (informative) - Production-based
            availability indicators - examples
    Annex C (informative) - Capacity factor and other
            performance indicators
    Annex D (informative) - Verification scenarios - examples
    Annex E (informative) - Considerations of competing
            assignment of lost production
    Bibliography
    Annex ZA (normative) - Normative references to
             international publications with their
             corresponding European publications

    Abstract - (Show below) - (Hide below)

    Defines a framework from which production-based performance indicators of a WTGS (wind turbine generator system) can be derived.

    Scope - (Show below) - (Hide below)

    This part of IEC 61400 provides a framework from which production-based performance indicators of a WTGS (wind turbine generator system) can be derived. It unambiguously describes how data is categorised and provides examples of how the data can be used to derive performance indicators.

    The approach of this part of IEC 61400 is to expand the time allocation model, introduced in IEC TS 61400-26-1, with two additional layers for recording of the actual energy production and potential energy production associated with the concurrent time allocation.

    It is not the intention of this Technical Specification to define how production-based availability shall be calculated. Nor is it the intention to form the basis for power curve performance measurements, which is the objective of IEC 61400-12.

    This document also includes informative annexes with:

    • examples of determination of lost production,

    • examples of algorithms for production-based indicators,

    • examples of other performance indicators,

    • examples of application scenarios.

    General Product Information - (Show below) - (Hide below)

    Committee PEL/88
    Development Note 2017 Edition incorporates corrigendum to BS PD IEC TS 61400-26-2. Renumbers and supersedes BS PD IEC TS 61400-26-2. (11/2017)
    Document Type Standard
    Publisher British Standards Institution
    Status Withdrawn
    Superseded By
    Supersedes

    Standards Referencing This Book - (Show below) - (Hide below)

    IEC 61400-12-1:2017 Wind energy generation systems - Part 12-1: Power performance measurements of electricity producing wind turbines
    IEEE 762-2006 IEEE Standard Definitions for Use in Reporting Electric Generating Unit Reliability, Availability, and Productivity
    ISO 3977-9:1999 Gas turbines Procurement Part 9: Reliability, availability, maintainability and safety
    IEC TS 61400-26-1:2011 Wind turbines - Part 26-1: Time-based availability for wind turbine generating systems
    IEC 61400-25-4:2016 Wind energy generation systems - Part 25-4: Communications for monitoring and control of wind power plants - Mapping to communication profile
    IEC 61400-25-1:2017 Wind energy generation systems - Part 25-1: Communications for monitoring and control of wind power plants - Overall description of principles and models
    IEC 61400-25-6:2016 Wind energy generation systems - Part 25-6: Communications for monitoring and control of wind power plants - Logical node classes and data classes for condition monitoring
    CLC/TS 61400-26-1:2017 Wind turbines - Part 26-1: Time-based availability for wind turbine generating systems
    IEC 61400-25-3:2015 Wind turbines - Part 25-3: Communications for monitoring and control of wind power plants - Information exchange models
    IEC 61400-25-2:2015 Wind turbines - Part 25-2: Communications for monitoring and control of wind power plants - Information models
    IEC 61400-1:2005+AMD1:2010 CSV Wind turbines - Part 1: Design requirements
    IEC 61400-25-5:2017 Wind energy generation systems - Part 25-5: Communications for monitoring and control of wind power plants - Compliance testing
    • Access your standards online with a subscription

      Features

      • Simple online access to standards, technical information and regulations
      • Critical updates of standards and customisable alerts and notifications
      • Multi - user online standards collection: secure, flexibile and cost effective