• PD IEC/TR 60909-2:2008

    Current The latest, up-to-date edition.

    Short-circuit currents in three-phase a.c. systems Data of electrical equipment for short-circuit current calculations

    Available format(s):  Hardcopy, PDF

    Language(s):  English

    Published date:  13-11-2008

    Publisher:  British Standards Institution

    Add To Cart

    Table of Contents - (Show below) - (Hide below)

    FOREWORD
    1 General
      1.1 Scope and object
      1.2 Normative references
    2 Data for electrical equipment
      2.1 General
      2.2 Data of typical synchronous machines
      2.3 Data of typical two-winding, three-winding
          and auto-transformers
      2.4 Data of typical overhead lines, single
          and double circuits
      2.5 Data of typical high-voltage, medium-voltage
          and low-voltage cables
      2.6 Data of typical asynchronous motors
      2.7 Busbars
    Annex A (informative) - Information from National
                            Committees
    Bibliography

    Abstract - (Show below) - (Hide below)

    Describes data of electrical equipment collected from different countries to be used when necessary for the calculation of short-circuit currents in accordance with IEC 60909-0.

    Scope - (Show below) - (Hide below)

    This part of IEC 60909 comprises data of electrical equipment collected from different countries to be used when necessary for the calculation of short-circuit currents in accordance with IEC 60909-0.

    Generally, electrical equipment data are given by the manufacturers on the name plate or by the electricity supplier.

    In some cases, however, the data may not be available. The data in this report may be applied for calculating short-circuit currents in low-voltage networks if they are in accordance with typical equipment employed in the user’s country. The collected data and their evaluation may be used for medium- or high-voltage planning purposes and also for comparison with data given by manufacturers or electricity suppliers. For overhead lines and cables the electrical data may in some cases also be calculated from the physical dimensions and the material following the equations given in this report.

    Thus this technical report is an addition to IEC 60909-0. It does not, however, change the basis for the standardized calculation procedure given in IEC 60909-0 and IEC 60909-3.

    General Product Information - (Show below) - (Hide below)

    Committee W/-
    Development Note Supersedes BS PD7639-2(1994). (02/2009)
    Document Type Standard
    Publisher British Standards Institution
    Status Current
    Supersedes

    Standards Referencing This Book - (Show below) - (Hide below)

    IEC 60038:2009 IEC standard voltages
    IEC 60909-3:2009 Short-circuit currents in three-phase AC systems - Part 3: Currents during two separate simultaneous line-to-earth short circuits and partial short-circuit currents flowing through earth
    IEC TR 60909-1:2002 Short-circuit currents in three-phase a.c. systems - Part 1: Factors for the calculation of short-circuit currents according to IEC 60909-0
    IEC 60909-3 : 3.0 SHORT-CIRCUIT CURRENTS IN THREE-PHASE AC SYSTEMS - PART 3: CURRENTS DURING TWO SEPARATE SIMULTANEOUS LINE-TO-EARTH SHORT CIRCUITS AND PARTIAL SHORT-CIRCUIT CURRENTS FLOWING THROUGH EARTH
    IEC 60909-0:2016 Short-circuit currents in three-phase a.c. systems - Part 0: Calculation of currents
    • Access your standards online with a subscription

      Features

      • Simple online access to standards, technical information and regulations
      • Critical updates of standards and customisable alerts and notifications
      • Multi - user online standards collection: secure, flexibile and cost effective