• PD IEC/TR 61000-3-13:2008

    Current The latest, up-to-date edition.

    Electromagnetic compatibility (EMC) Limits. Assessment of emission limits for the connection of unbalanced installations to MV, HV and EHV power systems

    Available format(s):  Hardcopy, PDF

    Language(s):  English

    Published date:  30-04-2008

    Publisher:  British Standards Institution

    Add To Cart

    Table of Contents - (Show below) - (Hide below)

    INTRODUCTION
    ACKNOWLEDGMENT
    1 Scope
    2 Normative references
    3 Terms and definitions
    4 Basic EMC concepts related to voltage unbalance
      4.1 Compatibility levels
      4.2 Planning levels
          4.2.1 Indicative values of planning levels
          4.2.2 Assessment procedure for evaluation against
                planning levels
      4.3 Illustration of EMC concepts
      4.4 Emission levels
    5 General principles
      5.1 Stage 1: simplified evaluation of disturbance emission
      5.2 Stage 2: emission limits relative to actual system
          characteristics
      5.3 Stage 3: acceptance of higher emission levels on a
          conditional basis
      5.4 Responsibilities
    6 General guidelines for the assessment of emission levels
      6.1 Point of evaluation
      6.2 Definition of unbalance emission level
      6.3 Assessment of emission levels from unbalanced installations
    7 General summation law
    8 Emission limits for unbalanced installations in MV systems
      8.1 Stage 1: simplified evaluation of disturbance emission
      8.2 Stage 2: emission limits relative to actual system
          characteristics
          8.2.1 Global emission to be shared between the sources
                of unbalance
          8.2.2 Individual emission limits
      8.3 Stage 3: acceptance of higher emission levels on a conditional
          basis
      8.4 Summary diagram of the evaluation procedure
    9 Emission limits for unbalanced installations in HV or EHV
      systems
      9.1 Stage 1: simplified evaluation of disturbance emission
      9.2 Stage 2: emission limits relative to actual system
          characteristics
          9.2.1 Assessment of the total available power
          9.2.2 Individual emission limits
      9.3 Stage 3: acceptance of higher emission levels on a
          conditional basis
    Annex A (informative) - Guidance for setting planning levels
            and emission limits
    Annex B (informative) - Calculation examples for determining
            emission limits
    Annex C (informative) - List of principal letter symbols, subscripts
            and symbols
    Bibliography

    Abstract - (Show below) - (Hide below)

    Gives guidance on principles, which can be used as the basis for determining the requirements for the connection of unbalanced installations (i.e. three-phase installations causing voltage unbalance) to MV, HV and EHV public power systems (LV installations are covered in other IEC documents).

    Scope - (Show below) - (Hide below)

    This part of IEC 61000 provides guidance on principles which can be used as the basis for determining the requirements for the connection of unbalanced installations (i.e. three-phase installations causing voltage unbalance) to MV, HV and EHV public power systems (LV installations are covered in other IEC documents). For the purposes of this report, an unbalanced installation means a three-phase installation (which may be a load or a generator) that produces voltage unbalance on the system. The connection of single-phase installations is not specifically addressed, as the connection of such installations is under the control of the system operator or owner. The general principles however may be adapted when considering the connection of single-phase installations. The primary objective is to provide guidance to system operators or owners on engineering practices, which will facilitate the provision of adequate service quality for all connected customers. In addressing installations, this document is not intended to replace equipment standards for emission limits. The report addresses the allocation of the capacity of the system to absorb disturbances. It does not address how to mitigate disturbances, nor does it address how the capacity of the system can be increased. Since the guidelines outlined in this report are necessarily based on certain simplifying assumptions, there is no guarantee that this approach will always provide the optimum solution for all unbalanced load situations. The recommended approach should be used with flexibility and judgment as far as engineering is concerned, when applying the given assessment procedures in full or in part. The system operator or owner is responsible for specifying requirements for the connection of installations which may cause unbalance on the system. The disturbing installation is to be understood as the complete customer’s installation (i.e. including balanced and unbalanced parts). Problems related to unbalance fall into two basic categories. Unbalanced installations that draw negative-sequence currents which produce negativesequence voltages on the supply system. Examples of such installations include arc furnaces and traction loads (typically connected to the public network at HV), and three phase installations where the individual loads are not balanced (typically connected at MV and LV). Negative-sequence voltage superimposed onto the terminal voltage of rotating machines can produce additional heat losses. Negative-sequence voltage can also cause non-characteristic harmonics (typically positive-sequence 3rd harmonic) to be produced by power converters. Unbalanced installations connected line-to-neutral can also draw zero-sequence currents which can be transferred or not into the supply system depending on the type of connection of the coupling transformer. The flow of zero-sequence currents in a grounded neutral system causes zero-sequence unbalance affecting line-to-neutral voltages. This is not normally controlled by setting emission limits, but rather by system design and maintenance. Ungrounded-neutral systems and phase-to-phase connected installations are not, however, affected by this kind of voltage unbalance. This report gives guidance only for the coordination of the negative-sequence type of voltage unbalance between different voltage levels in order to meet the compatibility levels at the point of utilisation. No compatibility levels are defined for zero-sequence type of voltage unbalance as this is often considered as being less relevant to the coordination of unbalance levels compared to the first type of voltage unbalance. However, for situations where a nonzero impedance exists between neutral and earth with the system still being effectively grounded (i.e., where the ratio between zero-sequence, X0 and positive sequence reactance X1 is 0 < X0/X1 ≤ 3), this type of voltage unbalance can be of concern especially when the type of connection of the coupling transformer allows zero-sequence path to flow from MV to LV and vice-versa. NOTE The boundaries between the various voltage levels may be different for different countries (see IEV 601 01-28) [9]. This report uses the following terms for system voltage: low voltage (LV) refers to Un ≤ 1 kV; medium voltage (MV) refers to 1 kV < Un ≤ 35 kV; high voltage (HV) refers to 35 kV < Un ≤ 230 kV; extra high voltage (EHV) refers to 230 kV < Un. In the context of this report, the function of the system is more important than its nominal voltage. For example, a HV system used for distribution may be given a \'planning level\' which is situated between those of MV and HV systems.

    General Product Information - (Show below) - (Hide below)

    Committee GEL/210
    Development Note Supersedes 06/30150224 DC. (04/2008)
    Document Type Standard
    Publisher British Standards Institution
    Status Current
    Supersedes

    Standards Referencing This Book - (Show below) - (Hide below)

    IEC 61000-4-30 : 3.0EN+(REDLINE+VERSION) ELECTROMAGNETIC COMPATIBILITY (EMC) - PART 4-30: TESTING AND MEASUREMENT TECHNIQUES - POWER QUALITY MEASUREMENT METHODS
    IEC GUIDE 107:2014 Electromagnetic compatibility - Guide to the drafting of electromagnetic compatibility publications
    IEC 61000-2-12:2003 Electromagnetic compatibility (EMC) - Part 2-12: Environment - Compatibility levels for low-frequency conducted disturbances and signalling in public medium-voltage power supply systems
    IEC 60050-601:1985 International Electrotechnical Vocabulary (IEV) - Part 601: Generation, transmission and distribution of electricity - General
    IEC 60050-101:1998 International Electrotechnical Vocabulary (IEV) - Part 101: Mathematics
    IEC TR 61000-3-7:2008 Electromagnetic compatibility (EMC) - Part 3-7: Limits - Assessment of emission limits for the connection of fluctuating installations to MV, HV and EHV power systems
    IEC TR 61000-2-1:1990 Electromagnetic compatibility (EMC) - Part 2: Environment - Section 1: Description of the environment - Electromagnetic environment for low-frequency conducted disturbances and signalling in public power supply systems
    IEC 61000-2-2:2002+AMD1:2017 CSV Electromagnetic compatibility (EMC) - Part 2-2: Environment - Compatibility levels for low-frequency conducted disturbances and signalling in public low-voltage power supply systems
    IEC TR 61000-3-6:2008 Electromagnetic compatibility (EMC) - Part 3-6: Limits - Assessment of emission limits for the connection of distorting installations to MV, HV and EHV power systems
    • Access your standards online with a subscription

      Features

      • Simple online access to standards, technical information and regulations
      • Critical updates of standards and customisable alerts and notifications
      • Multi - user online standards collection: secure, flexibile and cost effective