FOREWORD
INTRODUCTION
1 Scope
2 Normative references
3 Terms and definitions
4 General
5 Test levels
6 Test equipment
6.1 Burst generator
6.2 Coupling/decoupling network for a.c./d.c. mains
supply port
6.3 Capacitive coupling clamp
7 Test set-up
7.1 Test equipment
7.2 Test set-up for type tests performed in laboratories
7.3 Test set-up for post-installation tests
8 Test procedure
8.1 Laboratory reference conditions
8.2 Execution of the test
9 Evaluation of test results
10 Test report
Annex A (informative) Information on the electrical fast
transients
Annex B (informative) Selection of the test levels
Bibliography