Technical Committee on Health Care Facility Engineering
and Physical Plant
Subcommittee on Commissioning of Health Care Facilities
Preface
Guide to the Use of this Standard
Abstract
1 Scope
1.1 General
1.2 Application
1.3 Limitations
2 Definitions and Acronyms and Abbreviations
2.1 Definitions
2.2 Acronyms and Abbreviations
3 Reference Publications
4 The Commissioning Process
4.1 General
4.2 Predesign Phase
4.3 Design Phase
4.4 Construction Phase
4.5 Training Phase
4.6 Acceptance Phase
4.7 Postacceptance Phase
4.8 Training and Education
4.9 Performance Testing
4.10 Design Intent
4.11 Facility Startup
4.12 Interim Acceptance
5 Performance Tests
5.1 Prerequisites for Testing
5.2 Requirements for Testing
5.3 Deferred or Repeated Testing
5.4 Corrective Measures
5.5 Intersystem Tests
5.6 Documentation
5.7 Fine-Tuning
5.8 Final Acceptance
5.9 Test Procedures
6 Check Sheets
Appendices
A - Heating Systems
B - Air Systems
C - Cooling Systems
D - Related Systems
E - Commissioning Acceptance