Technical Committee on Health Care Facility Engineering
and Physical Plant
Subcommittee on Commissioning of Health Care Facilities
Preface
Guide to the Use of this Standard
Abstract
1 Scope
2 Definitions and Acronyms and Abbreviations
2.1 Definitions
2.2 Acronyms and Abbreviations
3 Reference and Related Publications
3.1 Reference Publications
3.2 Related Publications
4 Commissioning of Electrical Systems
4.1 General
4.2 Codes
4.3 Design Specifications and Criteria
4.4 Verification
4.5 Manuals
4.6 Familiarization
4.7 The Electrical Commissioning Process
4.8 Training and Education
4.9 Design Intent
4.10 Facility Startup
4.11 Verification Process
4.12 Performance Testing
4.13 Interim Acceptance
4.14 Seasonal Variations/Influences
5 Commissioning Tests
5.1 General
5.2 High-Voltage Substations (in Excess of 750 V)
5.3 High-Voltage Cables (in Excess of 750 V)
5.4 High-Voltage Switchgear (in Excess of 750 V)
5.5 Power Transformers (in Excess of 750 V)
5.6 High-Voltage Fuses (in Excess of 750 V)
5.7 Switchgear (750 V or Less)
5.8 Protective System Study
5.9 Meters, Relays, and Instrument Transformers
5.10 Rotating Machinery
5.11 Power and Lighting Panelboards
5.12 Essential Power
5.13 Wiring Devices and Lighting
5.14 Lightning Protection System
5.15 Branch Circuit Wiring in Patient Care Areas
5.16 UPS and Central Battery Systems
5.17 Commissioning Acceptance
Appendices
A - High-Voltage Substations (in Excess of 750 V)
B - High-Voltage Cables (in Excess of 750 V)
C - High-Voltage Switchgear (in Excess of 750 V)
D - Power Transformers (in Excess of 750 V)
E - High-Voltage Fuses (in Excess of 750 V)
F - Switchgear (750 V or Less)
G - Protective System Study
H - Meters, Relays, and Instrument Transformers
J - Rotating Machinery
K - Power and Lighting Panelboards
L - Essential Power
M - Wiring Devices and Lightning
N - Lightning Protection System
P - Branch Circuit Wiring in Patient Care Areas
Q - UPS and Central Battery Systems
R - Commissioning Acceptance