BS EN 10253-2:2007
|
Butt-welding pipe fittings Non alloy and ferritic alloy steels with specific inspection requirements |
09/30186448 DC : 0
|
BS EN 13941 - DESIGN AND INSTALLATION OF REINSULATED BONDED PIPE SYSTEMS FOR DISTRICT HEATING |
03/302503 DC : DRAFT FEB 2003
|
BS EN 14276-2 - PRESSURE EQUIPMENT FOR REFRIGERATING SYSTEMS AND HEAT PUMPS - PART 2: PIPING - GENERAL REQUIREMENTS |
03/306044 DC : DRAFT APR 2003
|
BS EN 14656 - SAFETY OF MACHINERY - SAFETY REQUIREMENTS FOR EXTRUSION PRESSES FOR STEEL AND NON-FERROUS METALS |
CEN/TR 16787:2014
|
Industrial Gas Installation - Guideline |
CSA Z10535.1 : 2015
|
HOISTS FOR THE TRANSFER OF DISABLED PERSONS - REQUIREMENTS AND TEST METHODS |
11/30246678 DC : 0
|
BS EN 13480-4 - METALLIC INDUSTRIAL PIPING - PART 4: FABRICATION AND INSTALLATION |
I.S. EN 1515-4:2009
|
FLANGES AND THEIR JOINTS - BOLTING - PART 4: SELECTION OF BOLTING FOR EQUIPMENT SUBJECT TO THE PRESSURE EQUIPMENT DIRECTIVE 97/23/EC |
I.S. EN ISO 4126-3:2006
|
SAFETY DEVICES FOR PROTECTION AGAINST EXCESSIVE PRESSURE - PART 3: SAFETY VALVES AND BURSTING DISC SAFETY DEVICES IN COMBINATION |
PREN 14276-2 : DRAFT 2017
|
PRESSURE EQUIPMENT FOR REFRIGERATING SYSTEMS AND HEAT PUMPS - PART 2: PIPING - GENERAL REQUIREMENTS |
I.S. EN 378-2:2016
|
REFRIGERATING SYSTEMS AND HEAT PUMPS - SAFETY AND ENVIRONMENTAL REQUIREMENTS - PART 2: DESIGN, CONSTRUCTION, TESTING, MARKING AND DOCUMENTATION |
BS EN 14917 : 2009
|
METAL BELLOWS EXPANSION JOINTS FOR PRESSURE APPLICATIONS |
S.R. CEN/TR 16787:2014
|
INDUSTRIAL GAS INSTALLATION - GUIDELINE |
EN 14917:2009+A1:2012
|
Metal bellows expansion joints for pressure applications |
UNE-EN 13480-6:2017
|
Metallic industrial piping - Part 6: Additional requirements for buried piping |
EN 14071:2015
|
LPG equipment and accessories - Pressure relief valves for LPG pressure vessels - Ancillary equipment |
I.S. EN 15711:2009
|
VITREOUS AND PORCELAIN ENAMELS - GLASS LINED FLANGED STEEL PIPES AND FLANGED STEEL FITTINGS - QUALITY REQUIREMENTS |
PD CEN/TR 14585-3:2017
|
Corrugated metal hose assemblies for pressure applications Design method |
I.S. EN 13480-1:2017
|
METALLIC INDUSTRIAL PIPING - PART 1: GENERAL |
BS EN 13480-1:2017
|
Metallic industrial piping General |
I.S. EN 13480-2:2017
|
METALLIC INDUSTRIAL PIPING - PART 2: MATERIALS |
BS EN 13480-8:2017+A1:2019
|
Metallic industrial piping Additional requirements for aluminium and aluminium alloy piping |
BS EN 13480-5:2017
|
Metallic industrial piping Inspection and testing |
NFPA 750 : 2015
|
WATER MIST FIRE PROTECTION SYSTEMS |
BS EN 13480-8:2017
|
Metallic industrial piping Additional requirements for aluminium and aluminium alloy piping |
BS EN 13480-2:2017
|
Metallic industrial piping Materials |
DIN EN 12952-9:2003-04
|
Water-tube boilers and auxiliary installations - Part 9: Requirements for firing systems for pulverized solid fuels for the boiler |
DIN EN 1591-1:2014-04
|
FLANGES AND THEIR JOINTS - DESIGN RULES FOR GASKETED CIRCULAR FLANGE CONNECTIONS - PART 1: CALCULATION |
UNE-EN 378-2:2017
|
Refrigerating systems and heat pumps - Safety and environmental requirements - Part 2: Design, construction, testing, marking and documentation |
11/30235014 DC : 0
|
BS EN 13135 - CRANES - SAFETY - DESIGN - REQUIREMENTS FOR EQUIPMENT |
I.S. EN ISO 10535:2006
|
HOISTS FOR THE TRANSFER OF DISABLED PERSONS - REQUIREMENTS AND TEST METHODS |
EN 10253-4:2008/AC:2009
|
BUTT-WELDING PIPE FITTINGS - PART 4: WROUGHT AUSTENITIC AND AUSTENITIC-FERRITIC (DUPLEX) STAINLESS STEELS WITH SPECIFIC INSPECTION REQUIREMENTS |
EN 12952-14:2004
|
Water-tube boilers and auxiliary installations - Part 14: Requirements for flue gas DENOX-systems using liquified pressurized ammonia and ammonia water solution |
DIN EN 12952-14:2004-09
|
Water-tube boilers and auxiliary installations - Part 14: Requirements for fluegas DENOX systems using liquified pressurized ammonia and ammonia water solution |
EN 12952-3:2011
|
Water-tube boilers and auxiliary installations - Part 3: Design and calculation for pressure parts of the boiler |
DIN EN 15711:2009-08
|
VITREOUS AND PORCELAIN ENAMELS - GLASS LINED FLANGED STEEL PIPES AND FLANGED STEEL FITTINGS - QUALITY REQUIREMENTS |
EN 13480-4:2017
|
Metallic industrial piping - Part 4: Fabrication and installation |
EN 12952-9:2002
|
Water-tube boilers and auxiliary installations - Part 9: Requirements for firing systems for pulverized solid fuels for the boiler |
DIN EN 15949:2012-05
|
Safety of machinery - Safety requirements for bar mills, structural steel mills and wire rod mills |
DIN EN 14917:2012-06
|
Metal bellows expansion joints for pressure applications (includes Amendment A1:2012) |
EN 13135:2013+A1:2018
|
Cranes - Safety - Design - Requirements for equipment |
DIN EN 10253-2:2008-09
|
Butt-welding pipe fittings - Part 2: Non alloy and ferritic alloy steels with specific inspection requirements |
BS EN ISO 4126-3:2006
|
Safety devices for protection against excessive pressure Safety valves and bursting disc safety devices in combination |
DIN EN 15001-1:2011-02
|
Gas infrastructure - Gas installation pipework with an operating pressure greater than 0,5 bar for industrial installations and greater than 5 bar for industrial and non-industrial installations - Part 1: Detailed functional requirements for design, materials, construction, inspection and testing |
BS EN 13135 : 2013
|
CRANES - SAFETY - DESIGN - REQUIREMENTS FOR EQUIPMENT |
BS EN 15711:2009
|
Vitreous and porcelain enamels. Glass lined flanged steel pipes and flanged steel fittings. Quality requirements |
DIN EN ISO 28721-4:2016-03
|
VITREOUS AND PORCELAIN ENAMELS - GLASSLINED APPARATUS FOR PROCESS PLANTS - PART 4: QUALITY REQUIREMENTS FOR GLASSLINED FLANGED STEEL PIPES AND FLANGED STEEL FITTINGS (ISO 28721-4:2015) |
03/306593 DC : DRAFT APR 2003
|
BS EN 14673 - SAFETY OF MACHINERY - SAFETY REQUIREMENTS FOR HYDRAULICALLY POWERED HOT FORGING PRESSES FOR THE FORGING OF STEEL AND NON-FERROUS METALS |
BS ISO 28721-4 : 2010
|
VITREOUS AND PORCELAIN ENAMELS - GLASS-LINED APPARATUS FOR PROCESS PLANTS - PART 4: QUALITY REQUIREMENTS FOR GLASS-LINED FLANGED STEEL PIPES AND FLANGED STEEL FITTINGS |
UNI EN 1515-4 : 2010
|
FLANGES AND THEIR JOINTS - BOLTING - PART 4: SELECTION OF BOLTING FOR EQUIPMENT SUBJECT TO THE PRESSURE EQUIPMENT DIRECTIVE 97/23/EC |
PREN 13480-4 : DRAFT 2011
|
METALLIC INDUSTRIAL PIPING - PART 4: FABRICATION AND INSTALLATION |
10/30227671 DC : 0
|
BS EN 14678-1 - LPG EQUIPMENT AND ACCESSORIES - CONSTRUCTION AND PERFORMANCE OF LPG EQUIPMENT FOR AUTOMOTIVE FILLING STATIONS - PART 1: DISPENSERS |
UNE-EN 13480-8:2017
|
Metallic industrial piping - Part 8: Additional requirements for aluminium and aluminium alloy piping (Endorsed by Asociación Española de Normalización in September of 2019.) |
NF EN 1515-4 : 2010
|
FLANGES AND THEIR JOINTS - BOLTING - PART 4: SELECTION OF BOLTING FOR EQUIPMENT SUBJECT TO THE PRESSURE EQUIPMENT DIRECTIVE 97/23/EC |
BS EN 15061 : 2007
|
SAFETY OF MACHINERY - SAFETY REQUIREMENTS FOR STRIP PROCESSING LINE MACHINERY AND EQUIPMENT |
I.S. EN 14071:2015
|
LPG EQUIPMENT AND ACCESSORIES - PRESSURE RELIEF VALVES FOR LPG PRESSURE VESSELS - ANCILLARY EQUIPMENT |
PREN 17206 : DRAFT 2018
|
ENTERTAINMENT TECHNOLOGY - LIFTING AND LOAD-BEARING EQUIPMENT FOR STAGES AND OTHER PRODUCTION AREAS WITHIN THE ENTERTAINMENT INDUSTRY - SPECIFICATIONS FOR GENERAL REQUIREMENTS (EXCLUDING ALUMINUM AND STEEL TRUSSES AND TOWERS) |
I.S. EN 13480-6:2017
|
METALLIC INDUSTRIAL PIPING - PART 6: ADDITIONAL REQUIREMENTS FOR BURIED PIPING |
EN 10253-2:2007
|
Butt-welding pipe fittings - Part 2: Non alloy and ferritic alloy steels with specific inspection requirements |
I.S. EN 13135:2013
|
CRANES - SAFETY - DESIGN - REQUIREMENTS FOR EQUIPMENT |
UNI EN 15949 : 2012
|
SAFETY OF MACHINERY - SAFETY REQUIREMENTS FOR BAR MILLS, STRUCTURAL STEEL MILLS AND WIRE ROD MILLS |
UNE-EN 14071:2015
|
LPG equipment and accessories - Pressure relief valves for LPG pressure vessels - Ancillary equipment |
I.S. EN 13480-5:2017
|
METALLIC INDUSTRIAL PIPING - PART 5: INSPECTION AND TESTING |
BS EN ISO 28721-4:2015
|
Vitreous and porcelain enamels. Glass-lined apparatus for process plants Quality requirements for glass-lined flanged steel pipes and flanged steel fittings |
UNE-EN 13480-5:2017
|
Metallic industrial piping - Part 5: Inspection and testing |
BS EN 14071:2015
|
LPG equipment and accessories. Pressure relief valves for LPG pressure vessels. Ancillary equipment |
EN 13480-5:2017
|
Metallic industrial piping - Part 5: Inspection and testing |
I.S. EN 10253-2:2007
|
BUTT-WELDING PIPE FITTINGS - PART 2: NON ALLOY AND FERRITIC ALLOY STEELS WITH SPECIFIC INSPECTION REQUIREMENTS |
S.R. CWA 15902-1:2009
|
LIFTING AND LOAD-BEARING EQUIPMENT FOR STAGES AND OTHER PRODUCTION AREAS WITHIN THE ENTERTAINMENT INDUSTRY - PART 1: GENERAL REQUIREMENTS (EXCLUDING ALUMINIUM AND STEEL TRUSSES AND TOWERS) |
DIN EN 14656:2010-10
|
Safety of machinery - Safety requirements for extrusion presses for steel and non-ferrous metals (includes Amendment A1:2010) |
BS EN ISO 10535:2006
|
Hoists for the transfer of disabled persons. Requirements and test methods |
BS EN 1591-1:2013
|
Flanges and their joints. Design rules for gasketed circular flange connections Calculation |
BS EN 746-2:2010
|
Industrial thermoprocessing equipment Safety requirements for combustion and fuel handling systems |
BS EN 14673 : 2006
|
SAFETY OF MACHINERY - SAFETY REQUIREMENTS FOR HYDRAULICALLY POWERED OPEN DIE HOT FORGING PRESSES FOR THE FORGING OF STEEL AND NON-FERROUS METALS |
EN ISO 4126-3:2006
|
Safety devices for protection against excessive pressure - Part 3: Safety valves and bursting disc safety devices in combination (ISO 4126-3:2006) |
I.S. EN 14678-1:2013
|
LPG EQUIPMENT AND ACCESSORIES - CONSTRUCTION AND PERFORMANCE OF LPG EQUIPMENT FOR AUTOMOTIVE FILLING STATIONS - PART 1: DISPENSERS |
I.S. EN 14656:2006
|
SAFETY OF MACHINERY - SAFETY REQUIREMENTS FOR EXTRUSION PRESSES FOR STEEL AND NON-FERROUS METALS |
I.S. EN 746-2:2010
|
INDUSTRIAL THERMOPROCESSING EQUIPMENT - PART 2: SAFETY REQUIREMENTS FOR COMBUSTION AND FUEL HANDLING SYSTEMS |
I.S. EN 13480-4:2017
|
METALLIC INDUSTRIAL PIPING - PART 4: FABRICATION AND INSTALLATION |
DIN EN ISO 4126-3:2006-06
|
Safety devices for protection against exessive pressure - Part 3: Safety valves and bursting disc safety devices in combination (ISO 4126-3:2006) |
I.S. EN 14125:2013
|
THERMOPLASTIC AND FLEXIBLE METAL PIPEWORK FOR UNDERGROUND INSTALLATION AT PETROL FILLING STATIONS |
I.S. EN 13480-8:2017&LC:2019
|
METALLIC INDUSTRIAL PIPING - PART 8: ADDITIONAL REQUIREMENTS FOR ALUMINIUM AND ALUMINIUM ALLOY PIPING |
I.S. EN 12952-3:2011
|
WATER-TUBE BOILERS AND AUXILIARY INSTALLATIONS - PART 3: DESIGN AND CALCULATION FOR PRESSURE PARTS OF THE BOILER |
I.S. EN 13941:2009
|
DESIGN AND INSTALLATION OF PREINSULATED BONDED PIPE SYSTEMS FOR DISTRICT HEATING |
I.S. EN 14673:2006
|
SAFETY OF MACHINERY - SAFETY REQUIREMENTS FOR HYDRAULICALLY POWERED OPEN DIE HOT FORGING PRESSES FOR THE FORGING OF STEEL AND NON-FERROUS METALS |
I.S. EN 1591-1:2013
|
FLANGES AND THEIR JOINTS - DESIGN RULES FOR GASKETED CIRCULAR FLANGE CONNECTIONS - PART 1: CALCULATION |
NF EN 14276-2 : 2007 + A1 2011
|
PRESSURE EQUIPMENT FOR REFRIGERATING SYSTEMS AND HEAT PUMPS - PART 2: PIPING - GENERAL REQUIREMENTS |
NF EN 12952-3 : 2012
|
WATER-TUBE BOILERS AND AUXILIARY INSTALLATIONS - PART 3: DESIGN AND CALCULATION FOR PRESSURE PARTS OF THE BOILER |
I.S. EN 12952-9:2002
|
WATER-TUBE BOILERS AND AUXILIARY INSTALLATIONS - PART 9: REQUIREMENTS FOR FIRING SYSTEMS FOR PULVERIZED SOLID FUELS FOR THE BOILER |
VDI 2290:2012-06
|
Emission control - Sealing constants for flange connections |
PREN 13480-5 : DRAFT 2011
|
METALLIC INDUSTRIAL PIPING - PART 5: INSPECTION AND TESTING |
09/30197538 DC : 0
|
BS ISO 12778 - VITREOUS AND PORCELAIN ENAMELS - GLASS LINED FLANGED STEEL PIPES AND FLANGED STEEL FITTINGS - QUALITY REQUIREMENTS |
12/30260023 DC : 0
|
BS EN 13480-8 - METALLIC INDUSTRIAL PIPING - PART 8: ADDITIONAL REQUIREMENTS FOR ALUMINIUM AND ALUMINIUM ALLOYS |
09/30202316 DC : 0
|
BS EN 12514-4 - PARTS FOR SUPPLY SYSTEMS FOR CONSUMING UNITS WITH LIQUID FUELS - PART 4: SAFETY REQUIREMENTS AND TESTS - PIPINGS AND PARTS WITHIN PIPELINES |
DIN EN ISO 28721-4 E : 2016
|
VITREOUS AND PORCELAIN ENAMELS - GLASSLINED APPARATUS FOR PROCESS PLANTS - PART 4: QUALITY REQUIREMENTS FOR GLASSLINED FLANGED STEEL PIPES AND FLANGED STEEL FITTINGS (ISO 28721-4:2015) |
09/30175681 DC : 0
|
BS EN 14656:2006/A1 - SAFETY OF MACHINERY - SAFETY REQUIREMENTS FOR EXTRUSION PRESSES FOR STEEL AND NON-FERROUS METALS |
DIN EN 15061:2009-05
|
Safety of machinery - Safety requirements for strip processing line machinery and equipment (includes Amendment A1:2008) |
DIN EN 10253-4:2008-06
|
BUTT-WELDING PIPE FITTINGS - PART 4: WROUGHT AUSTENITIC AND AUSTENITIC-FERRITIC (DUPLEX) STAINLESS STEELS WITH SPECIFIC INSPECTION REQUIREMENTS |
13/30291774 DC : 0
|
BS EN 378-2 - REFRIGERATING SYSTEMS AND HEAT PUMPS - SAFETY AND ENVIRONMENTAL REQUIREMENTS - PART 2: DESIGN, CONSTRUCTION, TESTING, MARKING AND DOCUMENTATION |
I.S. EN 15949:2012
|
SAFETY OF MACHINERY - SAFETY REQUIREMENTS FOR BAR MILLS, STRUCTURAL STEEL MILLS AND WIRE ROD MILLS |
NF EN 15001-1 : 2009
|
GAS INFRASTRUCTURE - GAS INSTALLATION PIPEWORK WITH AN OPERATING PRESSURE GREATER THAN 0,5 BAR FOR INDUSTRIAL INSTALLATIONS AND GREATER THAN 5 BAR FOR INDUSTRIAL AND NON-INDUSTRIAL INSTALLATIONS - PART 1: DETAILED FUNCTIONAL REQUIREMENTS FOR DESIGN, MATERIALS, CONSTRUCTION, INSPECTION AND TESTING |
PD CEN/TR 16787:2014
|
Industrial Gas Installation. Guideline |
04/30118252 DC : DRAFT AUG 2004
|
EN 14917 - METAL BELLOWS EXPANSION JOINTS FOR PRESSURE APPLICATIONS |
PREN 13941 : DRAFT 2009
|
DESIGN AND INSTALLATION OF REINSULATED BONDED PIPE SYSTEMS FOR DISTRICT HEATING |
05/30114218 DC : DRAFT FEB 2005
|
EN 13480-8 - METALLIC INDUSTRIAL PIPING - PART 8: ADDITIONAL REQUIREMENTS FOR ALUMINIUM AND ALUMINIUM ALLOY PIPING |
DIN EN 14917 E : 2012
|
METAL BELLOWS EXPANSION JOINTS FOR PRESSURE APPLICATIONS |
UNI EN 10253-4 : 2009
|
BUTT-WELDING PIPE FITTINGS - PART 4: WROUGHT AUSTENITIC AND AUSTENITIC-FERRITIC (DUPLEX) STAINLESS STEELS WITH SPECIFIC INSPECTION REQUIREMENTS |
EN 13480-6:2017
|
Metallic industrial piping - Part 6: Additional requirements for buried piping |
PREN 13480-8 : DRAFT 2012
|
METALLIC INDUSTRIAL PIPING - PART 8: ADDITIONAL REQUIREMENTS FOR ALUMINIUM AND ALUMINIUM ALLOYS |
EN 13480-1:2017
|
Metallic industrial piping - Part 1: General |
UNE-EN 13135:2013
|
Cranes - Safety - Design - Requirements for equipment |
I.S. EN 1092-1:2007
|
FLANGES AND THEIR JOINTS - CIRCULAR FLANGES FOR PIPES, VALVES,FITTINGS AND ACCESSORIES, PN DESIGNATED - PART 1: STEEL FLANGES |
I.S. EN 14917:2009
|
METAL BELLOWS EXPANSION JOINTS FOR PRESSURE APPLICATIONS |
DIN EN 746-2:2011-02
|
Industrial thermoprocessing equipment - Part 2: Safety requirements for combustion and fuel handling systems |
UNE-EN 15711:2010
|
Vitreous and porcelain enamels - Glass lined flanged steel pipes and flanged steel fittings - Quality requirements |
DIN EN 14276-2:2011-05
|
PRESSURE EQUIPMENT FOR REFRIGERATING SYSTEMS AND HEAT PUMPS - PART 2: PIPING - GENERAL REQUIREMENTS |
DIN EN 14673:2010-10
|
Safety of machinery - Safety requirements for hydraulically powered open die hot forging presses for the forging of steel and non-ferrous metals (includes Amendment A1:2010) |
ISO 4126-3:2006
|
Safety devices for protection against excessive pressure Part 3: Safety valves and bursting disc safety devices in combination |
UNE-EN 14678-1:2013
|
LPG equipment and accessories - Construction and performance of LPG equipment for automotive filling stations - Part 1: Dispensers |
18/30359998 DC : 0
|
BS ISO 19880-1 - GASEOUS HYDROGEN - FUELLING STATIONS - PART 1: GENERAL REQUIREMENTS |
UNI EN 14276-2 : 2011
|
PRESSURE EQUIPMENT FOR REFRIGERATING SYSTEMS AND HEAT PUMPS - PART 2: PIPING - GENERAL REQUIREMENTS |
EN 14678-1:2013
|
LPG equipment and accessories - Construction and performance of LPG equipment for automotive filling stations - Part 1: Dispensers |
UNI EN 1591-1 : 2014
|
FLANGES AND THEIR JOINTS - DESIGN RULES FOR GASKETED CIRCULAR FLANGE CONNECTIONS - PART 1: CALCULATION |
UNI EN 13941 : 2011
|
DESIGN AND INSTALLATION OF PREINSULATED BONDED PIPE SYSTEMS FOR DISTRICT HEATING |
UNI EN 14673 : 2010
|
SAFETY OF MACHINERY - SAFETY REQUIREMENTS FOR HYDRAULICALLY POWERED OPEN DIE HOT FORGING PRESSES FOR THE FORGING OF STEEL AND NON-FERROUS METALS |
UNI EN 15061 : 2009
|
SAFETY OF MACHINERY - SAFETY REQUIREMENTS FOR STRIP PROCESSING LINE MACHINERY AND EQUIPMENT |
UNI EN 15711 : 2009
|
VITREOUS AND PORCELAIN ENAMELS - GLASS LINED FLANGED STEEL PIPES AND FLANGED STEEL FITTINGS - QUALITY REQUIREMENTS |
UNI EN 12952-3 : 2012
|
WATER-TUBE BOILERS AND AUXILIARY INSTALLATIONS - PART 3: DESIGN AND CALCULATION FOR PRESSURE PARTS OF THE BOILER |
UNI EN 14656 : 2010
|
SAFETY OF MACHINERY - SAFETY REQUIREMENTS FOR EXTRUSION PRESSES FOR STEEL AND NON-FERROUS METALS |
UNI EN 15001-1 : 2009
|
GAS INFRASTRUCTURE - GAS INSTALLATION PIPEWORK WITH AN OPERATING PRESSURE GREATER THAN 0,5 BAR FOR INDUSTRIAL INSTALLATIONS AND GREATER THAN 5 BAR FOR INDUSTRIAL AND NON-INDUSTRIAL INSTALLATIONS - PART 1: DETAILED FUNCTIONAL REQUIREMENTS FOR DESIGN, MATERIALS, CONSTRUCTION, INSPECTION AND TESTING |
UNI EN 14125 : 2013
|
THERMOPLASTIC AND FLEXIBLE METAL PIPEWORK FOR UNDERGROUND INSTALLATION AT PETROL FILLING STATIONS |
ONORM EN 15061 : 2009
|
SAFETY OF MACHINERY - SAFETY REQUIREMENTS FOR STRIP PROCESSING LINE MACHINERY AND EQUIPMENT |
UNI EN 746-2 : 2011
|
INDUSTRIAL THERMOPROCESSING EQUIPMENT - PART 2: SAFETY REQUIREMENTS FOR COMBUSTION AND FUEL HANDLING SYSTEMS |
UNI EN 14678-1 : 2013
|
LPG EQUIPMENT AND ACCESSORIES - CONSTRUCTION AND PERFORMANCE OF LPG EQUIPMENT FOR AUTOMOTIVE FILLING STATIONS - PART 1: DISPENSERS |
BS EN 15949:2012
|
Safety of machinery. Safety requirements for bar mills, structural steel mills and wire rod mills |
PREN 14678-1 : DRAFT 2010
|
LPG EQUIPMENT AND ACCESSORIES - CONSTRUCTION AND PERFORMANCE OF LPG EQUIPMENT FOR AUTOMOTIVE FILLING STATIONS - PART 1: DISPENSERS |
03/108196 DC : 0
|
EN 10253-4 - BUTT WELDING PIPE FITTINGS - PART 4: WROUGHT AUSTENITIC & AUSTENITIC-FERRITIC (DUPLEX) STAINLESS STEELS WITH SPECIFIC INSPECTION REQUIREMENTS |
18/30366946 DC : 0
|
BS EN 17206 - ENTERTAINMENT TECHNOLOGY - LIFTING AND LOAD-BEARING EQUIPMENT FOR STAGES AND OTHER PRODUCTION AREAS WITHIN THE ENTERTAINMENT INDUSTRY - SPECIFICATIONS FOR GENERAL REQUIREMENTS (EXCLUDING ALUMINUM AND STEEL TRUSSES AND TOWERS) |
16/30336440 DC : DRAFT MAR 2016
|
BS EN 1092-1 - FLANGES AND THEIR JOINTS - CIRCULAR FLANGES FOR PIPES, VALVES, FITTINGS AND ACCESSORIES, PN DESIGNATED - PART 1: STEEL FLANGES |
PREN 14125 : DRAFT 2011
|
THERMOPLASTIC AND FLEXIBLE METAL PIPEWORK FOR UNDERGROUND INSTALLATION AT PETROL FILLING STATIONS |
11/30231856 DC : 0
|
BS EN 14125 - THERMOPLASTIC AND FLEXIBLE METAL PIPEWORK FOR UNDERGROUND INSTALLATION AT PETROL FILLING STATIONS |
04/30123607 DC : DRAFT OCT 2004
|
EN 15061:2004 - SAFETY OF MACHINERY - SAFETY REQUIREMENTS FOR STRIP PROCESSING LINE MACHINERY AND EQUIPMENT |
12/30266928 DC : 0
|
BS EN 14071 - LPG EQUIPMENT AND ACCESSORIES - PRESSURE RELIEF VALVES FOR LPG PRESSURE VESSELS - ANCILLARY EQUIPMENT |
16/30342037 DC : 0
|
BS EN 13941-1 - DISTRICT HEATING PIPES - DESIGN AND INSTALLATION OF THERMAL INSULATED BONDED SINGLE AND TWIN PIPE SYSTEMS FOR DIRECTLY BURIED HOT WATER NETWORKS - PART 1: DESIGN |
BS EN 1515-4:2009
|
Flanges and their joints. Bolting Selection of bolting for equipment subject to the Pressure Equipment Directive 97/23/EC |
PREN 10253-4 : DRAFT 2017
|
BUTT-WELDING PIPE FITTINGS - PART 4: WROUGHT AUSTENITIC & AUSTENITIC-FERRITIC (DUPLEX) STAINLESS STEELS WITH SPECIFIC INSPECTION REQUIREMENTS |
UNI EN 14917 : 2012
|
METAL BELLOWS EXPANSION JOINTS FOR PRESSURE APPLICATIONS |
08/30173031 DC : DRAFT JAN 2008
|
BS EN 1515-4 - FLANGES AND THEIR JOINTS - BOLTING - PART 4: SELECTION OF BOLTING FOR EQUIPMENT SUBJECT TO THE PRESSURE EQUIPMENT DIRECTIVE 97/23/EC |
BS EN 10253-4:2008
|
Butt-welding pipe fittings Wrought austenitic and austenitic-ferritic (duplex) stainless steels with specific inspection requirements |
PREN 378-2 : DRAFT 2013
|
REFRIGERATING SYSTEMS AND HEAT PUMPS - SAFETY AND ENVIRONMENTAL REQUIREMENTS - PART 2: DESIGN, CONSTRUCTION, TESTING, MARKING AND DOCUMENTATION |
DIN EN 15061 E : 2009
|
SAFETY OF MACHINERY - SAFETY REQUIREMENTS FOR STRIP PROCESSING LINE MACHINERY AND EQUIPMENT |
DIN EN 1515-4 E : 2010
|
FLANGES AND THEIR JOINTS - BOLTING - PART 4: SELECTION OF BOLTING FOR EQUIPMENT SUBJECT TO THE PRESSURE EQUIPMENT DIRECTIVE 97/23/EC |
BS EN 13480-6:2017
|
Metallic industrial piping Additional requirements for buried piping |
I.S. EN 15061:2007
|
SAFETY OF MACHINERY - SAFETY REQUIREMENTS FOR STRIP PROCESSING LINE MACHINERY AND EQUIPMENT |
S.R. CEN/TR 14585-3:2017
|
CORRUGATED METAL HOSE ASSEMBLIES FOR PRESSURE APPLICATIONS - PART 3: DESIGN METHOD |
EN 1092-1:2018
|
Flanges and their joints - Circular flanges for pipes, valves, fittings and accessories, PN designated - Part 1: Steel flanges |
EN 378-2:2016
|
Refrigerating systems and heat pumps - Safety and environmental requirements - Part 2: Design, construction, testing, marking and documentation |
DIN EN 14071:2015-08
|
LPG EQUIPMENT AND ACCESSORIES - PRESSURE RELIEF VALVES FOR LPG PRESSURE VESSELS - ANCILLARY EQUIPMENT |
17/30351221 DC : 0
|
BS EN 14276-2 - PRESSURE EQUIPMENT FOR REFRIGERATING SYSTEMS AND HEAT PUMPS - PART 2: PIPING - GENERAL REQUIREMENTS |
DIN EN 13135:2013-05
|
CRANES - SAFETY - DESIGN - REQUIREMENTS FOR EQUIPMENT |
BS EN 13480-2:2017+A3:2018
|
Metallic industrial piping Materials |
DIN EN 12952-14 E : 2004
|
WATER-TUBE BOILERS AND AUXILIARY INSTALLATIONS - PART 14: REQUIREMENTS FOR FLUE GAS DENOX-SYSTEMS USING LIQUEFIED PRESSURIZED AMMONIA AND AMMONIA WATER SOLUTION |
DIN EN 14673 E : 2010
|
SAFETY OF MACHINERY - SAFETY REQUIREMENTS FOR HYDRAULICALLY POWERED OPEN DIE HOT FORGING PRESSES FOR THE FORGING OF STEEL AND NON-FERROUS METALS |
DIN EN 14656 E : 2010
|
SAFETY OF MACHINERY - SAFETY REQUIREMENTS FOR EXTRUSION PRESSES FOR STEEL AND NON-FERROUS METALS |
UNE-EN 15001-1:2010
|
Gas Infrastructure - Gas installation pipework with an operating pressure greater than 0,5 bar for industrial installations and greater than 5 bar for industrial and non-industrial installations - Part 1: Detailed functional requirements for design, materials, construction, inspection and testing |
BS EN 13480-4:2017
|
Metallic industrial piping Fabrication and installation |
BS EN 14276-2 : 2007
|
PRESSURE EQUIPMENT FOR REFRIGERATING SYSTEMS AND HEAT PUMPS - PART 2: PIPING - GENERAL REQUIREMENTS |
UNE-EN 1515-4:2010
|
Flanges and their joints - Bolting - Part 4: Selection of bolting for equipment subject to the Pressure Equipment Directive 97/23/EC |
BS EN 12952-14:2004
|
Water-tube boilers and auxiliary installations Requirements for flue gas DENOX-systems using liquified pressurized ammonia and ammonia water solution |
BS EN 12952-9:2002
|
Water-tube boilers and auxiliary installations Requirements for firing systems for pulverized solid fuels for the boiler |
UNE-EN 13480-4:2017
|
Metallic industrial piping - Part 4: Fabrication and installation (Endorsed by Asociación Española de Normalización in September of 2019.) |
ISO 10535:2006
|
Hoists for the transfer of disabled persons Requirements and test methods |
UNE-EN 14125:2013
|
Thermoplastic and flexible metal pipework for underground installation at petrol filling stations |
I.S. EN 14276-2:2007
|
PRESSURE EQUIPMENT FOR REFRIGERATING SYSTEMS AND HEAT PUMPS - PART 2: PIPING - GENERAL REQUIREMENTS |
EN 13480-2:2017
|
Metallic industrial piping - Part 2: Materials |
UNE-EN 1591-1:2014
|
Flanges and their joints - Design rules for gasketed circular flange connections - Part 1: Calculation |
BS EN 378-2:2016
|
Refrigerating systems and heat pumps. Safety and environmental requirements Design, construction, testing, marking and documentation |
BS EN 14125:2013
|
Thermoplastic and flexible metal pipework for underground installation at petrol filling stations |
EN 14276-2:2007+A1:2011
|
Pressure equipment for refrigerating systems and heat pumps - Part 2: Piping - General requirements |
BS EN 13941 : 2009
|
DESIGN AND INSTALLATION OF PREINSULATED BONDED PIPE SYSTEMS FOR DISTRICT HEATING |
UNE-EN 12952-3:2012
|
Water-tube boilers and auxiliary installations - Part 3: Design and calculation for pressure parts of the boiler |
EN 1515-4:2009
|
Flanges and their joints - Bolting - Part 4: Selection of bolting for equipment subject to the Pressure Equipment Directive 97/23/EC |
EN 15001-1:2009
|
Gas Infrastructure - Gas installation pipework with an operating pressure greater than 0,5 bar for industrial installations and greater than 5 bar for industrial and non-industrial installations - Part 1: Detailed functional requirements for design, materials, construction, inspection and testing |
EN 14656:2006+A1:2010
|
Safety of machinery - Safety requirements for extrusion presses for steel and non-ferrous metals |
EN 15061:2007+A1:2008
|
Safety of machinery - Safety requirements for strip processing line machinery and equipment |
EN 746-2:2010
|
Industrial thermoprocessing equipment - Part 2: Safety requirements for combustion and fuel handling systems |
EN ISO 28721-4:2015
|
Vitreous and porcelain enamels - Glass-lined apparatus for process plants - Part 4: Quality requirements for glass-lined flanged steel pipes and flanged steel fittings (ISO 28721-4:2015) |
EN 15949:2012
|
Safety of machinery - Safety requirements for bar mills, structural steel mills and wire rod mills |
EN 13941:2009+A1:2010
|
Design and installation of preinsulated bonded pipe systems for district heating |
EN 14125:2013
|
Thermoplastic and flexible metal pipework for underground installation at petrol filling stations |
EN 15711:2009
|
Vitreous and porcelain enamels - Glass lined flanged steel pipes and flanged steel fittings - Quality requirements |
EN 14673:2006+A1:2010
|
Safety of machinery - Safety requirements for hydraulically powered open die hot forging presses for the forging of steel and non-ferrous metals |
EN 1591-1:2013
|
Flanges and their joints - Design rules for gasketed circular flange connections - Part 1: Calculation |
EN 13480-8:2017
|
Metallic industrial piping - Part 8: Additional requirements for aluminium and aluminium alloy piping |
PREN 10253-2 : DRAFT 2017
|
BUTT-WELDING PIPE FITTINGS - PART 2: NON ALLOY AND FERRITIC ALLOY STEELS WITH SPECIFIC INSPECTION REQUIREMENTS |
DIN EN 15711 E : 2009
|
VITREOUS AND PORCELAIN ENAMELS - GLASS LINED FLANGED STEEL PIPES AND FLANGED STEEL FITTINGS - QUALITY REQUIREMENTS |
I.S. EN ISO 28721-4:2015
|
VITREOUS AND PORCELAIN ENAMELS - GLASS-LINED APPARATUS FOR PROCESS PLANTS - PART 4: QUALITY REQUIREMENTS FOR GLASS-LINED FLANGED STEEL PIPES AND FLANGED STEEL FITTINGS (ISO 28721-4:2015) |
07/30140820 DC : 0
|
BS ISO 25457 - PETROLEUM, PETROCHEMICAL AND NATURAL GAS INDUSTRIES - FLARE DETAILS FOR GENERAL REFINERY AND PETROCHEMICAL SERVICE |
CEN/TR 14585-3:2017
|
Corrugated metal hose assemblies for pressure applications - Part 3: Design method |
15/30317351 DC : 0
|
BS EN 13480-8:2012/A2 - METALLIC INDUSTRIAL PIPING - PART 8: ADDITIONAL REQUIREMENTS FOR ALUMINIUM AND ALUMINIUM ALLOY PIPING |
BS EN 15001-1:2009
|
Gas infrastructure. Gas installation pipework with an operating pressure greater than 0,5 bar for industrial installations and greater than 5 bar for industrial and non-industrial installations Detailed functional requirements for design, materials, construction, inspection and testing |
12/30260512 DC : 0
|
BS EN ISO 28721-4 - VITREOUS AND PORCELAIN ENAMELS - GLASS-LINED APPARATUS FOR PROCESS PLANTS - PART 4: QUALITY REQUIREMENTS FOR GLASS-LINED FLANGED STEEL PIPES AND FLANGED STEEL FITTINGS |
DIN EN 1515-4:2010-04
|
Flanges and their joints - Bolting - Part 4: Selection of bolting for equipment subject to the Pressure Equipment Directive 97/23/EC |
11/30246681 DC : 0
|
BS EN 13480-5 - METALLIC INDUSTRIAL PIPING - PART 5: INSPECTION AND TESTING |
I.S. EN 10253-4:2008
|
BUTT-WELDING PIPE FITTINGS - PART 4: WROUGHT AUSTENITIC AND AUSTENITIC-FERRITIC (DUPLEX) STAINLESS STEELS WITH SPECIFIC INSPECTION REQUIREMENTS |
UNE-EN 14917:2011
|
Metal bellows expansion joints for pressure applications |
UNE-EN 13480-1:2017
|
Metallic industrial piping - Part 1: General |
DIN EN 12952-3:2012-03
|
Water-tube boilers and auxiliary installations - Part 3: Design and calculation for pressure parts of the boiler |
I.S. EN 15001-1:2009
|
GAS INFRASTRUCTURE - GAS INSTALLATION PIPEWORK WITH AN OPERATING PRESSURE GREATER THAN 0,5 BAR FOR INDUSTRIAL INSTALLATIONS AND GREATER THAN 5 BAR FOR INDUSTRIAL AND NON-INDUSTRIAL INSTALLATIONS - PART 1: DETAILED FUNCTIONAL REQUIREMENTS FOR DESIGN, MATERIALS, CONSTRUCTION, INSPECTION AND TESTING |
DIN EN 14678-1:2013-06
|
LPG equipment and accessories - Construction and performance of LPG equipment for automotive filling stations - Part 1: Dispensers |
DIN EN ISO 10535:2007-04
|
Hoists for the transfer of disabled persons - Requirements and test methods (ISO 10535:2006) |
DIN EN 14125:2013-09
|
THERMOPLASTIC AND FLEXIBLE METAL PIPEWORK FOR UNDERGROUND INSTALLATION AT PETROL FILLING STATIONS |
BS EN 14656 : 2006
|
SAFETY OF MACHINERY - SAFETY REQUIREMENTS FOR EXTRUSION PRESSES FOR STEEL AND NON-FERROUS METALS |
ISO 28721-4:2015
|
Vitreous and porcelain enamels Glass-lined apparatus for process plants Part 4: Quality requirements for glass-lined flanged steel pipes and flanged steel fittings |
BS EN 14678-1:2013
|
LPG equipment and accessories. Construction and performance of LPG equipment for automotive filling stations Dispensers |
BS EN 12952-3:2011
|
Water-tube boilers and auxiliary installations Design and calculation for pressure parts of the boiler |
ONORM EN 10253-2 : 2008
|
BUTT-WELDING PIPE FITTINGS - PART 2: NON ALLOY AND FERRITIC ALLOY STEELS WITH SPECIFIC INSPECTION REQUIREMENTS |
EN ISO 10535:2006
|
Hoists for the transfer of disabled persons - Requirements and test methods (ISO 10535:2006) |
UNE-EN 13480-2:2017
|
Metallic industrial piping - Part 2: Materials (Endorsed by Asociación Española de Normalización in September of 2019.) |