• IEC 61850-7-3:2010

    Superseded A superseded Standard is one, which is fully replaced by another Standard, which is a new edition of the same Standard.

    Communication networks and systems for power utility automation - Part 7-3: Basic communication structure - Common data classes

    Available format(s):  Hardcopy, PDF, PDF 3 Users, PDF 5 Users, PDF 9 Users

    Superseded date:  02-06-2020

    Language(s):  English - French

    Published date:  16-12-2010

    Publisher:  International Electrotechnical Committee

    Add To Cart

    Table of Contents - (Show below) - (Hide below)

    FOREWORD
    INTRODUCTION
    1 Scope
    2 Normative references
    3 Terms and definitions
    4 Abbreviated terms
    5 Conditions for attribute inclusion
    6 Constructed attribute classes
    7 Common data class specifications
    8 Data attribute semantic
    Annex A (normative) - Value range for units and
            multiplier
    Annex B (informative) - Functional constraints
    Annex C (normative) - Tracking of configuration
            revisions
    Annex D (normative) - SCL enumerations
    Bibliography

    Abstract - (Show below) - (Hide below)

    IEC 61850-7-3:2010 is applicable to the description of device models and functions of substations and feeder equipment. It specifies constructed attribute classes and common data classes related to substation applications. In particular, it specifies common data classes for status information, common data classes for measured information, common data classes for control, common data classes for status settings, common data classes for analogue settings and attribute types used in these common data classes. This second edition defines new common data classes used for new standards defining object models for other domains based on IEC 61850 and for the representation of statistical and historical data.

    This publication is of core relevance for Smart Grid.

    General Product Information - (Show below) - (Hide below)

    Committee TC 57
    Development Note Stability Date: 2017. (09/2017)
    Document Type Standard
    Publisher International Electrotechnical Committee
    Status Superseded
    Superseded By
    Supersedes

    Standards Referenced By This Book - (Show below) - (Hide below)

    CEI EN 61400-25-1 : 2007 WIND TURBINES - PART 25-1: COMMUNICATIONS FOR MONITORING AND CONTROL OF WIND POWER PLANTS - OVERALL DESCRIPTION OF PRINCIPLES AND MODELS
    PD IEC/TS 61850-80-1:2016 Communication networks and systems for power utility automation Guideline to exchanging information from a CDC-based data model using IEC 60870-5-101 or IEC 60870-5-104
    16/30340907 DC : 0 BS EN 61400-25-6 ED 2.0 - WIND TURBINES - PART 25-6: COMMUNICATIONS FOR MONITORING AND CONTROL OF WIND POWER PLANTS - LOGICAL NODE CLASSES AND DATA CLASSES FOR CONDITION MONITORING
    05/30137809 DC : DRAFT AUG 2005 IEC 61400-25-4 ED 1 - WIND TURBINES - PART 25-4: COMMUNICATIONS FOR MONITORING AND CONTROL OF WIND POWER PLANTS - MAPPING TO XML BASED COMMUNICATION PROFILE
    PD IEC/TS 61850-80-4:2016 Communication networks and systems for power utility automation Translation from the COSEM object model (IEC 62056) to the IEC 61850 data model
    12/30274900 DC : 0 BS IEC 61869-9 ED 1.0 - INSTRUMENT TRANSFORMERS - PART 9: DIGITAL INTERFACE FOR INSTRUMENT TRANSFORMERS
    PD IEC/TR 61850-80-3:2015 Communication networks and systems for power utility automation Mapping to web protocols. Requirements and technical choices
    07/30168422 DC : 0 BS EN 61850-8-1 - COMMUNICATION NETWORKS AND SYSTEMS FOR POWER UTILITY AUTOMATION - PART 8-1: SPECIFIC COMMUNICATION SERVICE MAPPING (SCSM) - MAPPINGS TO MMS (ISO 9506-1 AND ISO 9506-2) AND TO ISO/IEC 8802-3
    CEI EN 61850-7-420 : 2010 COMMUNICATION NETWORKS AND SYSTEMS FOR POWER UTILITY AUTOMATION - PART 7-420: BASIC COMMUNICATION STRUCTURE - DISTRIBUTED ENERGY RESOURCES LOGICAL NODES
    16/30344488 DC : 0 BS EN 61850-7-2+A1 - COMMUNICATION NETWORKS AND SYSTEMS FOR POWER UTILITY AUTOMATION - PART 7-2: BASIC INFORMATION AND COMMUNICATION STRUCTURE - ABSTRACT COMMUNICATION SERVICE INTERFACE (ACSI)
    PD IEC/TR 61850-7-500:2017 Communication networks and systems for power utility automation Basic information and communication structure. Use of logical nodes for modeling application functions and related concepts and guidelines for substations
    IEC 61970-301 REDLINE : 6ED 2016 ENERGY MANAGEMENT SYSTEM APPLICATION PROGRAM INTERFACE (EMS-API) - PART 301: COMMON INFORMATION MODEL (CIM) BASE
    CEI EN 61400-25-6 : 2011 WIND ENERGY GENERATION SYSTEMS - PART 25-6: COMMUNICATIONS FOR MONITORING AND CONTROL OF WIND POWER PLANTS - LOGICAL NODE CLASSES AND DATA CLASSES FOR CONDITION MONITORING
    CEI EN 61850-9-2 : 2012 COMMUNICATION NETWORKS AND SYSTEMS FOR POWER UTILITY AUTOMATION - PART 9-2: SPECIFIC COMMUNICATION SERVICE MAPPING (SCSM) - SAMPLED VALUES OVER ISO/IEC 8802-3
    EN 61400-25-5:2017 Wind energy generation systems - Part 25-5: Communications for monitoring and control of wind power plants - Compliance testing
    BS EN 61850-7-420:2009 Communication networks and systems for power utility automation Basic communication structure. Distributed energy resources logical nodes
    BS EN 61850-6:2010 Communication networks and systems for power utility automation Configuration description language for communication in electrical substations related to IEDs
    CEI EN 61850-7-2 : 2012 COMMUNICATION NETWORKS AND SYSTEMS FOR POWER UTILITY AUTOMATION - PART 7-2: BASIC INFORMATION AND COMMUNICATION STRUCTURE - ABSTRACT COMMUNICATION SERVICE INTERFACE (ACSI)
    PREN 50491-12 : DRAFT 2014 GENERAL REQUIREMENTS FOR HOME AND BUILDING ELECTRONIC SYSTEMS (HBES) AND BUILDING AUTOMATION AND CONTROL SYSTEMS (BACS) - PART 12: SMART GRID - APPLICATION SPECIFICATION - INTERFACE AND FRAMEWORK FOR CUSTOMER
    I.S. EN 61400-25-6:2017 WIND ENERGY GENERATION SYSTEMS - PART 25-6: COMMUNICATIONS FOR MONITORING AND CONTROL OF WIND POWER PLANTS - LOGICAL NODE CLASSES AND DATA CLASSES FOR CONDITION MONITORING
    CEI EN 61850-8-1 : 2012 COMMUNICATION NETWORKS AND SYSTEMS FOR POWER UTILITY AUTOMATION - PART 8-1: SPECIFIC COMMUNICATION SERVICE MAPPING (SCSM) - MAPPINGS TO MMS (ISO 9506-1 AND ISO 9506-2) AND TO ISO/IEC 8802-3
    I.S. EN 61850-9-2:2011 COMMUNICATION NETWORKS AND SYSTEMS FOR POWER UTILITY AUTOMATION - PART 9-2: SPECIFIC COMMUNICATION SERVICE MAPPING (SCSM) - SAMPLED VALUES OVER ISO/IEC 8802-3 (IEC 61850-9-2:2011 (EQV))
    CEI CLC/TS 61850-80-1 : 2012 COMMUNICATION NETWORKS AND SYSTEMS FOR POWER UTILITY AUTOMATION - PART 80-1: GUIDELINE TO EXCHANGING INFORMATION FROM A CDC-BASED DATA MODEL USING IEC 60870-5-101 OR IEC 60870-5-104
    IEC 61970-301:2016 Energy management system application program interface (EMS-API) - Part 301: Common information model (CIM) base
    IEC 61850-6:2009 Communication networks and systems for power utility automation - Part 6: Configuration description language for communication in electrical substations related to IEDs
    IEC TR 61850-1:2013 Communication networks and systems for power utility automation - Part 1: Introduction and overview
    NF EN 61850-6 : 2004 COMMUNICATION NETWORKS AND SYSTEMS IN SUBSTATIONS - PART 6: CONFIGURATION DESCRIPTION LANGUAGE FOR COMMUNICATION IN ELECTRICAL SUBSTATIONS RELATED TO IEDS
    IEC 61400-25-4:2016 RLV Wind energy generation systems - Part 25-4: Communications for monitoring and control of wind power plants - Mapping to communication profile
    EN 61400-25-4:2017 Wind energy generation systems - Part 25-4: Communications for monitoring and control of wind power plants - Mapping to communication profile
    EN 61850-10:2013 Communication networks and systems for power utility automation - Part 10: Conformance testing
    IEC 61400-25-3:2015 RLV Wind turbines - Part 25-3: Communications for monitoring and control of wind power plants - Information exchange models
    EN 62271-3:2015 High-voltage switchgear and controlgear - Part 3: Digital interfaces based on IEC 61850
    EN 61400-25-6:2017 Wind energy generation systems - Part 25-6: Communications for monitoring and control of wind power plants - Logical node classes and data classes for condition monitoring
    IEC 61970-301:2016 RLV Energy management system application program interface (EMS-API) - Part 301: Common information model (CIM) base
    EN 61850-7-420:2009 Communication networks and systems for power utility automation - Part 7-420: Basic communication structure - Distributed energy resources logical nodes
    EN 61850-6:2010 Communication networks and systems for power utility automation - Part 6: Configuration description language for communication in electrical substations related to IEDs
    EN 61850-9-1:2003 Communication networks and systems in substations - Part 9-1: Specific Communication Service Mapping (SCSM) - Sampled values over serial unidirectional multidrop point to point link
    03/110578 DC : DRAFT AUG 2003 IEC 61400-25 ED.1.0 - WIND TURBINES - PART 25: COMMUNICATIONS FOR MONITORING AND CONTROL OF WIND POWER PLANTS
    IEEE 1547.3 : 2007 MONITORING, INFORMATION EXCHANGE, AND CONTROL OF DISTRIBUTED RESOURCES INTERCONNECTED WITH ELECTRIC POWER SYSTEMS
    09/30145360 DC : 0 BS EN 61850-9-2 - COMMUNICATION NETWORKS AND SYSTEMS FOR POWER UTILITY AUTOMATION - PART 9-2: SPECIFIC COMMUNICATION SERVICE MAPPING (SCSM)- SAMPLED VALUES OVER ISO/IEC 8802-3
    05/30137801 DC : DRAFT AUG 2005 IEC 61400-25-2 ED 1 - WIND TURBINES - PART 25-2: COMMUNICATIONS FOR MONITORING AND CONTROL OF WIND POWER PLANTS - INFORMATION MODELS
    02/206919 DC : DRAFT MAY 2002 IEC 61850-8-1. ED.1.0 - COMMUNICATION NETWORKS AND SYSTEMS IN SUBSTATIONS - PART 8-1: SPECIFIC COMMUNICATION SERVICE MAPPING (SCSM) - MAPPING TO MMS (ISO/IEC 9506 PART 1 AND PART 2) OVER ISO 8802-3
    I.S. EN 61400-25-2:2015 WIND TURBINES - PART 25-2: COMMUNICATIONS FOR MONITORING AND CONTROL OF WIND POWER PLANTS - INFORMATION MODELS
    CEI EN 61850-5 : 2013 COMMUNICATION NETWORKS AND SYSTEMS FOR POWER UTILITY AUTOMATION - PART 5: COMMUNICATION REQUIREMENTS FOR FUNCTIONS AND DEVICE MODELS
    CEI EN 61850-10 : 2013 COMMUNICATION NETWORKS AND SYSTEMS FOR POWER UTILITY AUTOMATION - PART 10: CONFORMANCE TESTING
    16/30344309 DC : 0 BS ISO 17800 - FACILITY SMART GRID INFORMATION MODEL
    16/30346107 DC : 0 BS EN 61400-25-1 ED.2 - WIND ENERGY GENERATION SYSTEMS - PART 25-1: COMMUNICATIONS FOR MONITORING AND CONTROL OF WIND POWER PLANTS - OVERALL DESCRIPTION OF PRINCIPLES AND MODELS
    17/30358470 DC : 0 BS EN 61850-8-2 ED1 - COMMUNICATION NETWORKS AND SYSTEMS FOR POWER UTILITY AUTOMATION - PART 8-2: SPECIFIC COMMUNICATION SERVICE MAPPING (SCSM) - MAPPING TO EXTENSIBLE MESSAGING PRESENCE PROTOCOL (XMPP)
    I.S. EN 62271-3:2015 HIGH-VOLTAGE SWITCHGEAR AND CONTROLGEAR - PART 3: DIGITAL INTERFACES BASED ON IEC 61850
    DD CLC/TS 61850-80-1:2010 Communication networks and systems for power utility automation Guideline to exchanging information from a CDC-based data model using IEC 60870-5-101 or IEC 60870-5-104
    BS EN 61400-25-2:2015 Wind turbines Communications for monitoring and control of wind power plants - Information models
    09/30212527 DC : 0 BS EN 61850-7-410 - COMMUNICATION NETWORKS AND SYSTEMS FOR POWER UTILITY AUTOMATION - PART 7-410: HYDROELECTRIC POWER PLANTS - COMMUNICATION FOR MONITORING AND CONTROL
    BS EN 61850-9-2:2011 Communication networks and systems for power utility automation Specific communication service mapping (SCSM). Sampled values over ISO/IEC 8802-3
    12/30260040 DC : 0 BS EN 62270 - GUIDE FOR COMPUTER-BASED CONTROL FOR HYDROELECTRIC POWER PLANT AUTOMATION
    04/30092543 DC : DRAFT MAR 2004
    ASHRAE/NEMA 201 : 2016 ERRATA 2018 FACILITY SMART GRID INFORMATION MODEL
    IEC TS 62351-2:2008 Power systems management and associated information exchange - Data and communications security - Part 2: Glossary of terms
    IEC TR 61850-90-5:2012 Communication networks and systems for power utility automation - Part 90-5: Use of IEC 61850 to transmit synchrophasor information according to IEEE C37.118
    IEEE C37.119-2005 IEEE Guide for Breaker Failure Protection of Power Circuit Breakers
    PREN 50491-12-1 : DRAFT 2017 GENERAL REQUIREMENTS FOR HOME AND BUILDING ELECTRONIC SYSTEMS (HBES) AND BUILDING AUTOMATION AND CONTROL SYSTEMS (BACS) - SMART GRID - APPLICATION SPECIFICATION - INTERFACE AND FRAMEWORK FOR CUSTOMER - PART 12-1: INTERFACE BETWEEN THE CEM AND HOME/BUILDING RESOURCE MANAGER - GENERAL REQUIREMENTS AND ARCHITECTURE
    IEC TR 61850-90-7:2013 Communication networks and systems for power utility automation - Part 90-7: Object models for power converters in distributed energy resources (DER) systems
    I.S. EN 62689-1:2016 CURRENT AND VOLTAGE SENSORS OR DETECTORS, TO BE USED FOR FAULT PASSAGE INDICATION PURPOSES - PART 1: GENERAL PRINCIPLES AND REQUIREMENTS
    IEC TS 61850-80-4:2016 Communication networks and systems for power utility automation - Part 80-4: Translation from the COSEM object model (IEC 62056) to the IEC 61850 data model
    IEC 61400-25-3 REDLINE : 2ED 2015 WIND TURBINES - PART 25-3: COMMUNICATIONS FOR MONITORING AND CONTROL OF WIND POWER PLANTS - INFORMATION EXCHANGE MODELS
    IEC 62689-1:2016 Current and voltage sensors or detectors, to be used for fault passage indication purposes - Part 1: General principles and requirements
    BS EN 62271-3:2015 High-voltage switchgear and controlgear Digital interfaces based on IEC 61850
    PD IEC/TR 61850-7-510:2012 Communication networks and systems for power utility automation Basic communication structure. Hydroelectric power plants. Modelling concepts and guidelines
    14/30284930 DC : 0 BS EN 62689-2 ED 1.0 - CURRENT AND VOLTAGE SENSORS OR DETECTORS TO BE USED FOR FAULT PASSAGE INDICATION PURPOSES - PART 2: GENERAL PRINCIPLES AND REQUIREMENTS
    BS EN 61850-7-4:2010 Communication networks and systems for power utility automation Basic communication structure. Compatible logical node classes and data object classes
    DD IEC/TS 62351-7:2010 Power systems management and associated information exchange. Data and communication security Network and system management (NSM) data object models
    BS EN 61400-25-4:2008 Wind turbines Communications for monitoring and control of wind power plants. Mapping to communication profile
    PD IEC/TR 61850-1:2013 Communication networks and systems for power utility automation Introduction and overview
    DD IEC TS 61850-80-1 : DRAFT JAN 2009 COMMUNICATION NETWORKS AND SYSTEMS FOR POWER UTILITY AUTOMATION - PART 80-1: GUIDELINE TO EXCHANGING INFORMATION FROM A CDC-BASED DATA MODEL USING IEC 60870-5-101 OR IEC 60870-5-104
    12/30267268 DC : 0 BS EN 61869-9 ED 1.0 - INSTRUMENT TRANSFORMERS - PART 9: DIGITAL INTERFACE FOR INSTRUMENT TRANSFORMERS
    CLC/TS 61850-80-1:2010 Communication networks and systems for power utility automation - Part 80-1: Guideline to exchanging information from a CDC-based data model using IEC 60870-5-101 or IEC 60870-5-104
    03/304152 DC : DRAFT MAR 2003 IEC 61850-10 ED.1.0 - COMMUNICATION NETWORKS AND SYSTEMS IN SUBSTATIONS - PART 10: CONFORMANCE TESTING
    CEI EN 61400-25-4 : 2009 WIND ENERGY GENERATION SYSTEMS - PART 25-4: COMMUNICATIONS FOR MONITORING AND CONTROL OF WIND POWER PLANTS - MAPPING TO COMMUNICATION PROFILE
    17/30362273 DC : DRAFT SEP 2017 BS EN 50491-12-1 - GENERAL REQUIREMENTS FOR HOME AND BUILDING ELECTRONIC SYSTEMS (HBES) AND BUILDING AUTOMATION AND CONTROL SYSTEMS (BACS) - SMART GRID - APPLICATION SPECIFICATION - INTERFACE AND FRAMEWORK FOR CUSTOMER - PART 12-1: INTERFACE BETWEEN THE CEM AND HOME/BUILDING RESOURCE MANAGER - GENERAL REQUIREMENTS AND ARCHITECTURE
    PD IEC/TR 61850-90-4:2013 Communication networks and systems for power utility automation Network engineering guidelines
    02/206918 DC : DRAFT MAY 2002 IEC 61850-6. ED.1 - COMMUNICATION NETWORKS AND SYSTEMS IN SUBSTATIONS - PART 6: SUBSTATION AUTOMATION SYSTEM CONFIGURATION DESCRIPTION LANGUAGE
    DD IEC/TS 61850-2:2003 Communication networks and systems in substations Glossary
    07/30147754 DC : 0 BS IEC 61850-6 - COMMUNICATION NETWORKS AND SYSTEMS FOR POWER UTILITY AUTOMATION - PART 6: CONFIGURATION DESCRIPTION LANGUAGE FOR COMMUNICATION IN ELECTRICAL SUBSTATIONS RELATED TO IEDS
    12/30265386 DC : 0 BS EN 62271-3 ED 2 - HIGH-VOLTAGE SWITCHGEAR AND CONTROLGEAR - PART 3: DIGITAL INTERFACES BASED ON IEC 61850
    I.S. EN 62361-2:2013 POWER SYSTEMS MANAGEMENT AND ASSOCIATED INFORMATION EXCHANGE - INTEROPERABILITY IN THE LONG TERM - PART 2: END TO END QUALITY CODES FOR SUPERVISORY CONTROL AND DATA ACQUISITION (SCADA)
    11/30251804 DC : 0 BS EN 61850-10 - COMMUNICATION NETWORKS AND SYSTEMS FOR POWER UTILITY AUTOMATION - PART 10: CONFORMANCE TESTING
    BS EN 61970-301:2017 Energy management system application program interface (EMS-API) Common information model (CIM) base
    BS EN 61850-7-2:2010 Communication networks and systems for power utility automation Basic information and communication structure. Abstract communication service interface (ACSI)
    16/30336107 DC : 0 BS EN 61850-7-4 AMD1 - COMMUNICATION NETWORKS AND SYSTEMS FOR POWER UTILITY AUTOMATION - PART 7-4: BASIC COMMUNICATION STRUCTURE - COMPATIBLE LOGICAL NODE CLASSES AND DATA OBJECT CLASSES
    BS EN 61850-7-1:2011 Communication networks and systems for power utility automation Basic communication structure. Principles and models
    BS EN 62689-2:2017 Current and voltage sensors or detectors, to be used for fault passage indication purposes System aspects
    15/30326344 DC : 0 BS EN 61850-8-2 ED 1.0 - COMMUNICATION NETWORKS AND SYSTEMS FOR POWER UTILITY AUTOMATION - PART 8-2: SPECIFIC COMMUNICATION SERVICE MAPPING (SCSM) - MAPPING TO EXTENSIBLE MESSAGING PRESENCE PROTOCOL (XMPP)
    CEI EN 61850-9-1 : 2015 COMMUNICATION NETWORKS AND SYSTEMS IN SUBSTATIONS - PART 9-1: SPECIFIC COMMUNICATION SYSTEM MAPPINGS (SCSM) - SAMPLED VALUES OVER SERIAL UNIDIRECTIONAL MULTIDROP POINT TO POINT LINK
    BS EN 61850-5:2013 Communication networks and systems for power utility automation Communication requirements for functions and device models
    EN 62689-2:2017 Current and voltage sensors or detectors, to be used for fault passage indication purposes - Part 2: System aspects
    IEC TR 61850-7-510:2012 Communication networks and systems for power utility automation - Part 7-510: Basic communication structure - Hydroelectric power plants - Modelling concepts and guidelines
    ISO 17800:2017 Facility smart grid information model
    CEI EN 61400-25-5 : 2007 WIND TURBINES - PART 25-5: COMMUNICATIONS FOR MONITORING AND CONTROL OF WIND POWER PLANTS - CONFORMANCE TESTING
    I.S. EN 61850-6:2010 COMMUNICATION NETWORKS AND SYSTEMS FOR POWER UTILITY AUTOMATION - PART 6: CONFIGURATION DESCRIPTION LANGUAGE FOR COMMUNICATION IN ELECTRICAL SUBSTATIONS RELATED TO IEDS
    I.S. EN 61850-7-4:2010 COMMUNICATION NETWORKS AND SYSTEMS FOR POWER UTILITY AUTOMATION - PART 7-4: BASIC COMMUNICATION STRUCTURE - COMPATIBLE LOGICAL NODE CLASSES AND DATA OBJECT CLASSES
    I.S. EN 61850-7-420:2009 COMMUNICATION NETWORKS AND SYSTEMS FOR POWER UTILITY AUTOMATION - PART 7-420: BASIC COMMUNICATION STRUCTURE - DISTRIBUTED ENERGY RESOURCES LOGICAL NODES
    IEC 62689-2:2016 Current and voltage sensors or detectors, to be used for fault passage indication purposes - Part 2: System aspects
    CEI EN 61850-7-4 : 2010 COMMUNICATION NETWORKS AND SYSTEMS FOR POWER UTILITY AUTOMATION - PART 7-4: BASIC COMMUNICATION STRUCTURE - COMPATIBLE LOGICAL NODE CLASSES AND DATA OBJECT CLASSES
    IEC 61869-9:2016 Instrument transformers - Part 9: Digital interface for instrument transformers
    IEC 62270:2013 Guide for computer-based control for hydroelectric power plant automation
    I.S. EN 61970-301:2017 ENERGY MANAGEMENT SYSTEM APPLICATION PROGRAM INTERFACE (EMS-API) - PART 301: COMMON INFORMATION MODEL (CIM) BASE
    NF EN 61850-7-2 : 2003 COMMUNICATION NETWORKS AND SYSTEMS IN SUBSTATIONS - PART 7-2: BASIC COMMUNICATION STRUCTURE FOR SUBSTATION AND FEEDER EQUIPMENT - ABSTRACT COMMUNICATION SERVICE INTERFACE (ACSI)
    IEC 62361-2:2013 Power systems management and associated information exchange - Interoperability in the long term - Part 2: End to end quality codes for supervisory control and data acquisition (SCADA)
    EN 61850-7-4:2010 Communication networks and systems for power utility automation - Part 7-4: Basic communication structure - Compatible logical node classes and data object classes
    EN 61850-9-2:2011 Communication networks and systems for power utility automation - Part 9-2: Specific communication service mapping (SCSM) - Sampled values over ISO/IEC 8802-3
    EN 61850-7-1:2011 COMMUNICATION NETWORKS AND SYSTEMS FOR POWER UTILITY AUTOMATION - PART 7-1: BASIC COMMUNICATION STRUCTURE - PRINCIPLES AND MODELS (IEC 61850-7-1:2011)
    PD IEC/TR 61850-90-7:2013 Communication networks and systems for power utility automation Object models for power converters in distributed energy resources (DER) systems
    BS EN 62361-2:2013 Power systems management and associated information exchange. Interoperability in the long term End to end quality codes for supervisory control and data acquisition (SCADA)
    BS EN 61850-9-1:2003 Communication networks and systems in substations. Specific communication service mapping (SCSM) Sampled values over serial unidirectional multidrop point to point link
    17/30358185 DC : 0 BS EN 61850-8-1+A1 - COMMUNICATION NETWORKS AND SYSTEMS FOR POWER UTILITY AUTOMATION - PART 8-1: SPECIFIC COMMUNICATION SERVICE MAPPING (SCSM) - MAPPINGS TO MMS (ISO 9506-1 AND ISO 9506-2) AND TO ISO/IEC 8802-3
    OVE/ONORM EN 61400-25-1 : 2007 WIND TURBINES - PART 25-1: COMMUNICATIONS FOR MONITORING AND CONTROL OF WIND POWER PLANTS - OVERALL DESCRIPTION OF PRINCIPLES AND MODELS
    EN 62689-1:2016 Current and voltage sensors or detectors, to be used for fault passage indication purposes - Part 1: General principles and requirements
    PD IEC/TR 61850-90-2:2016 Communication networks and systems for power utility automation Using IEC 61850 for communication between substations and control centres
    CEI EN 61850-7-1 : 2012 COMMUNICATION NETWORKS AND SYSTEMS FOR POWER UTILITY AUTOMATION - PART 7-1: BASIC COMMUNICATION STRUCTURE - PRINCIPLES AND MODELS
    05/30137797 DC : DRAFT AUG 2005 IEC 61400-25-1 ED 1 - WIND TURBINES - PART 25-1: COMMUNICATIONS FOR MONITORING AND CONTROL OF WIND POWER PLANTS - OVERALL DESCRIPTION OF PRINCIPLES AND MODELS
    08/30182501 DC : DRAFT MAY 2008 BS EN 61850-7-1 - COMMUNICATION NETWORKS AND SYSTEMS FOR POWER UTILITY AUTOMATION - PART 7-1: BASIC COMMUNICATION STRUCTURE - PRINCIPLES AND MODELS
    14/30301438 DC : 0 BS EN 62746-3 ED 1.0 - SYSTEMS INTERFACE BETWEEN CUSTOMER ENERGY MANAGEMENT SYSTEM AND THE POWER MANAGEMENT SYSTEM - PART 3: ARCHITECTURE
    07/30166755 DC : 0 BS EN 61850-7-4 - COMMUNICATION NETWORKS AND SYSTEMS FOR POWER UTILITY AUTOMATION - PART 7-4: BASIC COMMUNICATION STRUCTURE - COMPATIBLE LOGICAL NODE CLASSES AND DATA CLASSES
    BS EN 62689-1:2016 Current and voltage sensors or detectors, to be used for fault passage indication purposes General principles and requirements
    PD IEC/TR 61850-90-5:2012 Communication networks and systems for power utility automation Use of IEC 61850 to transmit synchrophasor information according to IEEE C37.118
    BS EN 61400-25-6:2017 Wind energy generation systems Communications for monitoring and control of wind power plants. Logical node classes and data classes for condition monitoring
    BS EN 61850-10:2013 Communication networks and systems for power utility automation Conformance testing
    DD IEC/TS 62351-2:2008 Power systems management and associated information exchange. Data and communications security Glossary of terms
    IEC TR 61850-7-500:2017 Communication networks and systems for power utility automation - Part 7-500: Basic information and communication structure - Use of logical nodes for modeling application functions and related concepts and guidelines for substations
    I.S. EN 61850-9-1:2003 COMMUNICATION NETWORKS AND SYSTEMS IN SUBSTATIONS - PART 9-1: SPECIFIC COMMUNICATION SERVICE MAPPING (SCSM) - SAMPLED VALUES OVER SERIAL UNIDIRECTIONAL MULTIDROP POINT TO POINT LINK
    IEC TR 61850-90-10:2017 Communication networks and systems for power utility automation - Part 90-10: Models for scheduling
    CEI EN 62361-2 : 2014 POWER SYSTEMS MANAGEMENT AND ASSOCIATED INFORMATION EXCHANGE - INTEROPERABILITY IN THE LONG TERM - PART 2: END-TO-END QUALITY CODES FOR SCADA
    I.S. EN 62689-2:2017 CURRENT AND VOLTAGE SENSORS OR DETECTORS, TO BE USED FOR FAULT PASSAGE INDICATION PURPOSES - PART 2: SYSTEM ASPECTS
    BS EN 61850-7-410 : 2013 COMMUNICATION NETWORKS AND SYSTEMS FOR POWER UTILITY AUTOMATION - PART 7-410: BASIC COMMUNICATION STRUCTURE - HYDROELECTRIC POWER PLANTS - COMMUNICATION FOR MONITORING AND CONTROL
    I.S. EN 61850-7-2:2010 COMMUNICATION NETWORKS AND SYSTEMS FOR POWER UTILITY AUTOMATION - PART 7-2: BASIC INFORMATION AND COMMUNICATION STRUCTURE - ABSTRACT COMMUNICATION SERVICE INTERFACE (ACSI)
    I.S. EN 61400-25-5:2017 WIND ENERGY GENERATION SYSTEMS - PART 25-5: COMMUNICATIONS FOR MONITORING AND CONTROL OF WIND POWER PLANTS - COMPLIANCE TESTING
    NF EN 61400-25-4 : 2017 WIND ENERGY GENERATION SYSTEMS - PART 25-4: COMMUNICATIONS FOR MONITORING AND CONTROL OF WIND POWER PLANTS - MAPPING TO COMMUNICATION PROFILE
    IEC TS 62351-7:2010 Power systems management and associated information exchange - Data and communications security - Part 7: Network and system management (NSM) data object models
    I.S. EN 61400-25-3:2015 WIND TURBINES - PART 25-3: COMMUNICATIONS FOR MONITORING AND CONTROL OF WIND POWER PLANTS - INFORMATION EXCHANGE MODELS
    NF EN 61850-7-4 : 2003 COMMUNICATION NETWORKS AND SYSTEMS IN SUBSTATIONS - PART 7-4: BASIC COMMUNICATION STRUCTURE FOR SUBSTATION AND FEEDER EQUIPMENT - COMPATIBLE LOGICAL NODE CLASSES AND DATA CLASSES
    IEC TS 61850-80-1:2016 Communication networks and systems for power utility automation - Part 80-1: Guideline to exchanging information from a CDC-based data model using IEC 60870-5-101 or IEC 60870-5-104
    I.S. EN 61850-7-1:2011 COMMUNICATION NETWORKS AND SYSTEMS FOR POWER UTILITY AUTOMATION - PART 7-1: BASIC COMMUNICATION STRUCTURE - PRINCIPLES AND MODELS (IEC 61850-7-1:2011 (EQV))
    I.S. EN 61850-8-1:2011 COMMUNICATION NETWORKS AND SYSTEMS FOR POWER UTILITY AUTOMATION - PART 8-1: SPECIFIC COMMUNICATION SERVICE MAPPING (SCSM) - MAPPINGS TO MMS (ISO 9506-1 AND ISO 9506-2) AND TO ISO/IEC 8802-3
    IEC TR 62351-90-1:2018 Power systems management and associated information exchange - Data and communications security - Part 90-1: Guidelines for handling role-based access control in power systems
    IEC TR 61850-80-3:2015 Communication networks and systems for power utility automation - Part 80-3: Mapping to web protocols - Requirements and technical choices
    IEC 61850-9-2:2011 Communication networks and systems for power utility automation - Part 9-2: Specific communication service mapping (SCSM) - Sampled values over ISO/IEC 8802-3
    IEC 61850-7-4:2010 Communication networks and systems for power utility automation - Part 7-4: Basic communication structure - Compatible logical node classes and data object classes
    I.S. EN 61850-9-2:2011&A1:2020 Communication networks and systems for power utility automation - Part 9-2: Specific communication service mapping (SCSM) - Sampled values over ISO/IEC 8802-3 (IEC 61850-9-2:2011/A1:2020)
    IEC 61850-7-2:2010 Communication networks and systems for power utility automation - Part 7-2: Basic information and communication structure - Abstract communication service interface (ACSI)
    IEC 61400-25-4:2016 Wind energy generation systems - Part 25-4: Communications for monitoring and control of wind power plants - Mapping to communication profile
    IEC 61400-25-2:2015 Wind turbines - Part 25-2: Communications for monitoring and control of wind power plants - Information models
    IEC 61850-7-1:2011 Communication networks and systems for power utility automation - Part 7-1: Basic communication structure - Principles and models
    IEC 62271-3:2015 High-voltage switchgear and controlgear - Part 3: Digital interfaces based on IEC 61850
    IEC 61850-7-410:2012+AMD1:2015 CSV Communication networks and systems for power utility automation - Part 7-410: Basic communication structure - Hydroelectric power plants - Communication for monitoring and control
    IEC 61850-9-1:2003 Communication networks and systems in substations - Part 9-1: Specific Communication Service Mapping (SCSM) - Sampled values over serial unidirectional multidrop point to point link
    EN 61850-8-1:2011 Communication networks and systems for power utility automation - Part 8-1: Specific communication service mapping (SCSM) - Mappings to MMS (ISO 9506-1 and ISO 9506-2) and to ISO/IEC 8802-3
    IEC 61400-25-3:2015 Wind turbines - Part 25-3: Communications for monitoring and control of wind power plants - Information exchange models
    IEC 61850-7-420:2009 Communication networks and systems for power utility automation - Part 7-420: Basic communication structure - Distributed energy resources logical nodes
    EN 61850-7-2:2010 COMMUNICATION NETWORKS AND SYSTEMS FOR POWER UTILITY AUTOMATION - PART 7-2: BASIC INFORMATION AND COMMUNICATION STRUCTURE - ABSTRACT COMMUNICATION SERVICE INTERFACE (ACSI)
    EN 61400-25-3:2015 Wind turbines - Part 25-3: Communications for monitoring and control of wind power plants - Information exchange models
    07/30166751 DC : 0 BS EN 61850-7-2 - COMMUNICATION NETWORKS AND SYSTEMS FOR POWER UTILITY AUTOMATION - PART 7-2: BASIC INFORMATION AND COMMUNICATION STRUCTURE - ABSTRACT COMMUNICATION SERVICE INTERFACE (ACSI)
    06/30145429 DC : DRAFT MAY 2006
    S.R. CLC/TS 61850-80-1:2010 COMMUNICATION NETWORKS AND SYSTEMS FOR POWER UTILITY AUTOMATION - PART 80-1: GUIDELINE TO EXCHANGING INFORMATION FROM A CDC-BASED ATA MODEL USING IEC 60870-5-101 OR IEC 60870-5-104
    I.S. EN 61850-7-410:2013 COMMUNICATION NETWORKS AND SYSTEMS FOR POWER UTILITY AUTOMATION - PART 7-410: BASIC COMMUNICATION STRUCTURE - HYDROELECTRIC POWER PLANTS - COMMUNICATION FOR MONITORING AND CONTROL
    12/30268049 DC : 0 BS EN 62689-1 - CURRENT AND VOLTAGE SENSORS OR DETECTORS, TO BE USED FOR FAULT PASSAGE INDICATION PURPOSES - PART 1: GENERAL PRINCIPLES AND REQUIREMENTS
    05/30137813 DC : DRAFT AUG 2005 IEC 61400-25-5 ED 1 - WIND TURBINES - PART 25-5: COMMUNICATIONS FOR MONITORING AND CONTROL OF WIND POWER PLANTS - CONFORMANCE TESTING
    15/30325214 DC : 0 BS EN 61400-25-4 ED 2.0 - WIND TURBINES - PART 25-4: COMMUNICATIONS FOR MONITORING AND CONTROL OF WIND POWER PLANTS - MAPPING TO COMMUNICATION PROFILE
    BS EN 61400-25-3:2015 Wind turbines Communications for monitoring and control of wind power plants. Information exchange models
    PD IEC/TR 61850-90-10:2017 Communication networks and systems for power utility automation Models for scheduling
    IEC TS 61850-2:2003 Communication networks and systems in substations - Part 2: Glossary
    14/30300261 DC : 0 BS EN 62689-1 ED 1.0 - CURRENT AND VOLTAGE SENSORS OR DETECTORS TO BE USED FOR FAULT PASSAGE INDICATION PURPOSES - PART 1: SYSTEM ASPECTS
    BS EN 61850-8-1:2011 Communication networks and systems for power utility automation Specific communication service mapping (SCSM). Mappings to MMS (ISO 9506-1 and ISO 9506-2) and to ISO/IEC 8802-3
    IEEE 1815.1-2015 IEEE Standard for Exchanging Information Between Networks Implementing IEC 61850 and IEEE Std 1815(TM) [Distributed Network Protocol (DNP3)]
    I.S. EN 61400-25-4:2017 WIND ENERGY GENERATION SYSTEMS - PART 25-4: COMMUNICATIONS FOR MONITORING AND CONTROL OF WIND POWER PLANTS - MAPPING TO COMMUNICATION PROFILE
    IEC 61400-25-4 REDLINE : 2ED 2016 WIND ENERGY GENERATION SYSTEMS - PART 25-4: COMMUNICATIONS FOR MONITORING AND CONTROL OF WIND POWER PLANTS - MAPPING TO COMMUNICATION PROFILE
    CEI EN 61850-6 : 2010 COMMUNICATION NETWORKS AND SYSTEMS FOR POWER UTILITY AUTOMATION - PART 6: CONFIGURATION DESCRIPTION LANGUAGE FOR COMMUNICATION IN ELECTRICAL SUBSTATIONS RELATED TO IEDS
    BS EN 61400-25-5:2017 Wind energy generation systems Communications for monitoring and control of wind power plants. Compliance testing
    NF EN 61400-25-2 : 2016 WIND TURBINES - PART 25-2: COMMUNICATIONS FOR MONITORING AND CONTROL OF WIND POWER PLANTS - INFORMATION MODELS
    IEEE/IEC 1249-2013 IEC/IEEE Guide for Computer-based Control for Hydroelectric Power Plant Automation
    IEEE 2030.100-2017 IEEE Recommended Practice for Implementing an IEC 61850-Based Substation Communications, Protection, Monitoring, and Control System
    NF EN 61850-7-410 : 2013 AMD 1 2016 COMMUNICATION NETWORKS AND SYSTEMS FOR POWER UTILITY AUTOMATION - PART 7-410: BASIC COMMUNICATION STRUCTURE - HYDROELECTRIC POWER PLANTS - COMMUNICATION FOR MONITORING AND CONTROL
    IEC TR 61850-90-2:2016 Communication networks and systems for power utility automation - Part 90-2: Using IEC 61850 for communication between substations and control centres
    IEC 61400-25-5:2017 Wind energy generation systems - Part 25-5: Communications for monitoring and control of wind power plants - Compliance testing
    I.S. EN 61850-5:2013 COMMUNICATION NETWORKS AND SYSTEMS FOR POWER UTILITY AUTOMATION - PART 5: COMMUNICATION REQUIREMENTS FOR FUNCTIONS AND DEVICE MODELS (IEC 61850-5:2013 (EQV))
    I.S. EN 61850-10:2013 COMMUNICATION NETWORKS AND SYSTEMS FOR POWER UTILITY AUTOMATION - PART 10: CONFORMANCE TESTING (IEC 61850-10:2012 (EQV))
    EN 61850-7-410:2013/A1:2016 COMMUNICATION NETWORKS AND SYSTEMS FOR POWER UTILITY AUTOMATION - PART 7-410: BASIC COMMUNICATION STRUCTURE - HYDROELECTRIC POWER PLANTS - COMMUNICATION FOR MONITORING AND CONTROL (IEC 61850-7-410:2012/A1:2015)
    IEC 61850-8-1:2011 Communication networks and systems for power utility automation - Part 8-1: Specific communication service mapping (SCSM) - Mappings to MMS (ISO 9506-1 and ISO 9506-2) and to ISO/IEC 8802-3
    EN 61970-301:2017 Energy management system application program interface (EMS-API) - Part 301: Common information model (CIM) base
    IEC 61850-10:2012 Communication networks and systems for power utility automation - Part 10: Conformance testing
    IEC 61400-25-6:2016 Wind energy generation systems - Part 25-6: Communications for monitoring and control of wind power plants - Logical node classes and data classes for condition monitoring
    IEC 61850-5:2013 Communication networks and systems for power utility automation - Part 5: Communication requirements for functions and device models
    EN 62361-2 : 2013 POWER SYSTEMS MANAGEMENT AND ASSOCIATED INFORMATION EXCHANGE - INTEROPERABILITY IN THE LONG TERM - PART 2: END TO END QUALITY CODES FOR SUPERVISORY CONTROL AND DATA ACQUISITION (SCADA) (IEC 62361-2:2013)
    EN 61400-25-2:2015 Wind turbines - Part 25-2: Communications for monitoring and control of wind power plants - Information models
    EN 61850-5:2013 Communication networks and systems for power utility automation - Part 5: Communication requirements for functions and device models

    Standards Referencing This Book - (Show below) - (Hide below)

    IEC 61850-7-2:2010 Communication networks and systems for power utility automation - Part 7-2: Basic information and communication structure - Abstract communication service interface (ACSI)
    IEEE C37.118-2005 IEEE Standard for Synchrophasors for Power Systems
    IEC 61850-7-1:2011 Communication networks and systems for power utility automation - Part 7-1: Basic communication structure - Principles and models
    ISO 4217:2015 Codes for the representation of currencies
    IEC 61850-7-4:2010 Communication networks and systems for power utility automation - Part 7-4: Basic communication structure - Compatible logical node classes and data object classes
    IEC TS 61850-2:2003 Communication networks and systems in substations - Part 2: Glossary
    • Access your standards online with a subscription

      Features

      • Simple online access to standards, technical information and regulations
      • Critical updates of standards and customisable alerts and notifications
      • Multi - user online standards collection: secure, flexibile and cost effective