FOREWORD
INTRODUCTION
1 Scope
2 Definitions
3 Abbreviations
4 General preparation before conducting the FAT
4.1 Documents typically prepared by the OWNER/CONTRACTOR
4.2 Documents typically prepared by the VENDOR
5 Factory acceptance test
5.1 General
5.2 Test schedule
5.3 Test procedure
5.4 FAT rework
5.5 Documentation of FAT in accordance with Annex A
6 Site acceptance test
6.1 General
6.2 Test schedule
7 Site integration test
7.1 General
7.2 Test schedule
Annex A (informative) FAT checklists
A.1 Documentation check
A.2 HW and SW inventory check
A.3 Mechanical inspection
A.4 Wiring and termination inspection
A.5 Start-up text and general system functions
A.6 System alarm test
A.7 Hardware redundancy and diagnostic check
A.8 Visualization/operation
A.9 Test of functionality against FBD, FUP, etc.
A.10 Complex functionality and operation modes
A.11 Integration of subsystems
Annex B (informative) SAT checklist
Annex C (informative) SIT checklist
Annex D (informative) Factory acceptance test certificate
Annex E (informative) Site acceptance test certificate
Annex F (informative) Site integration test certificate
Annex G (informative) Automation system acceptance certificate
Annex H (informative) FAT punch list
Annex I (informative) SAT punch list
Annex J (informative) SIT punch list