SAC DL/T 5230 : 2009
Current
Current
The latest, up-to-date edition.
TECHNICAL GUIDE FOR ROTOR ASSEMBLY IN SITE OF HYDRO-GENERATORS
Published date
20-03-2017
Publisher
Sorry this product is not available in your region.
Defines the unit capacity of 15 MW and above the turbine generator rotor field assembly process methods, technical requirements, operation (construction) procedures and inspection standards for yoke is laminated structure of the turbine generator rotor hydropower site assembly.
| DocumentType |
Standard
|
| PublisherName |
Standardization Administration of China
|
| Status |
Current
|
Summarise
Access your standards online with a subscription
-
Simple online access to standards, technical information and regulations.
-
Critical updates of standards and customisable alerts and notifications.
-
Multi-user online standards collection: secure, flexible and cost effective.
Sorry this product is not available in your region.