• API RP 59 : 2006

    Superseded A superseded Standard is one, which is fully replaced by another Standard, which is a new edition of the same Standard.

    RECOMMENDED PRACTICE FOR WELL CONTROL OPERATIONS

    Available format(s):  Hardcopy, PDF

    Superseded date:  20-02-2021

    Language(s):  English

    Published date:  01-01-2012

    Publisher:  American Petroleum Institute

    Add To Cart

    Table of Contents - (Show below) - (Hide below)

    1 SCOPE
       1.1 Purpose
       1.2 BOP Installations
       1.3 Operations
       1.4 Furthering the Understanding of Well Control
       1.5 Deepwater
    2 REFERENCES
       2.1 Standards
       2.2 Other References
    3 GLOSSARY FOR WELL CONTROL OPERATIONS
       3.1 Definitions
       3.2 Acronyms and Abbreviations
    4 PRINCIPLES OF WELL CONTROL
       4.1 General
       4.2 Conventions
       4.3 Primary Well Control
       4.4 The Flowing Well
       4.5 Drilling or Workover Fluid
       4.6 Influx Behavior
       4.7 Formation Integrity Tests
       4.8 Well Control Pressures
       4.9 Well Close-in Procedures
       4.10 Methods For Circulating Kicks At Constant
             Bottom-Hole Pressure
       4.11 Non-Circulation Kill Methods
       4.12 Comparison of Kill Methods
       4.13 Choke Line Pressure - Subsea Stacks
       4.14 Diverter Systems Applications
       4.15 Well Control Worksheets
    5 CAUSES OF KICKS
       5.1 Conditions Necessary for a Kick
       5.2 Insufficient Hydrostatic Pressure
       5.3 Drilling Into an Adjacent Well
    6 WELL CONTROL WARNING SIGNALS
       6.1 General
       6.2 Gain in Pit Volume
       6.3 Increased Flow from Annulus
       6.4 Volume of Drilling Fluid to Keep the Hole
             Full on a Trip is Less Than Calculated or
             Less Than Trip Book Record
       6.5 Sudden Increase in Bit Penetration Rate
       6.6 Change in Pump Speed or Pressure
       6.7 Flow After Pumps Stopped
       6.8 Gas-cut Drilling Fluid
       6.9 Liquid-cut Drilling Fluid
    7 WELL PLANNING
       7.1 Introduction
       7.2 Data Availability and Gathering
       7.3 Shallow Flows
       7.4 Casing
       7.5 Cementing
       7.6 Blowout Prevention Equipment Selection
       7.7 Drilling Fluid
       7.8 Service Operations
       7.9 Kick Response Plans
       7.10 Riser Disconnect
       7.11 Simultaneous Operations
       7.12 Logistics
       7.13 Safety and Medical
       7.14 Communication
       7.15 Training and Instruction
    8 WELL CONTROL PROCEDURES FOR SURFACE DIVERTER
       INSTALLATIONS
       8.1 Purpose
       8.2 Installation of Equipment
       8.3 Diverter Operation
       8.4 Diverter Stripping Operations
    9 CONTROL PROCEDURES - SURFACE BOPS
       9.1 Pre-kick Planning
       9.2 Well Control Procedures
       9.3 Drill String Off-bottom
       9.4 High-Angle and Horizontal Well Bores
       9.5 Reference Notes For Section 9
    10 WELL CONTROL PROCEDURES FOR SUBSEA BOPS
       10.1 General
       10.2 Additional Causes of Kicks Unique to Subsea
             Operations
       10.3 Subsea Exceptions to Control Procedures
       10.4 Special Subsea Procedures
    11 WELL CONTROL PROCEDURES - RECOMMENDED RIG
       PRACTICES
       11.1 Well Control System Equipment Installation
       11.2 Well Control Equipment Installation Test
       11.3 Crew Drills
       11.4 Trip Tanks
       11.5 Gas-Cut Drilling Fluid
       11.6 Trip Book
       11.7 Pre-Kick Information
       11.8 Minimize Time Out of the Hole
       11.9 Trip Margin
       11.10 Short Trip
       11.11 Rig Practices for Handling Pressure
       11.12 Rig Practices for Pipe Handling
       11.13 Drill Stem Tests
    12 PROCEDURES FOR DEALING WITH SPECIAL PROBLEMS
       12.1 Introduction
       12.2 Pump Failure in a Kick Situation
       12.3 Excessive Casing Pressure
       12.4 Pipe Problems with a Well Kick
       12.5 Procedures for Gas Bubble Migration
       12.6 Gas Influx In Cemented Annulus
       12.7 Drill Stem Testing
       12.8 Stripping Procedures
       12.9 Bullheading and Top Kill Methods
    13 SLURRIES AND PLUGS TO DEAL WITH LOST CIRCULATION
       AND UNDERGROUND BLOWOUTS
       13.1 Introduction
       13.2 Lost Circulation
       13.3 Underground Blowouts
       13.4 Barite Plugs
       13.5 Squeeze Slurries
    APPENDIX A KICK PRESSURE AND GRADIENT CALCULATIONS
    APPENDIX B WELL CONTROL WORKSHEETS

    Abstract - (Show below) - (Hide below)

    Provides information that can serve as a voluntary industry guide for safe well control operations. Also designed to serve as a direct field aid in well control and as a technical source for teaching well control principles.

    General Product Information - (Show below) - (Hide below)

    Development Note Also available in RUSSIAN version, see API 59 RUSSIAN. (03/2012) Also available in Kazakh version, see API 59 KAZAKH. (09/2014)
    Document Type Standard
    Product Note Reconfirmed 2006
    Publisher American Petroleum Institute
    Status Superseded
    Superseded By

    Standards Referencing This Book - (Show below) - (Hide below)

    API RP 13D : 2017 RHEOLOGY AND HYDRAULICS OF OIL-WELL DRILLING FLUIDS
    API 6A : 2010 SPECIFICATION FOR WELLHEAD AND CHRISTMAS TREE EQUIPMENT
    API 10B : 1997 TESTING WELL CEMENTS
    API RP 16Q : 2017 DESIGN, SELECTION, OPERATION, AND MAINTENANCE OF MARINE DRILLING RISER SYSTEMS
    API 505 : 1997 RECOMMENDED PRACTICE FOR CLASSIFICATION OF LOCATIONS FOR ELECTRICAL INSTALLATIONS AT PETROLEUM FACILITIES CLASSIFIED AS CLASS I, ZONE 0, ZONE 1, AND ZONE 2
    API RP 13B-2 : 2014 RECOMMENDED PRACTICE FOR FIELD TESTING OF OIL-BASED DRILLING FLUIDS
    API 64 : 2017-08 DIVERTER EQUIPMENT SYSTEMS
    API 53 : 2012 BLOWOUT PREVENTION EQUIPMENT SYSTEMS FOR DRILLING WELLS
    ASTM D 1418 : 2017 : REDLINE Standard Practice for Rubber and Rubber Latices—Nomenclature
    • Access your standards online with a subscription

      Features

      • Simple online access to standards, technical information and regulations
      • Critical updates of standards and customisable alerts and notifications
      • Multi - user online standards collection: secure, flexibile and cost effective