API STD 53:2018(R2023)
Current
Current
The latest, up-to-date edition.
Well Control Equipment Systems for Drilling Wells
Available format(s)
Hardcopy , PDF
Language(s)
English
Published date
13-12-2018
Publisher
€162.50
Excluding VAT
The purpose of this standard is to provide requirements for the installation and testing of blowout prevention equipment systems on land and marine drilling rigs (barge, platform, bottom-supported, and floating).
| DocumentType |
Standard
|
| Pages |
86
|
| ProductNote |
Reconfirmed on May 2023
|
| PublisherName |
American Petroleum Institute
|
| Status |
Current
|
| Supersedes |
| API 75 : 2019 | RECOMMENDED PRACTICE FOR DEVELOPMENT OF A SAFETY AND ENVIRONMENTAL MANAGEMENT PROGRAM FOR OFFSHORE OPERATIONS AND FACILITIES |
| API 49 : 2001 : R2013 | RECOMMENDED PRACTICE FOR DRILLING AND WELL SERVICING OPERATIONS INVOLVING HYDROGEN SULFIDE |
| API RP 16ST : 2021 | Coiled Tubing Well Control Equipment Systems |
| API RP 59:2006(R2023) | Recommended Practice for Well Control Operations |
| API RP 2SK : 2005 | DESIGN AND ANALYSIS OF STATIONKEEPING SYSTEMS FOR FLOATING STRUCTURES |
| API 5L : 2004 | LINE PIPE |
Summarise
Access your standards online with a subscription
-
Simple online access to standards, technical information and regulations.
-
Critical updates of standards and customisable alerts and notifications.
-
Multi-user online standards collection: secure, flexible and cost effective.