1. SCOPE
1.1 Scope
2. REFERENCED DOCUMENTS
2.1 Government documents
2.2 Other publications
3. DEFINITIONS
3.1 Terms
4. GENERAL REQUIREMENTS
4.1 General
4.1.1 Material
4.1.2 Identification
4.2 Put-up
4.2.1 Level A put-up
4.2.2 Commercial put-up
4.3 Preservation
4.3.1 Level A preservation
4.3.1.1 Alternative level A preservation
4.3.2 Commercial preservation
4.4 Packing
4.4.1 Level A packing
4.4.1.1 Waterproofed barrier material
4.4.1.2 Bias-sewn tubing
4.4.1.3 Laminated tubing
4.4.2 Level B packing
4.4.3 Commercial packing
4.5 Marking
4.5.1 Unit packed rolls
5. DETAILED REQUIREMENTS
5.1 Responsibility for inspection
5.1.1 Responsibility for compliance
5.1.2 Certificate of compliance
5.2 Quality conformance inspection
5.2.1 Component and material inspection
5.2.1.1 Component and material certification
5.2.2 Examination of the end item for put-up,
preservation, packing, and marking
APPENDIX A
Appendix A NOTES
10. SCOPE
10.1 Scope
10.2 Acquisition requirements
10.3 Fire retardant materials
FIGURES
Figure 1 Piece ticket
Figure 2 Processing and wrapping of rolls