DOCUMENT HISTORY LOG
FOREWORD
1. SCOPE
1.1 Introduction
1.2 Purpose
1.3 Applicability
1.4 Responsibilities
2. APPLICABLE DOCUMENTS
2.1 General
2.2 Government Documents
2.3 Non-Government Documents
2.4 Order of Precedence
3. ACRONYMS AND DEFINITIONS
3.1 Acronyms
3.2 Definitions
4. REQUIREMENTS
4.1 Fracture Control Classification of Parts
4.1.1 Non-Fracture-Critical Parts
4.1.2 Fracture-Critical Parts
4.2 Methodology for Assessing Fracture-Critical
Hardware
4.2.1 Damage Tolerant Analysis
4.2.2 Damage Tolerant Testing
4.2.3 Fleet Leader Testing
4.2.4 General Damage Tolerance Requirements
4.3 Tracking for Fracture-Critical Parts
4.3.1 Materials
4.3.2 Design, Analysis, and Hardware Configuration
4.3.3 Load History
4.3.4 Flaw Screening
4.4 Fracture Control Documentation
4.4.1 Fracture Control Plan
4.4.2 Engineering Drawings
4.4.3 Fracture Control Summary Report (FCSR)
4.4.4 Presentation Summarizing the Fracture Control
Program
4.4.5 Detailed Fracture Control Analysis Report
4.4.6 Inspection Report
4.4.7 Test Report
4.4.8 Load/Use History
4.5 Verification
4.6 Alternatives
4.7 Other Requirements
5 GUIDANCE
5.1 Reference Documents