• NBN EN 61803 : 1999 AMD 1 2011

    Current The latest, up-to-date edition.

    BEPALING VAN HET VERMOGENVERLIES IN HOOGSPANNINGSGELIJKSTROOM-OMZETSTATIONS

    Available format(s): 

    Language(s): 

    Published date:  12-01-2013

    Publisher:  Belgian Standards

    Sorry this product is not available in your region.

    Add To Cart

    Table of Contents - (Show below) - (Hide below)

    1 Scope
    2 Normative references
    3 Definitions and symbols
        3.1 Definitions
        3.2 Letter symbols
    4 General
        4.1 Introduction
        4.2 Ambient conditions
              4.2.1 Outdoor standard reference temperature
              4.2.2 Coolant standard reference temperature
              4.2.3 Standard reference air pressure
        4.3 Operating parameters
    5 Determination of equipment losses
        5.1 Thyristor valve losses
              5.1.1 Thyristor conduction loss per valve
              5.1.2 Thyristor spreading loss per valve
              5.1.3 Other conduction losses per valve
              5.1.4 DC voltage-dependent loss per valve
              5.1.5 Damping loss per valve (resistor-dependent
                      term)
              5.1.6 Damping loss per valve (change of capacitor
                      energy term)
              5.1.7 Turn-off losses per valve
              5.1.8 Reactor loss per valve
              5.1.9 Total valve losses
              5.1.10 Temperature effects
              5.1.11 No-load operation loss per valve
        5.2 Converter transformer losses
              5.2.1 General
              5.2.2 No-load operation losses
              5.2.3 Operating losses
              5.2.4 Auxiliary power losses
        5.3 AC filter losses
              5.3.1 General
              5.3.2 AC filter capacitor losses
              5.3.3 AC filter reactor losses
              5.3.4 AC filter resistor losses
              5.3.5 Total a.c. filter losses
        5.4 Shunt capacitor bank losses
        5.5 Shunt reactor losses
        5.6 DC smoothing reactor losses
        5.7 DC filter losses
              5.7.1 General
              5.7.2 DC filter capacitor losses
              5.7.3 DC filter reactor losses
              5.7.4 DC filter resistor losses
              5.7.5 Total d.c. filter losses
        5.8 Auxiliaries and station service losses
        5.9 Radio interference/PLC filter losses
        5.10 Other equipment losses
    Annex A (normative) Calculation of harmonic currents and
    voltages
          A.1 Harmonic currents in converter transformers
          A.2 Harmonic currents in a.c. filters
          A.3 Harmonic voltages on the d.c. side
          A.4 DC side harmonic currents in the smoothing reactor
    Annex B (informative) Typical station losses
    Annex C (informative) Bibliography
    Annex ZA (normative) Normative references to international
    publications with their corresponding European publications

    Abstract - (Show below) - (Hide below)

    Applicable to all line-commutated high-voltage direct current (HVDC) converter stations for the use of power exchange in utility systems. Presumes the use of 12-pulse thyristor converters, but can, also be used for 6-pulse thyristor converters (to be used with due care). Gives a set of procedures for the determination of the total losses of an HVDC converter station. These procedures covers all parts, and addresses no-load operation and operating losses together with their methods of calculation which use, when possible, measured parameters.

    General Product Information - (Show below) - (Hide below)

    Document Type Standard
    Publisher Belgian Standards
    Status Current
    • Access your standards online with a subscription

      Features

      • Simple online access to standards, technical information and regulations
      • Critical updates of standards and customisable alerts and notifications
      • Multi - user online standards collection: secure, flexibile and cost effective