• ONORM EN 13231-2 : 2006

    Superseded A superseded Standard is one, which is fully replaced by another Standard, which is a new edition of the same Standard.

    RAILWAY APPLICATIONS - TRACK - ACCEPTANCE OF WORKS - PART 2: WORKS ON BALLASTED TRACK - SWITCHES AND CROSSINGS

    Available format(s): 

    Superseded date:  15-07-2013

    Language(s): 

    Published date:  12-01-2013

    Publisher:  Osterreichisches Normungsinstitut/Austrian Standards

    Sorry this product is not available in your region.

    Add To Cart

    Table of Contents - (Show below) - (Hide below)

    Foreword
    1 Scope
    2 Normative references
    3 Terms and definitions
    4 Acceptance of works on switches and crossings
      4.1 General
      4.2 Acceptance deadlines
      4.3 Acceptance measurements and checks
      4.4 Acceptance documents
      4.5 Relative track geometry
          4.5.1 Tolerances
          4.5.2 Parameters
      4.6 Absolute track position
          4.6.1 Tolerances for absolute vertical position of
                 the track
          4.6.2 Tolerances for absolute lateral position of
                 the track
      4.7 Other parameters and verifications
          4.7.1 Check rail to check rail gauge
          4.7.2 Squareness of switches
          4.7.3 Longitudinal relationship of switch tip to
                 stock rail
          4.7.4 Longitudinal position of the switch and
                 crossing to the design position
          4.7.5 Absolute vertical position of the switch and
                 crossing layout
          4.7.6 Absolute lateral position of the switch and
                 crossing layout
          4.7.7 Check of the lead offsets
          4.7.8 Bearer position
          4.7.9 Voiding of bearers
          4.7.10 Fasteners
          4.7.11 Welds
          4.7.12 Fishplated joints
          4.7.13 Insulated joints
          4.7.14 Functional check
          4.7.15 Expansion devices
      4.8 Acceptance responsibilities and acceptance form
      4.9 Warranty
    Annex A (informative) Acceptance responsibilities
    Annex B (informative) Example of an acceptance form

    Abstract - (Show below) - (Hide below)

    Specifies the requirements and tolerances for the acceptance of track work associated with switch and crossing layouts (also includes work on expansion devices) on ballasted track for 1435 mm and wider gauge railways.

    General Product Information - (Show below) - (Hide below)

    Document Type Standard
    Publisher Osterreichisches Normungsinstitut/Austrian Standards
    Status Superseded
    Superseded By

    Standards Referencing This Book - (Show below) - (Hide below)

    EN 13232-9:2006+A1:2011 Railway applications - Track - Switches and crossings - Part 9: Layouts
    EN 13848-2:2006 RAILWAY APPLICATIONS - TRACK - TRACK GEOMETRY QUALITY - PART 2: MEASURING SYSTEMS - TRACK RECORDING VEHICLES
    EN 13848-1:2003+A1:2008 Railway applications - Track - Track geometry quality - Part 1: Characterisation of track geometry
    EN 14730-2 : 2006 RAILWAY APPLICATIONS - TRACK - ALUMINOTHERMIC WELDING OF RAILS - PART 2: QUALIFICATION OF ALUMINOTHERMIC WELDERS, APPROVAL OF CONTRACTORS AND ACCEPTANCE OF WELDS
    EN 14730-1:2017 Railway applications - Track - Aluminothermic welding of rails - Part 1: Approval of welding processes
    • Access your standards online with a subscription

      Features

      • Simple online access to standards, technical information and regulations
      • Critical updates of standards and customisable alerts and notifications
      • Multi - user online standards collection: secure, flexibile and cost effective