Foreword
1 Scope
2 Normative references
3 Definitions and abbreviation
3.1 Definitions
3.1.1 additive
3.1.2 admixture
3.1.3 AR glass-fibre (alkali-resistant)
3.1.4 E glass-fibre (electrical)
3.1.5 basic strand
3.1.6 glass-fibre reinforced cement
3.1.7 matrix
3.1.8 spray process
3.1.9 premix process
3.1.10 Quality Assurance Manual (QAM)
3.1.11 Quality Assurance Plan (QAP)
3.1.12 control plan
3.2 Abbreviation
4 Control of raw material
4.1 General
4.2 Reception controls
4.3 Storage of raw materials
5 Control of the mixing process
6 Controls of hardened and fresh GRCl
Annex A (normative) Guidelines for establishment of the
manufacture control plan
Annex B (informative) Bibliography