Intellectual Property Rights
Foreword
Introduction
1 Scope
2 References
2.1 Normative references
2.2 Informative references
3 Abbreviations
4 General Test Conditions, Traffic Generation and Traffic
Monitoring
4.1 Coupling and Decoupling of the PLC-Signal
4.2 Shielding of the Test Set-up
5 Tests with one PLT system
5.1 CDCF Timing - Comparison with Simulation Model
5.2 CDCF - PSD
5.3 CDCF Timing - Sync Point and AC line cycle
5.4 CDCF Timing - Burst
6 Tests with more PLT systems
6.1 CDCF reception in dependence of attenuation
6.2 CDCF reception in the presence of a narrowband
disturbance source
6.3 CDCF reception in the presence of a broadband
disturbance source
6.4 Coexistence - Slot allocation
6.5 Coexistence - Frequency allocation
6.6 System Join Process
6.7 Throughput
6.8 Hidden Node Situation
History