1 Scope
2 Normative references
3 Definitions
4 General requirements
5 Management responsibility
5.1 Measurement control system
5.2 Customer requirements
5.3 Quality objectives
5.4 Management responsibility
6 Resource management
6.1 Human resources
6.1.1 Assignment of personnel
6.1.2 Competence and training
6.2 Information resources
6.2.1 Procedures
6.2.2 Software
6.2.3 Records
6.2.4 Identification
6.3 Material resources
6.3.1 Measuring equipment
6.3.2 Storage and handling of measuring
equipment
6.3.4 Measurement standards and reference
materials
6.4 Outside suppliers
7 Measurement control system realisation
7.1 Metrological confirmation process of measuring
equipment
7.1.1 Metrological confirmation
7.1.2 Confirmation intervals
7.1.3 Equipment information
7.1.4 Equipment access sealing
7.1.5 Confirmation process records
7.2 Measurement process
7.2.1 Process design and planning
7.2.2 Process realisation
7.2.3 Nonconforming equipment
7.2.4 Records of control of measurement processes
7.3 Measurement realisation
7.3.1 Measurement uncertainty
7.3.2 Traceability
8 Measurement control system analysis and improvement
8.1 Periodic audit
8.2 Monitoring of measurement processes
8.2.1 Data analysis for control of measurement
processes
8.2.3 Failure of a measurement process
8.3 Improvement
Annex A (Informative) Metrological confirmation
process overview
Annex B (Informative) Measurement process control
overview
Annex C (Informative) Bibliography