• Shopping Cart
    There are no items in your cart

01/708298 DC : DRAFT MAY 2001

Withdrawn

Withdrawn

A Withdrawn Standard is one, which is removed from sale, and its unique number can no longer be used. The Standard can be withdrawn and not replaced, or it can be withdrawn and replaced by a Standard with a different number.

ISO/DIS 13679.2 - PETROLEUM AND NATURAL GAS INDUSTRIES - TESTING PROCEDURES FOR CASING AND TUBING CONNECTIONS

Withdrawn date

23-07-2013

Published date

23-11-2012

Sorry this product is not available in your region.

1 Scope
2 Normative references
3 Terms, definitions, symbols and abbreviated terms
   3.1 Terms and definitions
   3.2 Symbols and abbreviated terms
4 General requirements
   4.1 Connection geometry, service load envelope and
       performance data sheet
   4.2 Quality control
5 General test requirements
   5.1 Test classes
   5.2 Test matrix
   5.3 Testing program
   5.4 Calibration and accreditation requirements
   5.5 Rehearsal tests
   5.6 Material property tests
   5.7 Make-up/break-out procedures
   5.8 Internal pressure leak detection
   5.9 Internal pressure leak trap device
   5.10 External pressure leak detection
   5.11 Data acquisition and test methods
   5.12 Thermal cycling tests
6 Connection test specimen preparation
   6.1 General connection test objectives
   6.2 Connection test specimen identification, and
       marking
   6.3 Connection test specimen preparation
   6.4 Connection test specimen machining
   6.5 Machining tolerances
   6.6 Tolerance limits on machining objectives
   6.7 Grooved torque shoulder
7 Test procedures
   7.1 General
   7.2 Make-up/break-out tests
   7.3 Service load envelope tests
   7.4 Limit loads tests
   7.5 Limit load test path (see Figures 18 and 19)
8 Acceptance criteria
   8.1 Make-up and break-out tests
   8.2 Service load envelope tests
   8.3 Limit loads tests
9 Test reports
Annex A (normative) Connection geometry and performance
        data sheet
      A.1 General
      A.2 Connection geometry and performance property
          data
      A.3 Diagram
      A.4 Connection manufacturing specification
      A.5 Make-up parameters
      A.6 Connection repair
      A.7 Performance properties
      A.8 Connection application level
      A.9 Service load envelope
      A.10 Limit loads
Annex B (informative) Connection service load envelope
        and limit loads
      B.1 General
      B.2 Basic principles
      B.3 Performance properties and dimensions
          required for the calculation of the elastic
          service load envelope
      B.4 Requirements
      B.5 Calculation of the service load envelopes
      B.6 Implementation
Annex C (normative) Data forma
Annex D (normative) Connection testing full report
      D.1 General information
      D.2 Specimen preparation information
          (include Table C.1)
      D.3 Make-up break-out information
          (include Tables C.2 and C.3)
      D.4 Service load envelope tests
          include Table C.4)
      D.5 Load limit envelope tests
          (include Table C.5)
      D.6 Omissions and deviations
      D.7 Additional tests
Annex E (normative) Connection testing summary report
      E.1 General
      E.2 General information
      E.3 Introduction
      E.4 Description of the connection
      E.5 Specimen preparation
      E.6 Make-up/break-out tests
      E.7 Service load envelope tests
      E.8 Limit load tests
Annex F (informative) Frame load range determination
Annex G (informative) Interpolation and extrapolation
        considerations
      G.1 General
      G.2 Product line
      G.3 Testing
      G.4 Analysis
Annex H (informative) Special application exclusions
      H.1 General
      H.2 Specialized service conditions
      H.3 Testing aspects for various special
          applications
Annex I (informative) Commentary - Design basis of
        ISO 13679
      I.1 General
      I.2 Background (See Introduction)
      I.3 Retention and dissemination of test data
          (see Annexes D and E)
      I.4 General test requirements (See clause 5)
      I.5 Calibration requirements (See 5.1)
      I.6 Material property tests (See 5.3 and 5.6)
      I.7 Make-up and break-out procedures (see 5.4)
      I.8 Internal pressure leak detection (See 5.5)
      I.9 Data acquisition and test methods (See 5.7)
      I.10 Thermal cycling tests (See 5.8)
      I.11 Test specimen preparation (See 6)
      I.12 Test procedures (See 7)
Annex J (normative) Independent seal testing of
        connections with metal to metal and resilient
        seals
      J.1 General
      J.2 Test Matrix
      J.3 Make-Breaks
      J.4 Porting procedures (See Figure J-2)
Bibliography

Committee
PSE/17
DocumentType
Draft
PublisherName
British Standards Institution
Status
Withdrawn

ISO 13680:2010 Petroleum and natural gas industries Corrosion-resistant alloy seamless tubes for use as casing, tubing and coupling stock Technical delivery conditions
ISO 10400:1993 Petroleum and natural gas industries — Formulae and calculation for casing, tubing, drill pipe and line pipe properties
ISO 3183:2012 Petroleum and natural gas industries Steel pipe for pipeline transportation systems
ISO 22:1991 Belt drives Flat transmission belts and corresponding pulleys Dimensions and tolerances
ISO 13678:2010 Petroleum and natural gas industries Evaluation and testing of thread compounds for use with casing, tubing, line pipe and drill stem elements
ISO 10422:1993 Petroleum and natural gas industries — Threading, gauging, and thread inspection of casing, tubing and line pipe threads — Specification
ISO 11960:2014 Petroleum and natural gas industries Steel pipes for use as casing or tubing for wells

Access your standards online with a subscription

Features

  • Simple online access to standards, technical information and regulations.

  • Critical updates of standards and customisable alerts and notifications.

  • Multi-user online standards collection: secure, flexible and cost effective.