IEC 60255-21-2:1988
|
Electrical relays - Part 21: Vibration, shock, bump and seismic tests on measuring relays and protection equipment - Section Two: Shock and bump tests |
IEC 60255-22-1:2007
|
Measuring relays and protection equipment - Part 22-1: Electrical disturbance tests - 1 MHz burst immunity tests |
IEC 61850-5:2013
|
Communication networks and systems for power utility automation - Part 5: Communication requirements for functions and device models |
IEC 61850-7-2:2010
|
Communication networks and systems for power utility automation - Part 7-2: Basic information and communication structure - Abstract communication service interface (ACSI) |
ISO/IEC 9646-7:1995
|
Information technology Open Systems Interconnection Conformance testing methodology and framework Part 7: Implementation Conformance Statements |
IEC 61850-9-1:2003
|
Communication networks and systems in substations - Part 9-1: Specific Communication Service Mapping (SCSM) - Sampled values over serial unidirectional multidrop point to point link |
IEC 61175:2005
|
Industrial systems, installations and equipment and industrial products - Designation of signals |
IEC 61850-6:2009
|
Communication networks and systems for power utility automation - Part 6: Configuration description language for communication in electrical substations related to IEDs |
ISO/IEC 9646-6:1994
|
Information technology Open Systems Interconnection Conformance testing methodology and framework Part 6: Protocol profile test specification |
ISO/IEC 9646-2:1994
|
Information technology Open Systems Interconnection Conformance testing methodology and framework Part 2: Abstract Test Suite specification |
EN ISO 9002:1994/AC:1997
|
QUALITY SYSTEMS - SPECIFICATION FOR PRODUCTION AND INSTALLATION |
EN ISO 9003:1994/AC:1997
|
QUALITY SYSTEMS - SPECIFICATION FOR FINAL INSPECTION AND TEST |
ISO/IEC 9646-4:1994
|
Information technology Open Systems Interconnection Conformance testing methodology and framework Part 4: Test realization |
ISO/IEC 9646-5:1994
|
Information technology Open Systems Interconnection Conformance testing methodology and framework Part 5: Requirements on test laboratories and clients for the conformance assessment process |
IEC 61850-7-1:2011
|
Communication networks and systems for power utility automation - Part 7-1: Basic communication structure - Principles and models |
IEC 61850-8-1:2011
|
Communication networks and systems for power utility automation - Part 8-1: Specific communication service mapping (SCSM) - Mappings to MMS (ISO 9506-1 and ISO 9506-2) and to ISO/IEC 8802-3 |
EN ISO 9001:2015
|
Quality management systems - Requirements (ISO 9001:2015) |
ISO 9004:2009
|
Managing for the sustained success of an organization A quality management approach |
IEC 61850-9-2:2011
|
Communication networks and systems for power utility automation - Part 9-2: Specific communication service mapping (SCSM) - Sampled values over ISO/IEC 8802-3 |
IEC 61850-4:2011
|
Communication networks and systems for power utility automation - Part 4: System and project management |
IEC 60848:2013
|
GRAFCET specification language for sequential function charts |
IEC 60255-5:2000
|
Electrical Relays - Part 5: Insulation coordination for measuring relays and protection equipment - Requirements and tests |
IEEE C37.90.1-2012 REDLINE
|
IEEE Standard for Surge Withstand Capability (SWC) Tests for Relays and Relay Systems Associated with Electric Power Apparatus |
IEC 60255-21-1:1988
|
Electrical relays - Part 21: Vibration, shock, bump and seismic tests on measuring relays and protection equipment - Section One: Vibration tests (sinusoidal) |
IEC 61850-7-4:2010
|
Communication networks and systems for power utility automation - Part 7-4: Basic communication structure - Compatible logical node classes and data object classes |
ISO/IEC 9646-1:1994
|
Information technology Open Systems Interconnection Conformance testing methodology and framework Part 1: General concepts |
ISO 9003:1994
|
Quality systems Model for quality assurance in final inspection and test |
IEC 61850-7-3:2010
|
Communication networks and systems for power utility automation - Part 7-3: Basic communication structure - Common data classes |
IEC 60870-5-3:1992
|
Telecontrol equipment and systems - Part 5: Transmission protocols - Section 3: General structure of application data |
ISO 9000-1:1994
|
Quality management and quality assurance standards — Part 1: Guidelines for selection and use |
IEC 61850-3:2013
|
Communication networks and systems for power utility automation - Part 3: General requirements |
IEC 60068-2-30:2005
|
Environmental testing - Part 2-30: Tests - Test Db: Damp heat, cyclic (12 h + 12 h cycle) |