10260-5
Current
The latest, up-to-date edition.
Safe Work Method Statement - Mobile Plant (Street Sweeper) SWMS 10260-5
Word
English
01-09-2020
Mobile Plant (Street Sweeper) SWMS - written by SafetyCulture Pty Ltd. It is a Word DOC, not a PDF so you can add logos, change colours and add or delete information as needed. It contains commonly encountered safety aspects and is not a blank template. You should add your company details, ABN and include your site specific details or risks to make it specific to the job at hand. You can then print it for incorporation into your overall OHS system, as well for inductions, toolbox talks or tender applications. Note you will require MS Word to use this template.
| DocumentType |
Misc Product
|
| Pages |
8
|
| ProductNote |
It is a Word DOC, not a PDF so you can add logos, change colours and add or delete information as needed. It contains commonly encountered safety aspects and is not a blank template.
You should add your company details, ABN and include your site specific details or risks to make it specific to the job at hand. You can then print it for incorporation into your overall OHS system, as well for inductions, toolbox talks or tender applications. Note you will require MS Word to use this template. |
| PublisherName |
SafetyCulture Pty Ltd
|
| Status |
Current
|
| SupersededBy |
Job Steps Covered in Mobile Plant (Street Sweeper) SWMS: (includes potential hazards and control measures) Planning Working Alone Vehicle Operation & Street Sweeping Obtaining Water from a Hydrant or another Water Source (e.g. creek/dam) Environment Housekeeping Manual Tasks Refuelling On Completion Emergency Response
Version 5