• Shopping Cart
    There are no items in your cart

10494-4

Current

Current

The latest, up-to-date edition.

Concrete Pile Removal Safe Work Method Statement

Available format(s)

Word

Language(s)

English

Published date

30-05-2023

This Concrete Pile Removal Safe Work Method Statement (SWMS) provides a way for your business to outline how to safely remove concrete pile.

DocumentType
Misc Product
Pages
11
ProductNote
This is the 'Concrete Pile Removal' Safe Work Method Statement (SWMS), written by SafetyDocs by SafetyCulture Pty Ltd.

It is a Word DOC, not a PDF so you can add logos, change colours and add or delete information as needed. It contains commonly encountered safety aspects and is not a blank template.

You should add your company details. You can then print it for incorporation into your overall OHS system, as well for inductions, toolbox talks or tender applications.

Note you will require MS Word to use this template.
PublisherName
SafetyCulture Pty Ltd
Status
Current
Supersedes

This Concrete Pile Removal Safe Work Method Statement (SWMS) covers hazards and controls associated with the removal of piles using an excavator with a pile cropper, concrete saw, jackhammer and grinder.

This SWMS covers High-Risk Construction Work (HRCW) controls related to:

Mobile plant movement
Pressurised gas distribution mains or piping chemical, fuel or refrigerant lines energised electrical installations or services
Work in an area that may have a contaminated or flammable atmosphere
Additional controls are included for Electrical Equipment, Elevated Levels, Slips, Trips & Falls, Hazardous Substances, Hot Work, Hazardous Manual Tasks, Outdoor Work & Environmental Considerations.

Job Steps Covered in Concrete Pile Removal SWMS:
(includes potential hazards and control measures)

Planning
Working Outdoors
Arrival On-site & Assess On-site Conditions
Work Area Set-up
Environment
Housekeeping
Manual Tasks
Exposing the Pile using an Excavator
Hazardous Substance/Chemical Use
Removing the Pile using a Pile Cropper
Cutting & Removing the Pile & Reo Bar using a Concrete Saw, Jackhammer & Grinder
Removing Spoil/Debris
On Completion
Emergency Response

Version 2

Access your standards online with a subscription

  • Simple online access to standards, technical information and regulations.

  • Critical updates of standards and customisable alerts and notifications.

  • Multi-user online standards collection: secure, flexible and cost effective.