10646-2
Current
The latest, up-to-date edition.
Plumbing Electrical Safety Safe Work Method Statement
Word
English
30-05-2023
This Plumbing Electrical Safety Safe Work Method Statement (SWMS) provides a way for your business to outline how to ensure Plumbing Electrical Safety.
| DocumentType |
Misc Product
|
| Pages |
11
|
| ProductNote |
This is the 'Plumbing Electrical Safety' Safe Work Method Statement (SWMS), written by SafetyDocs by SafetyCulture Pty Ltd.
It is a Word DOC, not a PDF so you can add logos, change colours and add or delete information as needed. It contains commonly encountered safety aspects and is not a blank template. You should add your company details. You can then print it for incorporation into your overall OHS system, as well for inductions, toolbox talks or tender applications. Note you will require MS Word to use this template. |
| PublisherName |
SafetyCulture Pty Ltd
|
| Status |
Current
|
| Supersedes |
This Plumbing Electrical Safety Safe Work Method Statement (SWMS) outlines general electrical hazards associated with plumbing work, including overhead and underground electrical service hazards, electrical supply faults, disconnecting hot water services, cutting or disconnect a metallic water pipe, changing water meters and disconnecting the main earth wire from a water pipe.
This SWMS covers High-Risk Construction Work (HRCW) controls related to:
Pressurised gas distribution mains or piping chemical, fuel or refrigerant lines energised electrical installations or services
Work in an area that may have a contaminated or flammable atmosphere
Additional controls are included for Electrical Equipment, Hot Work, Silica Dust & Environmental Considerations.
Job Steps Covered in Plumbing Electrical Safety SWMS:
(includes potential hazards & control measures).
Provide Training on Electrical Hazards associated with Plumbing Work
Provide Training on the Health Effects associated with Respirable Crystalline Silica Dust
Arrival On-site & Assess On-site Conditions
Working Outdoors
Work Area Set-up
Overhead Electrical Hazards
Excavation Work
Working with Power Tools
Cut or Disconnect a Metallic Water Pipe, Disconnect a Metallic Hot Water Service, Remove a Water Meter, Disconnect the main Earth Wire from a Water Pipe
Welding, Soldering
Fitting Appliances & Fixtures
Commission System
On Completion
Emergency Response if Co-worker Suffers Electric Shock
Version 1
Access your standards online with a subscription
-
Simple online access to standards, technical information and regulations.
-
Critical updates of standards and customisable alerts and notifications.
-
Multi-user online standards collection: secure, flexible and cost effective.