• Shopping Cart
    There are no items in your cart

12/30267005 DC : 0

Superseded

Superseded

A superseded Standard is one, which is fully replaced by another Standard, which is a new edition of the same Standard.

View Superseded by

BS IEC 60076-19 TS ED.1 - POWER TRANSFORMERS - PART 19: RULES FOR THE DETERMINATION OF UNCERTAINTIES IN THE MEASUREMENT OF THE LOSSES ON POWER TRANSFORMERS AND REACTORS

Available format(s)

Hardcopy , PDF

Superseded date

30-04-2013

Language(s)

English

€23.37
Excluding VAT

1 Scope
2 Normative references
3 Terms and definitions
4 Symbols
5 Power measurement, systematic deviation and
   uncertainty
6 Procedures for no-load loss measurement
7 Procedures for load loss measurement
8 Three-phase calculations
9 Reporting
10 Estimate of corrections and uncertainty
   contributions
Annex A (Informative) - Example of load loss
        uncertainty evaluation for a large power
        transformer
Annex B (Informative) - Example of load loss
        uncertainty evaluation for a distribution
        transformer

BS IEC 60076-19 TS Ed.1

Committee
PEL/14
DocumentType
Draft
Pages
37
PublisherName
British Standards Institution
Status
Superseded
SupersededBy

IEC 60076-1:2011 Power transformers - Part 1: General
IEC 60076-2:2011 Power transformers - Part 2: Temperature rise for liquid-immersed transformers
ISO/IEC Guide 98-3:2008 Uncertainty of measurement — Part 3: Guide to the expression of uncertainty in measurement (GUM:1995)

Access your standards online with a subscription

Features

  • Simple online access to standards, technical information and regulations.

  • Critical updates of standards and customisable alerts and notifications.

  • Multi-user online standards collection: secure, flexible and cost effective.