12/30267005 DC : 0
Superseded
A superseded Standard is one, which is fully replaced by another Standard, which is a new edition of the same Standard.
View Superseded by
BS IEC 60076-19 TS ED.1 - POWER TRANSFORMERS - PART 19: RULES FOR THE DETERMINATION OF UNCERTAINTIES IN THE MEASUREMENT OF THE LOSSES ON POWER TRANSFORMERS AND REACTORS
Hardcopy , PDF
30-04-2013
English
1 Scope
2 Normative references
3 Terms and definitions
4 Symbols
5 Power measurement, systematic deviation and
uncertainty
6 Procedures for no-load loss measurement
7 Procedures for load loss measurement
8 Three-phase calculations
9 Reporting
10 Estimate of corrections and uncertainty
contributions
Annex A (Informative) - Example of load loss
uncertainty evaluation for a large power
transformer
Annex B (Informative) - Example of load loss
uncertainty evaluation for a distribution
transformer
BS IEC 60076-19 TS Ed.1
Committee |
PEL/14
|
DocumentType |
Draft
|
Pages |
37
|
PublisherName |
British Standards Institution
|
Status |
Superseded
|
SupersededBy |
IEC 60076-1:2011 | Power transformers - Part 1: General |
IEC 60076-2:2011 | Power transformers - Part 2: Temperature rise for liquid-immersed transformers |
ISO/IEC Guide 98-3:2008 | Uncertainty of measurement — Part 3: Guide to the expression of uncertainty in measurement (GUM:1995) |
Access your standards online with a subscription
Features
-
Simple online access to standards, technical information and regulations.
-
Critical updates of standards and customisable alerts and notifications.
-
Multi-user online standards collection: secure, flexible and cost effective.