13/30259247 DC : 0
Superseded
A superseded Standard is one, which is fully replaced by another Standard, which is a new edition of the same Standard.
BS 6349-3 - MARITIME WORKS - PART 3: CODE OF PRACTICE FOR THE DESIGN OF SHIPYARDS AND SEA LOCKS
Hardcopy , PDF
31-12-2013
English
Foreword
1 Scope
2 Normative references
3 Terms, definitions and abbreviations
4 Shipyard layout
5 Dry docks
6 Shipyard quays, piers and dolphins
7 Slipways and shipbuilding berths
8 Shiplift facilities
9 Floating docks
10 Sea locks
11 Hydrolifts
12 Dock and lock gates
13 Piped services and electrical distribution systems
14 Control systems
Bibliography
BS 6349-3
Committee |
CB/502
|
DocumentType |
Draft
|
Pages |
125
|
PublisherName |
British Standards Institution
|
Status |
Superseded
|
BS 6349-8:2007 | Maritime structures Code of practice for the design of Ro-Ro ramps, linkspans and walkways |
BS 6349-6:1989 | Maritime structures Design of inshore moorings and floating structures |
BS EN 1991-1-4 : 2005 | EUROCODE 1: ACTIONS ON STRUCTURES - PART 1-4: GENERAL ACTIONS - WIND ACTIONS |
BS 6349-7:1991 | Maritime structures Guide to the design and construction of breakwaters |
BS 6349-1-4:2013 | Maritime works General. Code of practice for materials |
BS 6349-5:1991 | Maritime structures Code of practice for dredging and land reclamation |
BS 6349-1-3:2012 | Maritime works General. Code of practice for geotechnical design |
Access your standards online with a subscription
Features
-
Simple online access to standards, technical information and regulations.
-
Critical updates of standards and customisable alerts and notifications.
-
Multi-user online standards collection: secure, flexible and cost effective.