14/30258524 DC : 0
Superseded
A superseded Standard is one, which is fully replaced by another Standard, which is a new edition of the same Standard.
View Superseded by
BS EN 13848-5 - RAILWAY APPLICATIONS - TRACK - TRACK GEOMETRY QUALITY - PART 5: GEOMETRIC QUALITY LEVELS - PLAIN LINE, SWITCHES AND CROSSINGS
Hardcopy , PDF
English
30-09-2017
Foreword
1 Scope
2 Normative references
3 Terms and definitions
4 Symbols and abbreviations
5 Background
6 Overview
7 Assessment of track geometry quality
8 Immediate action limits
9 Alert and intervention limit
Annex A (informative) - Relative importance of the various
parameters
Annex B (informative) - Alert and intervention limits
Annex C (informative) - Twist limits for nominal track gauge wider
than 1435 mm
Annex D (informative) - A-deviations
Annex ZA (informative) - Relationship between this European Standard
and the essential requirements of EU Directive 2008/57/EC
Bibliography
BS EN 13848-5.
| Committee |
RAE/2
|
| DocumentType |
Draft
|
| Pages |
25
|
| PublisherName |
British Standards Institution
|
| Status |
Superseded
|
| SupersededBy |
| Standards | Relationship |
| PREN 13848-5 : DRAFT 2014 | Identical |
| EN 13231-1:2013 | Railway applications - Track - Acceptance of works - Part 1: Works on ballasted track - Plain line, switches and crossings |
| EN 14363:2016 | Railway applications - Testing and Simulation for the acceptance of running characteristics of railway vehicles - Running Behaviour and stationary tests |
| EN 13848-2:2006 | Railway applications - Track - Track geometry quality - Part 2: Measuring systems - Track recording vehicles |
| EN 13848-1:2003+A1:2008 | Railway applications - Track - Track geometry quality - Part 1: Characterisation of track geometry |
| EN 13848-4:2011 | Railway applications - Track - Track geometry quality - Part 4: Measuring systems - Manual and lightweight devices |
| EN 13803-1:2010 | Railway applications - Track - Track alignment design parameters - Track gauges 1435 mm and wider - Part 1: Plain line |
| EN 13848-6:2014 | Railway applications - Track - Track geometry quality - Part 6: Characterisation of track geometry quality |
| EN 13848-3:2009 | Railway applications - Track - Track geometry quality - Part 3: Measuring systems - Track construction and maintenance machines |
Access your standards online with a subscription
-
Simple online access to standards, technical information and regulations.
-
Critical updates of standards and customisable alerts and notifications.
-
Multi-user online standards collection: secure, flexible and cost effective.