• Shopping Cart
    There are no items in your cart

15/30298379 DC : 0

Superseded

Superseded

A superseded Standard is one, which is fully replaced by another Standard, which is a new edition of the same Standard.

View Superseded by

BS EN 60965 ED 3.0 - NUCLEAR POWER PLANTS - CONTROL ROOMS - SUPPLEMENTARY CONTROL ROOM FOR REACTOR SHUTDOWN WITHOUT ACCESS TO THE MAIN CONTROL ROOM

Available format(s)

Hardcopy , PDF

Language(s)

English

Superseded date

30-09-2016

Superseded by

BS EN 60965:2016

€22.71
Excluding VAT
Summarise this standard

FOREWORD
INTRODUCTION
1 Scope
2 Normative references
3 Terms and definitions
4 Abbreviations
5 Design Principles
6 Design process
7 Functional design
8 System verification and validation
Annex A (informative) - Assessment of Safe Transfer
        Time Window
Bibliography

BS EN 60965 Ed 3.0.

Committee
NCE/8
DocumentType
Draft
Pages
23
PublisherName
British Standards Institution
Status
Superseded
SupersededBy

⚠

A newer version of this standard is available.

View Current Edition
€22.71
Excluding VAT