15/30327592 DC : 0
NA
Status of Standard is Unknown
BS EN 9145 - AEROSPACE SERIES - REQUIREMENTS FOR ADVANCED PRODUCT QUALITY PLANNING AND PRODUCTION - PART APPROVAL PROCESS
Hardcopy , PDF
English
RATIONALE
FOREWORD
INTRODUCTION
1. SCOPE
2. APPLICABLE DOCUMENTS
3. TERMS AND DEFINITIONS
4. ADVANCED PRODUCT QUALITY
PLANNING REQUIREMENTS
5. PRODUCTION PART APPROVAL
PROCESS REQUIREMENTS
6. NOTES
APPENDIX A - ACRONYM LOG
APPENDIX B - ADVANCED PRODUCT
QUALITY PRODUCT PHASE
ACTIVITIES, DELIVERABLES,
AND OUTPUTS
APPENDIX C - CONTROL PLAN
APPENDIX D - PRODUCTION PART APPROVAL
PROCESS APPROVAL FORM
BS EN 9145.
Committee |
ACE/1
|
DocumentType |
Draft
|
Pages |
37
|
PublisherName |
British Standards Institution
|
Status |
NA
|
PREN 9110 : 200P4 | QUALITY MANAGEMENT SYSTEMS - REQUIREMENTS FOR AVIATION MAINTENANCE ORGANIZATIONS |
PREN 9103 : 200P2 | AEROSPACE SERIES - QUALITY MANAGEMENT SYSTEMS - VARIATION MANAGEMENT OF KEY CHARACTERISTICS |
ISO/IEC 15288:2008 | Systems and software engineering — System life cycle processes |
PREN 9100 : 200P4 | QUALITY MANAGEMENT SYSTEMS - REQUIREMENTS FOR AVIATION, SPACE AND DEFENCE ORGANIZATIONS |
SAE J 1739 : 2009 | POTENTIAL FAILURE MODE AND EFFECTS ANALYSIS IN DESIGN (DESIGN FMEA), POTENTIAL FAILURE MODE AND EFFECTS ANALYSIS IN MANUFACTURING AND ASSEMBLY PROCESSES (PROCESS FMEA) |
IEEE 1490:2011 | IEEE GUIDE - ADOPTION OF THE PROJECT MANAGEMENT INSTITUTE STANDARD - A GUIDE TO THE PROJECT MANAGEMENT BODY OF KNOWLEDGE |
ISO 9000:2015 | Quality management systems — Fundamentals and vocabulary |
PREN 9102 : 200P3 | AEROSPACE SERIES - QUALITY SYSTEMS - FIRST ARTICLE INSPECTION REQUIREMENT |
ASTM E 2782 : 2017 : REDLINE | Standard Guide for Measurement Systems Analysis (MSA) |
Access your standards online with a subscription
Features
-
Simple online access to standards, technical information and regulations.
-
Critical updates of standards and customisable alerts and notifications.
-
Multi-user online standards collection: secure, flexible and cost effective.