92/42/EEC : 1992 AMD 5 2013
Current
Current
The latest, up-to-date edition.
COUNCIL DIRECTIVE 92/42/EEC OF 21 MAY 1992 ON EFFICIENCY REQUIREMENTS FOR NEW HOT-WATER BOILERS FIRED WITH LIQUID OR GASEOUS FUELS
Available format(s)
Hardcopy
Language(s)
English
Published date
26-09-2013
Publisher
DocumentType |
Miscellaneous Product
|
Pages |
9
|
PublisherName |
European Union
|
Status |
Current
|
DIN EN 16214-4:2013-04 | SUSTAINABILITY CRITERIA FOR THE PRODUCTION OF BIOFUELS AND BIOLIQUIDS FOR ENERGY APPLICATIONS - PRINCIPLES, CRITERIA, INDICATORS AND VERIFIERS - PART 4: CALCULATION METHODS OF THE GREENHOUSE GAS EMISSION BALANCE USING A LIFE CYCLE ANALYSIS APPROACH |
BS EN 15316-4-7:2008 | Heating systems in buildings. Method for calculation of system energy requirements and system efficiencies Space heating generation systems, biomass combustion systems |
BS EN 15420:2010 | Gas-fired central heating boilers. Type C boilers of nominal heat input exceeding 70 kW, but not exceeding 1000 kW |
12/30256100 DC : 0 | BS EN 12878 - PIGMENTS FOR THE COLOURING OF BUILDING MATERIALS BASED ON CEMENT AND/OR LIME - SPECIFICATIONS AND METHODS OF TEST |
UNI TS 11300-2 : 2014 | ENERGY PERFORMANCE OF BUILDINGS - PART 2: EVALUATION OF PRIMARY ENERGY NEED AND OF SYSTEM EFFICIENCIES FOR SPACE HEATING, DOMESTIC HOT WATER PRODUCTION, VENTILATION AND LIGHTING FOR NON-RESIDENTIAL BUILDINGS |
PREN 15316-4-1 : DRAFT 2014 | HEATING SYSTEMS AND WATER BASED COOLING SYSTEMS IN BUILDINGS - METHOD FOR CALCULATION OF SYSTEM ENERGY REQUIREMENTS AND SYSTEM EFFICIENCIES - PART 4-1: SPACE HEATING AND DHW GENERATION SYSTEMS, COMBUSTION SYSTEMS (BOILERS, BIOMASS) |
05/30128013 DC : DRAFT JULY 2005 | BS 5655-12 - LIFTS AND SERVICE LIFTS - PART 12: CODE OF PRACTICE FOR THE UNDERTAKING OF MODIFICATIONS TO EXISTING HYDRAULIC LIFTS |
CSA P.10 : 2007 : R2012 | PERFORMANCE OF INTEGRATED MECHANICAL SYSTEMS FOR RESIDENTIAL HEATING AND VENTILATION |
UNI EN 15316-4-7 : 2009 | HEATING SYSTEMS IN BUILDINGS - METHOD FOR CALCULATION OF SYSTEM ENERGY REQUIREMENTS AND SYSTEM EFFICIENCIES - PART 4-7: SPACE HEATING GENERATION SYSTEMS, BIOMASS COMBUSTION SYSTEMS |
BS EN 297:1994 | Gas-fired central heating boilers. Type B<sub>11</sub> and B<sub>11BS</sub> boilers fitted with atmospheric burners of nominal heat input not exceeding 70 kW |
BS EN 12094-2:2003 | Fixed firefighting systems. Components for gas extinguishing systems Requirements and test methods for non-electrical automatic control and delay devices |
BS EN 12094-8:2006 | Fixed firefighting systems. Components for gas extinguishing systems Requirements and test methods for connectors |
EN 12094-2:2003 | Fixed firefighting systems - Components for gas extinguishing systems - Part 2: Requirements and test methods for non-electrical automatic control and delay devices |
EN 12094-8:2006 | Fixed firefighting systems - Components for gas extinguishing systems - Part 8: Requirements and test methods for connectors |
EN ISO 5366-1:2009 | Anaesthetic and respiratory equipment - Tracheostomy tubes - Part 1: Tubes and connectors for use in adults (ISO 5366-1:2000) |
I.S. EN 483:2000 | GAS-FIRED CENTRAL HEATING BOILERS - TYPE C BOILERS OF NOMINAL HEAT INPUT NOT EXCEEDING 70 KW |
14/30311499 DC : 0 | BS EN 15316-4-1 - HEATING SYSTEMS AND WATER BASED COOLING SYSTEMS IN BUILDINGS - METHOD FOR CALCULATION OF SYSTEM ENERGY REQUIREMENTS AND SYSTEM EFFICIENCIES - PART 4-1: SPACE HEATING AND DHW GENERATION SYSTEMS, COMBUSTION SYSTEMS (BOILERS, BIOMASS) |
12/30267093 DC : 0 | BS EN 15502-2-2 - GAS-FIRED CENTRAL HEATING BOILERS - PART 2-2: SPECIFIC STANDARD FOR TYPE B1 APPLIANCES OF A NOMINAL HEAT INPUT NOT EXCEEDING 70 KW |
ISO 13675:2013 | Heating systems in buildings — Method and design for calculation of the system energy performance — Combustion systems (boilers) |
DIN EN 15316-3-3:2008-06 | HEATING SYSTEMS IN BUILDINGS - METHOD FOR CALCULATION OF SYSTEM ENERGY REQUIREMENTS AND SYSTEM EFFICIENCIES - PART 3-3: DOMESTIC HOT WATER SYSTEMS, GENERATION |
BS EN 15316-3-3:2007 | Heating systems in buildings. Method for calculation of system energy requirements and system efficiencies Domestic hot water systems, generation |
PREN 50465 : DRAFT 2011 | GAS APPLIANCES - COMBINED HEAT AND POWER APPLIANCE OF NOMINAL HEAT INPUT INFERIOR OR EQUAL TO 70 KW |
PREN 50575 : DRAFT 2012 | POWER, CONTROL AND COMMUNICATION CABLES - CABLES FOR GENERAL APPLICATIONS IN CONSTRUCTION WORKS SUBJECT TO REACTION TO FIRE REQUIREMENTS |
DIN EN 12094-8:2006-07 | Fixed firefighting systems - Components for gas extinguishing systems - Part 8: Requirements and test methods for connectors |
I.S. EN 12094-8:2006 | FIXED FIREFIGHTING SYSTEMS - COMPONENTS FOR GAS EXTINGUISHING SYSTEMS - PART 8: REQUIREMENTS AND TEST METHODS FOR CONNECTORS |
BS 5655-11:2005 | Lifts and service lifts Code of practice for the undertaking of modifications to existing electric lifts |
VDI 3811:2016-07 | Refurbishment of heating installations |
VDI 2083 Blatt 8.1:2014-10 | Cleanroom technology - Air cleanliness chemical concentration (ACC) |
BS 5655-12:2005 | Lifts and service lifts Code of practice for the undertaking of modifications to existing hydraulic lifts |
BS PAS 67(2008) : 2008 | LABORATORY TESTS TO DETERMINE THE HEATING AND ELECTRICAL PERFORMANCE OF HEAT-LED MICRO-COGENERATION PACKAGES PRIMARILY INTENDED FOR HEATING DWELLINGS |
UNE-EN 15316-4-1:2010 | Heating systems in buildings - Method for calculation of system energy requirements and system efficiencies - Part 4-1: Space heating generation systems, combustion systems (boilers) |
BS EN 16325 : 2013 | GUARANTEES OF ORIGIN RELATED TO ENERGY - GUARANTEES OF ORIGIN FOR ELECTRICITY |
BS EN 15502-2-1 : 2012 | GAS-FIRED CENTRAL HEATING BOILERS - PART 2-1: SPECIFIC STANDARD FOR TYPE C APPLIANCES AND TYPE B2, B3 AND B5 APPLIANCES OF A NOMINAL HEAT INPUT NOT EXCEEDING 1000 KW |
CSA P.9 : 2011 | TEST METHOD FOR DETERMINING THE PERFORMANCE OF COMBINED SPACE AND WATER HEATING SYSTEMS (COMBOS) |
CSA P.9 : 2011 : R2015 | TEST METHOD FOR DETERMINING THE PERFORMANCE OF COMBINED SPACE AND WATER HEATING SYSTEMS (COMBOS) |
CSA P.9 : 2011 : INC : UPD 1 : 2012 | TEST METHOD FOR DETERMINING THE PERFORMANCE OF COMBINED SPACE AND WATER HEATING SYSTEMS (COMBOS) |
BS EN ISO 20072:2013 | Aerosol drug delivery device design verification. Requirements and test methods |
PREN 12878 : DRAFT 2012 | PIGMENTS FOR THE COLOURING OF BUILDING MATERIALS BASED ON CEMENT AND/OR LIME - SPECIFICATIONS AND METHODS OF TEST |
CEI UNI EN 15900 : 2016 | ENERGY EFFICIENCY SERVICES - DEFINITIONS AND REQUIREMENTS |
DIN EN 15316-4-7:2009-02 | HEATING SYSTEMS IN BUILDINGS - METHOD FOR CALCULATION OF SYSTEM ENERGY REQUIREMENTS AND SYSTEM EFFICIENCIES - PART 4-7: SPACE HEATING GENERATION SYSTEMS, BIOMASS COMBUSTION SYSTEMS |
12/30259025 DC : 0 | BS EN 50575 - POWER, CONTROL AND COMMUNICATION CABLES - CABLES FOR GENERAL APPLICATIONS IN CONSTRUCTION WORKS SUBJECT TO REACTION TO FIRE REQUIREMENTS |
I.S. EN 15316-3-3:2007 | HEATING SYSTEMS IN BUILDINGS - METHOD FOR CALCULATION OF SYSTEM ENERGY REQUIREMENTS AND SYSTEM EFFICIENCIES - PART 3-3: DOMESTIC HOT WATER SYSTEMS, GENERATION |
I.S. EN 15316-4-7:2008 | HEATING SYSTEMS IN BUILDINGS - METHOD FOR CALCULATION OF SYSTEM ENERGY REQUIREMENTS AND SYSTEM EFFICIENCIES - PART 4-7: SPACE HEATING GENERATION SYSTEMS, BIOMASS COMBUSTION SYSTEMS |
DIN EN 12094-8:2016-06 (Draft) | FIXED FIREFIGHTING SYSTEMS - COMPONENTS FOR GAS EXTINGUISHING SYSTEMS - PART 8: REQUIREMENTS AND TEST METHODS FOR CONNECTORS |
BS EN 15035:2006 | Heating boilers. Special requirements for oil fired room sealed units up to 70 kW |
BS EN 677:1998 | Gas-fired central heating boilers. Specific requirements for condensing boilers with a nominal heat input not exceeding 70 kW |
BS EN 13836:2006 | Gas fired central heating boilers. Type B boilers of nominal heat input exceeding 300 kW, but not exceeding 1000 kW |
BS EN 483 : 2000 | GAS-FIRED CENTRAL HEATING BOILERS - TYPE C BOILERS OF NOMINAL HEAT INPUT NOT EXCEEDING 70 KW |
EN 16325 : 2013 COR 2016 | GUARANTEES OF ORIGIN RELATED TO ENERGY - GUARANTEES OF ORIGIN FOR ELECTRICITY |
EN 15456:2008 | Heating boilers - Electrical power consumption for heat generators - System boundaries - Measurements |
EN 15316-3-3:2007 | Heating systems in buildings - Method for calculation of system energy requirements and system efficiencies - Part 3-3: Domestic hot water systems, generation |
EN ISO 10651-2:2009 | Lung ventilators for medical use - Particular requirements for basic safety and essential performance - Part 2: Home care ventilators for ventilator-dependent patients (ISO 10651-2:2004) |
EN 15420:2010 | Gas-fired central heating boilers - Type C boilers of nominal heat input exceeding 70 kW, but not exceeding 1 000 kW |
EN 15035:2006 | Heating boilers - Special requirements for oil fired room sealed units up to 70 kW |
EN 15316-4-7:2008 | Heating systems in buildings - Method for calculation of system energy requirements and system efficiencies - Part 4-7: Space heating generation systems, biomass combustion systems |
EN 16214-4:2013 | Sustainability criteria for the production of biofuels and bioliquids for energy applications - Principles, criteria, indicators and verifiers - Part 4: Calculation methods of the greenhouse gas emission balance using a life cycle analysis approach |
EN 15502-2-1:2012+A1:2016 | Gas-fired central heating boilers - Part 2-1: Specific standard for type C appliances and type B2, B3 and B5 appliances of a nominal heat input not exceeding 1 000 kW |
EN 13836:2006 | Gas fired central heating boilers - Type B boilers of nominal heat input exceeding 300 kW, but not exceeding 1 000 kW |
12/30270909 DC : 0 | BS EN 50438 - REQUIREMENTS FOR THE CONNECTION OF MICRO-GENERATORS IN PARALLEL WITH PUBLIC LOW VOLTAGE DISTRIBUTION NETWORKS |
BS EN 15456:2008 | Heating boilers. Electrical power consumption for heat generators. System boundaries. Measurements |
11/30249911 DC : 0 | BS EN 50465 - GAS APPLIANCES - COMBINED HEAT AND POWER APPLIANCE OF NOMINAL HEAT INPUT INFERIOR OR EQUAL TO 70 KW |
12/30239784 DC : 0 | BS ISO 13675 - HEATING AND COOLING SYSTEMS IN BUILDINGS - METHOD AND DESIGN FOR CALCULATION OF THE SYSTEM ENERGY PERFORMANCE - COMBUSTION SYSTEMS (BOILERS) |
BS ISO 13675:2013 | Heating systems in buildings. Method and design for calculation of the system energy performance. Combustion systems (boilers) |
11/30229088 DC : 0 | BS 5655-6 - LIFTS AND SERVICE LIFTS - PART 6: CODE OF PRACTICE FOR THE SELECTION AND INSTALLATION OF NEW LIFTS |
CSA P.10 :2007 | PERFORMANCE OF INTEGRATED MECHANICAL SYSTEMS FOR RESIDENTIAL HEATING AND VENTILATION |
BS EN 15502-1 : 2012 | GAS-FIRED HEATING BOILERS - PART 1: GENERAL REQUIREMENTS AND TESTS |
BS EN 16214-4:2013 | Sustainability criteria for the production of biofuels and bioliquids for energy applications. Principles, criteria, indicators and verifiers Calculation methods of the greenhouse gas emission balance using a life cycle analysis approach |
UNE-EN 15316-4-7:2010 | Heating systems in buildings - Method for calculation of system energy requirements and system efficiencies - Part 4-7: Space heating generation systems, biomass combustion systems |
PREN 50438 : DRAFT 2012 | REQUIREMENTS FOR THE CONNECTION OF MICRO-GENERATORS IN PARALLEL WITH PUBLIC LOW VOLTAGE DISTRIBUTION NETWORKS |
EN 15502-1:2012+A1:2015 | Gas-fired heating boilers - Part 1: General requirements and tests |
DIN EN 13836:2007-06 | Gas-fired central heating boilers - Type B boilers of nominal heat input exceeding 300 kW, but not exceeding 1000 kW |
Access your standards online with a subscription
Features
-
Simple online access to standards, technical information and regulations.
-
Critical updates of standards and customisable alerts and notifications.
-
Multi-user online standards collection: secure, flexible and cost effective.