BS 5192-2:1993
Current
The latest, up-to-date edition.
Guide to production control Production programming
Hardcopy , PDF
English
15-03-1993
Committees responsible
Foreword
Guide
0 Introduction
1 Scope
2 References
3 Definitions
4 Production programming
5 Master production schedule (MPS)
6 Capacity planning
Figures
1 Stages of production control
2 Closed loop system
3 Master production schedule horizon
4 MPS make-to-stock
5 MPS make-to-order
6 MPS make-to-stock/complete-to-order
7 Infinite capacity loading
8 Finite capacity loading
List of references
Access your standards online with a subscription
Features
-
Simple online access to standards, technical information and regulations.
-
Critical updates of standards and customisable alerts and notifications.
-
Multi-user online standards collection: secure, flexible and cost effective.