ACI 351.5M : 2015
Current
The latest, up-to-date edition.
SPECIFICATION FOR INSTALLATION OF EPOXY GROUT BETWEEN FOUNDATIONS AND EQUIPMENT BASES (METRIC)
01-09-2015
PART 1 - GENERAL
PART 2 - PRODUCTS
PART 3 - EXECUTION
NOTES TO SPECIFIER
MANDATORY REQUIREMENTS CHECKLIST
Specifies minimum requirements for epoxy grouting between foundations and equipment bases. Included are requirements for materials, placement, and quality control.
| Committee |
351
|
| DocumentType |
Standard
|
| PublisherName |
American Concrete Institute
|
| Status |
Current
|
| ASTM C 1107 : 2007 | SPECIFICATION FOR PACKAGED DRY, HYDRAULIC-CEMENT GROUT (NONSHRINK) |
| ACI 117M : 2010 | SPECIFICATION FOR TOLERANCES FOR CONCRETE CONSTRUCTION AND MATERIALS AND COMMENTARY |
| ACI 301M : 2016 | SPECIFICATIONS FOR STRUCTURAL CONCRETE |
Access your standards online with a subscription
-
Simple online access to standards, technical information and regulations.
-
Critical updates of standards and customisable alerts and notifications.
-
Multi-user online standards collection: secure, flexible and cost effective.