
ACI 522.1M : 2013
Withdrawn
A Withdrawn Standard is one, which is removed from sale, and its unique number can no longer be used. The Standard can be withdrawn and not replaced, or it can be withdrawn and replaced by a Standard with a different number.

SPECIFICATION FOR PERVIOUS CONCRETE PAVEMENT (METRIC)
30-01-2025
01-10-2013
PART 1 - GENERAL
PART 2 - PRODUCTS
PART 3 - EXECUTION
NOTES TO SPECIFIER
General Notes
FOREWORD TO CHECKLISTS
MANDATORY REQUIREMENTS CHECKLIST
SUBMITTALS CHECKLIST
Specifies materials, preparation, forming, placing, finishing, jointing, curing, and quality control of pervious concrete pavement.
Committee |
522
|
DocumentType |
Standard
|
PublisherName |
American Concrete Institute
|
Status |
Withdrawn
|
ACI 305.1 : 2014 | SPECIFICATION FOR HOT WEATHER CONCRETING |
ACI 305.1M : 2014 | SPECIFICATION FOR HOT WEATHER CONCRETING (METRIC) |
Access your standards online with a subscription
Features
-
Simple online access to standards, technical information and regulations.
-
Critical updates of standards and customisable alerts and notifications.
-
Multi-user online standards collection: secure, flexible and cost effective.
Logging out.