ACMP-1 : 2007
Current
The latest, up-to-date edition.
NATO REQUIREMENTS FOR THE PREPARATION OF CONFIGURATION MANAGEMENT PLANS
Hardcopy , PDF
English
01-02-2007
FOREWORD
1 SCOPE
1.1 Purpose
1.2 Applicability
1.3 Application Guidance
2 RELATED DOCUMENTS
2.1 NATO Documents
2.2 Order of Precedence
2.3 Detailed Guidance
3 DEFINITIONS
4 GENERAL REQUIREMENTS
4.1 General
4.2 Objectives
4.3 Implementation
5 DETAILED REQUIREMENTS
5.1 Format
5.2 Content
5.6 Organization
5.7 Configuration Identification and Documentation
5.8 Configuration Control
Specifies uniform requirements for contractor prepared CMP.
| DocumentType |
Standard
|
| Pages |
20
|
| PublisherName |
NATO
|
| Status |
Current
|
| ACMP-5 : 2007 | NATO REQUIREMENTS FOR CONFIGURATION AUDITS |
| AAP-48 : 2013 | NATO SYSTEM LIFE CYCLE STAGES AND PROCESSES |
| ACMP-2 : 2007 | NATO REQUIREMENTS FOR CONFIGURATION IDENTIFICATION |
| ACMP-4 : 2007 | NATO REQUIREMENTS FOR CONFIGURATION STATUS ACCOUNTING AND CONFIGURATION DATA MANAGEMENT |
| ACMP-3 : 2007 | NATO REQUIREMENTS FOR CONFIGURATION CONTROL - ENGINEERING CHANGES, DEVIATIONS AND WAIVERS |
| ACMP-7 : 2007 | NATO CONFIGURATION MANAGEMENT GUIDANCE ON THE APPLICATION OF ACMP 1-6 |
| ACMP-5 : 2007 | NATO REQUIREMENTS FOR CONFIGURATION AUDITS |
| ACMP-3 : 2007 | NATO REQUIREMENTS FOR CONFIGURATION CONTROL - ENGINEERING CHANGES, DEVIATIONS AND WAIVERS |
| ACMP-2 : 2007 | NATO REQUIREMENTS FOR CONFIGURATION IDENTIFICATION |
| ACMP-6 : 2007 | NATO CONFIGURATION MANAGEMENT TERMS AND DEFINITIONS |
| ACMP-4 : 2007 | NATO REQUIREMENTS FOR CONFIGURATION STATUS ACCOUNTING AND CONFIGURATION DATA MANAGEMENT |
| STANAG 4159 : 0 | NATO MATERIAL CONFIGURATION MANAGEMENT POLICY AND PROCEDURES FOR MULTINATIONAL JOINT PROJECTS |
Access your standards online with a subscription
-
Simple online access to standards, technical information and regulations.
-
Critical updates of standards and customisable alerts and notifications.
-
Multi-user online standards collection: secure, flexible and cost effective.