• Shopping Cart
    There are no items in your cart

ADATP-11 VOL 1 : 2006

Current

Current

The latest, up-to-date edition.

STANDARD OPERATING PROCEDURES FOR NATO LINK 11 AND LINK 11B

Published date

01-01-2006

Publisher

NATO

Sorry this product is not available in your region.

VOLUME 1
CHAPTER 1 - GENERAL INFORMATION
Section:
1 Introduction.
2 Concept of Operations
3 System Description
CHAPTER 2 - OPERATIONAL PLANNING OF LINK 11/LINK 11B
            ARCHITECTURES
Section:
1 Considerations for Planning of Link 11/Link 11B
   Architectures
2 Allocation of Responsibilities and Duties
3 Link 11/Link 11B Modes of Operation
4 Participating Units and Reporting Units
5 Assignment of Track Numbers
6 Communication Requirements
7 Link Security
8 Automatic Correlation/Decorrelation
CHAPTER 3 - ESTABLISHMENT AND CONTROL OF A LINK 11 NET
Section:
1 Establishment of a Link 11 Net
2 Link 11 Specific Duties
3 Link 11 Net Modes
4 Procedures for Initiating a Link 11 Net
5 Procedures for Leaving and Terminating a Link 11 Net
6 Changing Link 11 Parameters
7 Link 11 Gridlock
8 Link 11 Communication Requirements
9 Link 11 Frequency Guide
10 Link 11 Security
11 UHF Link 11 Operations
12 Frequency Locking
13 Variable Track Quality
CHAPTER 4 - ESTABLISHMENT AND CONTROL OF LINK 11B
            ARCHITECTURES
Section:
1 Establishment of Link 11B Communications
2 Link 11B Specific Duties
3 Link 11B Modes/States
4 Preparing for Link 11B Operations
5 Procedures for Link 11B Initialisation/Reinitialisation
6 Terminating Link 11B Communications
7 Changing Link 11B Parameters
8 Link 11B Registration
9 Link 11B Communication Requirements
10 Link 11B Security
CHAPTER 5 - TRACK MANAGEMENT
Section:
1 Coordination
2 Control of Transmissions
3 Identities
4 Reporting Responsibilities
5 Correlation and Decorrelation
6 Information Differences
7 Changing Track Numbers
8 Cease Reporting
9 Dropping Tracks
10 NonReal-Time Tracks
11 Special Processing
12 Data Forwarding
13 Simulated Data
CHAPTER 6 - LINK MANAGEMENT CODES
Link Management Codes
CHAPTER 7 - LINK 11 TESTING
Section:
1 Data Terminal Test Requirements
2 Performance Operational Function Analysis (POFA)
3 Monitoring Link 11 Net Reliability
4 Conducting a Multi-Station POFA
CHAPTER 8 - COMMAND AND CONTROL FUNCTIONS
Section:
1 Link 11/Link 11B Functional Areas
2 Use of TEXT MESSAGE (M12.2.3/812.2.3)
3 Command and Control on Link 11/Link 11B
4 Weapons Coordination and Management
5 Air Control.
6 Theatre Missile Defence
7 Force Disposition and the Use of Link 11/Link 11B
8 Operation with Non-TDS Units
CHAPTER 9 - ELECTRONIC WARFARE COORDINATION AND CONTROL
Section:
1 General
2 EW Orders and Requests
3 EW Track Associations
4 ESM/ECM Intercept Reporting
CHAPTER 10 - ANTI-SUBMARINE WARFARE
TBD:
CHAPTER 11 - OPERATION OF LINK 11/LINK 11B IN A MULTI-LINK
             INTERFACE
Section:
1 Other Data Links
2 Examples of Complex Link Architectures
3 Operation of IJMS and Link 11/Link 11B Interface
4 Operation of Link 16 and Link 11/Link 11B Interface
ANNEXES
ANNEX A - Main Content of Individual Messages
Appendix 1 Main Content of Individual Messages
ANNEXB - Terms and Definitions
Appendix 1 - Codewords and Net Control Codewords
ANNEX C - Link 11 Checkout Procedures
Appendix
1 Checkout Procedure Data
2 Checkout Conduct Procedures
3 Checkout Procedure and Checkout Conduct Log
4 Mandatory and Optional Tests for Systems by Functional
   Areas
VOLUME 2
NATIONAL SUPPLEMENTS TO ALLIED DATA PROCESSING PUBLICATION 11(E)
NS 1 - Belgium
Annex A - National Link 11 Units
Annex B - System Message Implementation Matrix
Annex C - System Capabilities of Link 11 Units
Annex D - Link 11 Shore/Training/Exercise Facility
NS 2 - Canada
Annex A - National Link 11 Units
Annex B - System Message Implementation Matrix
Annex C - System Capabilities of Link 11 Units
Annex D - Link 11 Shore/Training/Exercise Facility
NS 3 - Denmark
Annex A - National Link 11 Units
Annex B - System Message Implementation Matrix
Annex C - System Capabilities of Link 11 Units
Annex D - Link 11 Shore/Training/Exercise Facility
NS 4 - France
Annex A - National Link 11 Units
Annex B - System Message Implementation Matrix
Annex C - System Capabilities of Link 11 Units
Annex D - Link 11 Shore/Training/Exercise Facility
NS 5 - Germany
Annex A - National Link 11 Units
Annex B - System Message Implementation Matrix
Annex C - System Capabilities of Link 11 Units
Annex D - Link 11 Shore/Training/Exercise Facility
NS 6 - Greece
Annex A - National Link 11 Units
Annex B - System Message Implementation Matrix
Annex C - System Capabilities of Link 11 Units
Annex D - Link 11 Shore/Training/Exercise Facility
NS 7 - Italy
Annex A - National Link 11 Units
Annex B - System Message Implementation Matrix
Annex C - System Capabilities of Link 11 Units
Annex D - Link 11 Shore/Training/Exercise Facility
NS 8 - NATO E-3A
Annex A - National Link 11 Units
Annex B - System Message Implementation Matrix
Annex C - System Capabilities of Link 11 Units
Annex D - Link 11 Shore/Training/Exercise Facility
NS 9 - Netherlands
Annex A - National Link 11 Units
Annex B - System Message Implementation Matrix
Annex C - System Capabilities of Link 11 Units
Annex D - Link 11 Shore/Training/Exercise Facility
NS 10 - Norway
Annex A - National Link 11 Units
Annex B - System Message Implementation Matrix
Annex C - System Capabilities of Link 11 Units
Annex D - Link 11 Shore/Training/Exercise Facility
NS 11 - Portugal
Annex A - National Link 11 Units
Annex B - System Message Implementation Matrix
Annex C - System Capabilities of Link 11 Units
Annex D - Link 11 Shore/Training/Exercise Facility
NS 12 - SpainNS-SP-A-1
Annex A - National Link 11 Units
Annex B - System Message Implementation Matrix
Annex C - System Capabilities of Link 11 Units
Annex D - Link 11 Shore/Training/Exercise Facility
NS 13 - Turkey
Annex A - National Link 11 Units
Annex B - System Message Implementation Matrix
Annex C - System Capabilities of Link 11 Units
Annex D - Link 11 Shore/Training/Exercise Facility
NS 14 - United Kingdom
Annex A - National Link 11 Units
Annex B - System Message Implementation Matrix
Annex C - System Capabilities of Link 11 Units
Annex D - Link 11 Shore/Training/Exercise Facility
NS 15 - United States
Annex A - National Link 11 Units
Annex B - System Message Implementation Matrix
Annex C - System Capabilities of Link 11 Units
Annex D - Link 11 Shore/Training/Exercise Facility

Purpose of these Standard Operating Procedures (SOPs) is to give guidance to Operational Commanders, Tactical Commanders and to individual units, in the: a. Establishment, entry into, operation, alteration, exit from and termination of a data Link 11 net. b. Commencement, maintenance and termination of Link 11B communications. c. Establishment and operations of associated voice control circuits.

DocumentType
Standard
PublisherName
NATO
Status
Current

ADATP-33 : 2006 MULTI-LINK STANDARD OPERATING PROCEDURES FOR TACTICAL DATA SYSTEMS EMPLOYING LINK 16, LINK 11, LINK 11B, IJMS, LINK 1, LINK 4, AND ATDL-1
STANAG 5501 : 2006 DIGITAL DATA LINK - LINK 1 (POINT-TO-POINT)
STANAG 5511 : 2006 TACTICAL DATA EXCHANGE - LINK 11/LINK 11B
STANAG 5516 : 2006 TACTICAL DATA EXCHANGE - LINK 16
STANAG 1068 : 2013 THE ALLIED MARITIME ABOVE WATER WARFARE EXERCISE MANUAL

Access your standards online with a subscription

Features

  • Simple online access to standards, technical information and regulations.

  • Critical updates of standards and customisable alerts and notifications.

  • Multi-user online standards collection: secure, flexible and cost effective.