• There are no items in your cart

AIAG APQP : 2ED 2008

Superseded

Superseded

A superseded Standard is one, which is fully replaced by another Standard, which is a new edition of the same Standard.

View Superseded by

ADVANCED PRODUCT QUALITY PLANNING AND CONTROL PLAN (APQP)

Available format(s)

Hardcopy

Superseded date

12-03-2024

Superseded by

AIAG APQP-3:2024

Language(s)

English

Published date

12-01-2013

Introduction
Product Quality Planning Responsibility Matrix
Fundamentals of Product Quality Planning
Product Quality Planning Timing Chart
1.0 Plan and Define Program
2.0 Product Design and Development
3.0 Process Design and Development
4.0 Product and Process Validation
5.0 Feedback, Assessment and Corrective Action
6.0 Control Plan Methodology
Appendix A
Appendix B
Appendix C
Appendix D
Appendix E
Appendix F
Appendix G
Appendix H
Appendix I
Appendix J
Appendix K
Appendix L

Gives general guidelines for ensuring the Advanced Product Quality Planning is implemented in accordance with the requirements of the customer.

DevelopmentNote
Also included in kit AIAG CT-K. (12/2008)
DocumentType
Standard
Pages
0
PublisherName
Automotive Industry Action Group
Status
Superseded
SupersededBy

IPC 9194 : 0 IMPLEMENTATION OF STATISTICAL PROCESS CONTROL (SPC) APPLIED TO PRINTED BOARD ASSEMBLY MANUFACTURE GUIDELINE
SAE USCAR 3 : 2009 SPECIFICATION FOR TESTING AUTOMOTIVE MINIATURE BULBS
SAE USCAR 15 : 2010 SPECIFICATION FOR TESTING AUTOMOTIVE LIGHT BULB SOCKETS
SAE USCAR 27 : 2007 SPECIFICATION FOR TESTING GAS DISCHARGE LIGHT SOURCE SUBSYSTEM
SAE USCAR 33 : 2013 SPECIFICATION FOR TESTING AUTOMOTIVE LED MODULES

Access your standards online with a subscription

Features

  • Simple online access to standards, technical information and regulations.

  • Critical updates of standards and customisable alerts and notifications.

  • Multi-user online standards collection: secure, flexible and cost effective.