ANS 2.23:2016(R2020)
Current
The latest, up-to-date edition.
Nuclear Plant Response to an Earthquake
Hardcopy , PDF
English
16-11-2020
It describes actions that the owner of a nuclear power plant shall take to prepare for and respond to a felt earthquake at the plant(s), including the need for plant shutdown; actions to determine the readiness of the plant to resume operation; and those evaluations necessary to verify the long-term integrity of safety-related (SR) and important structures, systems, and components (SSCs).
Access your standards online with a subscription
Features
-
Simple online access to standards, technical information and regulations.
-
Critical updates of standards and customisable alerts and notifications.
-
Multi-user online standards collection: secure, flexible and cost effective.